1,017 projects in 50 states and DC, 71.9 GW of disclosed capacity. Each record is sourced and dated. 58 sites with no stage yet are listed under Not yet verified.
AlasConnect LLC operates a commercial colocation and cloud hosting data center at 612 Illinois Street in Fairbanks, Fairbanks North Star Borough, Alaska.
AlasConnect LLC operates a commercial colocation and cloud hosting data center at 612 Illinois Street in Fairbanks, Fairbanks North Star Borough, Alaska.
American Domain Names LLC operates the USNAMES enterprise hosting and colocation facility at 3422 Old Capitol Trail in Wilmington, New Castle County, Delaware.
American Domain Names LLC operates the USNAMES enterprise hosting and colocation facility at 3422 Old Capitol Trail in Wilmington, New Castle County, Delaware.
Proposed data center facility at 945 Breaker Street in Jessup, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Proposed data center facility at 945 Breaker Street in Jessup, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
CENTRA Digital Interconnect operates the PWM1 carrier neutral interconnection and colocation facility at 340 Cumberland Avenue in Portland, Cumberland County, Maine.
CENTRA Digital Interconnect operates the PWM1 carrier neutral interconnection and colocation facility at 340 Cumberland Avenue in Portland, Cumberland County, Maine.
Citizens Financial Group Inc. operates its primary enterprise data center and backup generator plant at 1 Citizens Drive in East Providence, Providence County, Rhode Island, permitted under Rhode Island DEM and US EPA FRS ID 110070358214.
CleanSpark subsidiary CSRE Properties South Dakota LLC executed an electric service agreement with Black Hills Power filed at the South Dakota Public Utilities Commission in April 2026 for a proposed data center in Rapid City, Pennington County, South Dakota.
CleanSpark subsidiary CSRE Properties South Dakota LLC executed an electric service agreement with Black Hills Power filed at the South Dakota Public Utilities Commission in April 2026 for a proposed data center in Rapid City, Pennington County, South Dakota.
Consolidated Communications Inc. operates a commercial colocation and fiber interconnection facility at 266 Main Street in Burlington, Chittenden County, Vermont.
CoreSite operates the DC1 carrier hotel and colocation data center at 1275 K Street NW in downtown Washington, District of Columbia, serving federal agencies, cloud providers, and network operators.
CoreSite operates the DC1 carrier hotel and colocation data center at 1275 K Street NW in downtown Washington, District of Columbia, serving federal agencies, cloud providers, and network operators.
CoreSite operates the DC2 colocation data center at 1099 14th Street NW in Washington, District of Columbia, interconnected by dark fiber to the CoreSite DC1 and Northern Virginia campuses.
CoreSite operates the DC2 colocation data center at 1099 14th Street NW in Washington, District of Columbia, interconnected by dark fiber to the CoreSite DC1 and Northern Virginia campuses.
Crown Castle Inc. operates a fiber interconnection and colocation facility inside the Foundry campus at 235 Promenade Street in Providence, Providence County, Rhode Island.
Dartmouth College operates a high performance computing and research data center at 56 Etna Road in Lebanon, Grafton County, New Hampshire, tracked in the US EPA Facility Registry Service.
Dartmouth College operates a high performance computing and research data center at 56 Etna Road in Lebanon, Grafton County, New Hampshire, tracked in the US EPA Facility Registry Service.
A state board upheld the environmental denial of a data center proposed for Delaware City, confirming rejection of the project on environmental grounds; the project was also exempted from new state data center regulations that took effect in March 2026.
A state board upheld the environmental denial of a data center proposed for Delaware City, confirming rejection of the project on environmental grounds; the project was also exempted from new state data center regulations that took effect in March 2026.
FirstLight Fiber operates a commercial colocation data center inside the former naval command building at Brunswick Landing in Brunswick, Cumberland County, Maine.
FirstLight Fiber operates a commercial colocation data center inside the former naval command building at Brunswick Landing in Brunswick, Cumberland County, Maine.
FirstLight Fiber operates a commercial colocation and disaster recovery data center at 8 Commerce Drive in Bedford, Hillsborough County, New Hampshire.
FirstLight Fiber operates a commercial colocation and disaster recovery data center at 8 Commerce Drive in Bedford, Hillsborough County, New Hampshire.
Greensparc and Cordova Electric Cooperative commissioned a 170 kilowatt edge compute data center in 2024 at the Humpback Creek hydroelectric facility in Cordova, Chugach Census Area, Alaska.
Greensparc and Cordova Electric Cooperative commissioned a 170 kilowatt edge compute data center in 2024 at the Humpback Creek hydroelectric facility in Cordova, Chugach Census Area, Alaska.
Hawaii Pacific Data LLC operates the AlohaNAP carrier neutral data center and satellite teleport facility at 91 340 Farrington Highway in Kapolei, Honolulu County, Hawaii.
Hawaii Pacific Data LLC operates the AlohaNAP carrier neutral data center and satellite teleport facility at 91 340 Farrington Highway in Kapolei, Honolulu County, Hawaii.
IPR International developed and operated a commercial colocation data center inside the 1201 North Market Street tower in downtown Wilmington, New Castle County, Delaware.
IPR International developed and operated a commercial colocation data center inside the 1201 North Market Street tower in downtown Wilmington, New Castle County, Delaware.
Liberty Mutual Insurance operates a regional enterprise data center at 225 Borthwick Avenue in Portsmouth, Rockingham County, New Hampshire, tracked in the US EPA Facility Registry Service.
Liberty Mutual Insurance operates a regional enterprise data center at 225 Borthwick Avenue in Portsmouth, Rockingham County, New Hampshire, tracked in the US EPA Facility Registry Service.
Lumen Technologies Inc. operates a network colocation and enterprise interconnection facility at 155 Locust Street in Hartford, Capitol Planning Region, Connecticut.
A proposed hyperscale data center development on 1,000 acres of farmland acquired near Mt.
A proposed hyperscale data center development on 1,000 acres of farmland acquired near Mt. Orab in Brown County, Ohio, which prompted local attorney Nick Owens to found Conserve Ohio and organize statewide pushback ahead of the 2026 midterm elections.
Project Boson proposed data center campus at the Highway Auto site on Eynon Jermyn Road in Archbald, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Project Boson proposed data center campus at the Highway Auto site on Eynon Jermyn Road in Archbald, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Project Green Mountain proposed data center campus on Eynon Jermyn Road in Archbald, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Project Green Mountain proposed data center campus on Eynon Jermyn Road in Archbald, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Servpac Inc. operates a Tier 3 commercial cloud and colocation data center at 200 Kahelu Avenue in Mililani Technology Park, Honolulu County, Hawaii, with solar and battery microgrid backup.
SDN Communications operates a regional fiber interconnection and colocation data center campus at 2900 West 10th Street in Sioux Falls, Minnehaha County, South Dakota.
SDN Communications operates a regional fiber interconnection and colocation data center campus at 2900 West 10th Street in Sioux Falls, Minnehaha County, South Dakota.
Verdantas submitted exploratory land development plans in December 2025 to New Castle County for a 676,000 square foot industrial and data center park at White Clay Center Drive near Newark, Delaware.
Verdantas submitted exploratory land development plans in December 2025 to New Castle County for a 676,000 square foot industrial and data center park at White Clay Center Drive near Newark, Delaware.
O'Leary Digital and the Military Installation Development Authority (MIDA) propose the Stratos Project data center campus in Hansel Valley, Box Elder County, Utah, north of the Great Salt Lake.
O'Leary Digital and the Military Installation Development Authority (MIDA) propose the Stratos Project data center campus in Hansel Valley, Box Elder County, Utah, north of the Great Salt Lake. State filings specify a 7.5 GW long term buildout (7,500 MW, with up to 1.5 to 2 GW in Phase 1) powered by on site methane gas reciprocating internal combustion engines (RICE) fed via the Ruby Pipeline, alongside MIDA and developer figures of 9.0 GW (9,000 MW, modeled in the October 26, 2026 EmPower Analytics Group air dispersion report) and an upper bound of 9.5 GW (9,500 MW) reported by KSL.com on September 24, 2026. Box Elder County commissioners consented to the 40,000 acre MIDA project area on May 4, 2026 and exempted Stratos from the county's 180 day data center moratorium adopted June 17, 2026; following pushback from Utah Senate President J. Stuart Adams, O'Leary Digital stated on June 4 and October 1, 2026 that the campus footprint would be reduced to roughly 13,000 to 20,000 acres, though no surveyed MIDA boundary amendment has been filed. Utah Division of Water Rights Change Application a55167 on Water Right 13 2 seeks 1,712 acre feet a year (1,528,767 gallons a day withdrawal), while three lawsuits proceed in state and federal court.
Proposed data center facility at 751 Sunnyside Road in Jessup, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Proposed data center facility at 751 Sunnyside Road in Jessup, Lackawanna County, Pennsylvania, tracked on the Pennsylvania Department of Environmental Protection permit register.
Tech Vault Inc. operates a commercial colocation, cloud hosting, and disaster recovery data center at 21 Gregory Drive in South Burlington, Chittenden County, Vermont.
Vantage Data Centers proposed Project Trident, a hyperscale data center campus near Green Valley Ranch in Aurora, Adams County, Colorado, which prompted Aurora City Council votes rejecting a moratorium in August 2026 and again by a 6 to 5 procedural vote on October 27, 2026 alongside a citywide ban on evaporative cooling.
Vantage Data Centers proposed Project Trident, a hyperscale data center campus near Green Valley Ranch in Aurora, Adams County, Colorado, which prompted Aurora City Council votes rejecting a moratorium in August 2026 and again by a 6 to 5 procedural vote on October 27, 2026 alongside a citywide ban on evaporative cooling.
Vermont Electric Power Company Inc. operates its statewide fiber optic network and primary transmission grid data center at 366 Pinnacle Ridge Road in Rutland, Rutland County, Vermont.
The former Vermont Yankee site in Vernon is being explored for potential redevelopment with options including a data center, nuclear reactor, or battery storage, with the Vernon community and state grappling with the decision.
The former Vermont Yankee site in Vernon is being explored for potential redevelopment with options including a data center, nuclear reactor, or battery storage, with the Vernon community and state grappling with the decision.
1025Connect operates the Long Island subsea cable interconnection and carrier hotel data center at 1025 Old Country Road in Westbury, Nassau County, New York, with 6 MW of power capacity.
1025Connect operates the Long Island subsea cable interconnection and carrier hotel data center at 1025 Old Country Road in Westbury, Nassau County, New York, with 6 MW of power capacity.
Lighthouse Data Centers and Wharton Digital submitted a site application on April 28, 2026 for a data center campus at 300 Jones Road in Spartanburg County, South Carolina.
Lighthouse Data Centers and Wharton Digital submitted a site application on April 28, 2026 for a data center campus at 300 Jones Road in Spartanburg County, South Carolina.
365 Data Centers operates its BC1 Boca Raton colocation and network interconnection facility at 3500 NW Boca Raton Boulevard in Boca Raton, Palm Beach County, Florida.
365 Data Centers operates its BC1 Boca Raton colocation and network interconnection facility at 3500 NW Boca Raton Boulevard in Boca Raton, Palm Beach County, Florida.
365 Data Centers operates its BW1 Central New Jersey colocation facility at 999 Frontier Road in Bridgewater, Somerset County, New Jersey, with 6 MW of critical power.
365 Data Centers operates its BW1 Central New Jersey colocation facility at 999 Frontier Road in Bridgewater, Somerset County, New Jersey, with 6 MW of critical power.
365 Data Centers operates its NJ3 Meadowlands colocation facility at 410 Commerce Boulevard in Carlstadt, Bergen County, New Jersey, providing 6 MW of power capacity.
365 Data Centers operates its NJ3 Meadowlands colocation facility at 410 Commerce Boulevard in Carlstadt, Bergen County, New Jersey, providing 6 MW of power capacity.
365 Data Centers operates its CNY Long Island colocation facility at 500 Commack Road in Commack, Suffolk County, New York, delivering 6 MW of power capacity.
365 Data Centers operates its CNY Long Island colocation facility at 500 Commack Road in Commack, Suffolk County, New York, delivering 6 MW of power capacity.
365 Data Centers operates its NY10 Financial District colocation and network PoP facility at 65 Broadway in Lower Manhattan, New York County, with 4 MW of critical power.
365 Data Centers operates its NY10 Financial District colocation and network PoP facility at 65 Broadway in Lower Manhattan, New York County, with 4 MW of critical power.
11:11 Systems (formerly Sungard Availability Services and 365 SG Operating) operates the 8 MW CO1 enterprise colocation and recovery data center at 3431 North Windsor Drive in Aurora, Adams County, Colorado (EPA FRS ID 110064241887).
11:11 Systems (formerly Sungard Availability Services and 365 SG Operating) operates the 8 MW CO1 enterprise colocation and recovery data center at 3431 North Windsor Drive in Aurora, Adams County, Colorado (EPA FRS ID 110064241887).
5C Data Centers is expanding its MEM01 AI factory data center at 4300 Getwell Road in Memphis, Shelby County, Tennessee, to 84 MW across a 1.1 million square foot campus under a 575 million dollar Phase 4 commercial alteration permit.
5C Data Centers is expanding its MEM01 AI factory data center at 4300 Getwell Road in Memphis, Shelby County, Tennessee, to 84 MW across a 1.1 million square foot campus under a 575 million dollar Phase 4 commercial alteration permit.
Affordable Internet Services Online (AISO) operates an onsite solar powered commercial colocation and hosting data center at 25655 Louisa Lane in Romoland, Riverside County, California, with 1 MW of capacity.
Affordable Internet Services Online (AISO) operates an onsite solar powered commercial colocation and hosting data center at 25655 Louisa Lane in Romoland, Riverside County, California, with 1 MW of capacity.
The Palm Beach County Board of County Commissioners voted 5 to 1 to deny PBA Holdings' Project Tango hyperscale AI data center application on Southern Boulevard in Loxahatchee, Palm Beach County, Florida.
The Palm Beach County Board of County Commissioners voted 5 to 1 to deny PBA Holdings' Project Tango hyperscale AI data center application on Southern Boulevard in Loxahatchee, Palm Beach County, Florida.
Aiken Electric Cooperative / Sage Mill Data Center
The Aiken 5 MW Data Center operates at 1145 Bettis Academy Road and Giant Tire Parkway in the Sage Mill Industrial Park, Aiken County, South Carolina, permitted under EPA FRS ID 110071929476.
The Aiken 5 MW Data Center operates at 1145 Bettis Academy Road and Giant Tire Parkway in the Sage Mill Industrial Park, Aiken County, South Carolina, permitted under EPA FRS ID 110071929476.
AiNET operates its CyberNAP MD790R Tier 4 colocation data center at 7900 Ritchie Highway in Glen Burnie, Anne Arundel County, Maryland, providing 12 MW of critical power capacity.
AiNET operates its CyberNAP MD790R Tier 4 colocation data center at 7900 Ritchie Highway in Glen Burnie, Anne Arundel County, Maryland, providing 12 MW of critical power capacity.
AiNET operates the WDC11 colocation and fiber interconnection data center at 312 Laurel Avenue in Laurel, Prince George's County, Maryland, with 6 MW of critical IT capacity.
AiNET operates the WDC11 colocation and fiber interconnection data center at 312 Laurel Avenue in Laurel, Prince George's County, Maryland, with 6 MW of critical IT capacity.
AiNET operates a 2 building enterprise and federal colocation data center campus at 11700 Montgomery Road in Beltsville, Prince George's County, Maryland, with 20 MW of power capacity.
AiNET operates a 2 building enterprise and federal colocation data center campus at 11700 Montgomery Road in Beltsville, Prince George's County, Maryland, with 20 MW of power capacity.
Aligned Data Centers operates its IAD04 hyperscale data center campus at 5601 Manor Woods Road in Frederick, Frederick County, Maryland, with 108 MW of planned and operational capacity across 2 buildings.
Aligned Data Centers operates its IAD04 hyperscale data center campus at 5601 Manor Woods Road in Frederick, Frederick County, Maryland, with 108 MW of planned and operational capacity across 2 buildings.
Amazon Web Services withdrew its proposal for a 4 building, 500 MW nuclear colocated data center campus adjacent to the Calvert Cliffs Clean Energy Center in Lusby, Calvert County, Maryland, in August 2026 prior to the Calvert County Board of County Commissioners enacting a 6 month moratorium.
Amazon Web Services withdrew its proposal for a 4 building, 500 MW nuclear colocated data center campus adjacent to the Calvert Cliffs Clean Energy Center in Lusby, Calvert County, Maryland, in August 2026 prior to the Calvert County Board of County Commissioners enacting a 6 month moratorium.
Amazon Data Services holds a California Energy Commission Small Power Plant Exemption (Docket 21 SPPE 02) and City of Gilroy approvals for a 2 building, 98 MW hyperscale data center campus at 8000 Camino Arroyo in Gilroy, Santa Clara County, California.
Amazon Data Services holds a California Energy Commission Small Power Plant Exemption (Docket 21 SPPE 02) and City of Gilroy approvals for a 2 building, 98 MW hyperscale data center campus at 8000 Camino Arroyo in Gilroy, Santa Clara County, California.
Amazon Web Services is constructing a 20 building data center campus at the Energy Way Industrial Park in Hamlet, Richmond County, North Carolina, after receiving North Carolina Department of Environmental Quality air quality permits in September 2026.
Amazon Web Services is constructing a 20 building data center campus at the Energy Way Industrial Park in Hamlet, Richmond County, North Carolina, after receiving North Carolina Department of Environmental Quality air quality permits in September 2026.
Amazon Data Services received Minnesota Public Utilities Commission and MPCA approvals for a hyperscale data center campus near the Sherburne County Generating Station in Becker, Sherburne County, Minnesota.
Amazon Data Services received Minnesota Public Utilities Commission and MPCA approvals for a hyperscale data center campus near the Sherburne County Generating Station in Becker, Sherburne County, Minnesota.
Amazon Web Services operates its SFO11 Northern California cloud region data center at 26415 Corporate Avenue in Hayward, Alameda County, California, with 24 MW of BAAQMD permitted backup generator and critical power capacity.
Amazon Web Services operates its SFO11 Northern California cloud region data center at 26415 Corporate Avenue in Hayward, Alameda County, California, with 24 MW of BAAQMD permitted backup generator and critical power capacity.
Amazon Web Services received municipal approval and committed to funding water and sewer infrastructure for a data center campus in Hobart, Lake County, Indiana.
Amazon Web Services received municipal approval and committed to funding water and sewer infrastructure for a data center campus in Hobart, Lake County, Indiana.
Amazon Web Services filed SEPA environmental review and air quality permit applications for a four building data center campus on Dodd Road at the Port of Walla Walla Wallula Gap Industrial Park in Walla Walla County, Washington.
Amazon Web Services filed SEPA environmental review and air quality permit applications for a four building data center campus on Dodd Road at the Port of Walla Walla Wallula Gap Industrial Park in Walla Walla County, Washington.
Amazon Web Services is constructing Project Rainier, a 1,200 acre, 16 building, 2,200 megawatt AI data center campus along Edison Road near New Carlisle in St.
Amazon Web Services is constructing Project Rainier, a 1,200 acre, 16 building, 2,200 megawatt AI data center campus along Edison Road near New Carlisle in St. Joseph County, Indiana.
The United States Department of Energy selected Amentum and DC Blox to develop a 1,000 megawatt AI data center campus at the federal Savannah River Site in Aiken County, South Carolina.
The United States Department of Energy selected Amentum and DC Blox to develop a 1,000 megawatt AI data center campus at the federal Savannah River Site in Aiken County, South Carolina.
National Land Developers filed an application with the Andover Township Land Use Board for a proposed warehouse and data center facility at 248 Stickles Pond Road in Andover, Sussex County, New Jersey.
National Land Developers filed an application with the Andover Township Land Use Board for a proposed warehouse and data center facility at 248 Stickles Pond Road in Andover, Sussex County, New Jersey.
Microsoft operates its three building, 72 MW East Wenatchee data center campus (permitted under project codename APL Data Center, EPA FRS ID 110070228022) at 3555 Grant Road in East Wenatchee, Douglas County, Washington.
Microsoft operates its three building, 72 MW East Wenatchee data center campus (permitted under project codename APL Data Center, EPA FRS ID 110070228022) at 3555 Grant Road in East Wenatchee, Douglas County, Washington.
Apple operates a hyperscale data center campus at 5977 Startown Road in Maiden, Catawba County, North Carolina, disclosed in the Apple Environmental Progress Report 2026.
Apple operates a hyperscale data center campus at 5977 Startown Road in Maiden, Catawba County, North Carolina, disclosed in the Apple Environmental Progress Report 2026.
Atlantech Online operates an enterprise colocation data center at 1201 Seven Locks Road in Rockville, Montgomery County, Maryland, delivering 4 MW of critical power capacity.
Atlantech Online operates an enterprise colocation data center at 1201 Seven Locks Road in Rockville, Montgomery County, Maryland, delivering 4 MW of critical power capacity.
Atlantech Online operates a network colocation facility at 1010 Wayne Avenue in downtown Silver Spring, Montgomery County, Maryland, with 3 MW of power capacity.
Atlantech Online operates a network colocation facility at 1010 Wayne Avenue in downtown Silver Spring, Montgomery County, Maryland, with 3 MW of power capacity.
Atmosphere Data Centers proposed a 3 building, 300 MW hyperscale data center redevelopment at the former Dickerson coal fired generating station at 21200 Martinsburg Road in Dickerson, Montgomery County, Maryland.
Atmosphere Data Centers proposed a 3 building, 300 MW hyperscale data center redevelopment at the former Dickerson coal fired generating station at 21200 Martinsburg Road in Dickerson, Montgomery County, Maryland.
Aunalytics operates the AUSB commercial colocation data center at 1440 Ignition Drive in the Ignition Park technology campus in South Bend, St.
Aunalytics operates the AUSB commercial colocation data center at 1440 Ignition Drive in the Ignition Park technology campus in South Bend, St. Joseph County, Indiana.
Aureon Network Services operates a commercial fiber interconnection and colocation data center at 1661 Westown Parkway in West Des Moines, Polk County, Iowa.
Aureon Network Services operates a commercial fiber interconnection and colocation data center at 1661 Westown Parkway in West Des Moines, Polk County, Iowa.
Avaio Digital Partners received City of Pittsburg entitlements for a 2 building, 96 MW hyperscale data center campus on the former USS Posco steel mill site in Pittsburg, Contra Costa County, California.
Avaio Digital Partners received City of Pittsburg entitlements for a 2 building, 96 MW hyperscale data center campus on the former USS Posco steel mill site in Pittsburg, Contra Costa County, California.
Ayera Technologies operates a commercial colocation and wireless internet backbone data center at 801 Tenth Street in downtown Modesto, Stanislaus County, California, with 2 MW of power capacity.
Ayera Technologies operates a commercial colocation and wireless internet backbone data center at 801 Tenth Street in downtown Modesto, Stanislaus County, California, with 2 MW of power capacity.
Somerset Development filed a proposal for a data center installation within the Bell Works campus at 101 Crawfords Corner Road in Holmdel, Monmouth County, New Jersey, prior to the Township Committee adopting an ordinance restricting new standalone data centers.
Somerset Development filed a proposal for a data center installation within the Bell Works campus at 101 Crawfords Corner Road in Holmdel, Monmouth County, New Jersey, prior to the Township Committee adopting an ordinance restricting new standalone data centers.
Bluebird Network operates the Bluebird Underground commercial colocation data center in a subsurface limestone facility at 1904 North Le Compte Road in Springfield, Greene County, Missouri.
Bluebird Network operates the Bluebird Underground commercial colocation data center in a subsurface limestone facility at 1904 North Le Compte Road in Springfield, Greene County, Missouri.
The Cedar Rapids City Council approved a development agreement with CLOP Cedar Rapids IA LLC and Oppidan for a third data center campus in southwest Cedar Rapids, Linn County, Iowa.
The Cedar Rapids City Council approved a development agreement with CLOP Cedar Rapids IA LLC and Oppidan for a third data center campus in southwest Cedar Rapids, Linn County, Iowa.
Centersquare operates a 2 building Orange County enterprise colocation campus (LAX3 and LAX5) in Irvine, Orange County, California, providing 16 MW of critical IT load.
Centersquare operates a 2 building Orange County enterprise colocation campus (LAX3 and LAX5) in Irvine, Orange County, California, providing 16 MW of critical IT load.
Centersquare operates the EWR5 financial and enterprise colocation data center at 15 Enterprise Avenue North in Secaucus, Hudson County, New Jersey, with 12 MW of critical load.
Centersquare operates the EWR5 financial and enterprise colocation data center at 15 Enterprise Avenue North in Secaucus, Hudson County, New Jersey, with 12 MW of critical load.
Centersquare operates a 2 building Silicon Valley colocation campus (SFO1 on Walsh Avenue and SFO2 on Old Ironsides Drive) in Santa Clara, Santa Clara County, California, with 43 MW of capacity.
Centersquare operates a 2 building Silicon Valley colocation campus (SFO1 on Walsh Avenue and SFO2 on Old Ironsides Drive) in Santa Clara, Santa Clara County, California, with 43 MW of capacity.
Centersquare operates its DEN1 Denver metropolitan colocation data center offering 14 MW of critical power at 9180 Commerce Center Circle in the Denver metropolitan market, Colorado.
Centersquare operates its DEN1 Denver metropolitan colocation data center offering 14 MW of critical power at 9180 Commerce Center Circle in the Denver metropolitan market, Colorado.
Centersquare operates a 2 building Los Angeles metro colocation campus (LAX1 and LAX2) at 205 North Nash Street in El Segundo, Los Angeles County, California, with 18 MW of critical power capacity.
Centersquare operates a 2 building Los Angeles metro colocation campus (LAX1 and LAX2) at 205 North Nash Street in El Segundo, Los Angeles County, California, with 18 MW of critical power capacity.
Centersquare operates an enterprise colocation and interconnection facility inside the 60 Hudson Street carrier hotel in Lower Manhattan, New York County, with 4 MW of critical power capacity.
Centersquare operates an enterprise colocation and interconnection facility inside the 60 Hudson Street carrier hotel in Lower Manhattan, New York County, with 4 MW of critical power capacity.
Centersquare operates its two building Seattle metropolitan colocation campus (SEA1 A and SEA1 B) totaling 8 MW at 12301 Tukwila International Boulevard and 3355 South 120th Place in King County, Washington.
Centersquare operates its two building Seattle metropolitan colocation campus (SEA1 A and SEA1 B) totaling 8 MW at 12301 Tukwila International Boulevard and 3355 South 120th Place in King County, Washington.
Centersquare operates its TPA1 colocation data center offering 6 MW of critical IT capacity at 9310 Florida Palm Drive in Tampa, Hillsborough County, Florida.
Centersquare operates its TPA1 colocation data center offering 6 MW of critical IT capacity at 9310 Florida Palm Drive in Tampa, Hillsborough County, Florida.
Cherokee County Council approved a development and tax incentive agreement for a multi building data center campus along the Interstate 85 corridor near Gaffney, Cherokee County, South Carolina.
Cherokee County Council approved a development and tax incentive agreement for a multi building data center campus along the Interstate 85 corridor near Gaffney, Cherokee County, South Carolina.
CloudHQ is constructing a 3 building, 180 MW hyperscale data center campus in the Southwest Chaska industrial corridor in Chaska, Carver County, Minnesota.
CloudHQ is constructing a 3 building, 180 MW hyperscale data center campus in the Southwest Chaska industrial corridor in Chaska, Carver County, Minnesota.
Cogent Communications operates a regional colocation and IP backbone data center at 6050 Race Road in Elkridge, Howard County, Maryland, with 4 MW of critical power.
Cogent Communications operates a regional colocation and IP backbone data center at 6050 Race Road in Elkridge, Howard County, Maryland, with 4 MW of critical power.
Cologix operates its flagship NNJ3 Northern New Jersey interconnection and enterprise data center at 200 Webro Road in Parsippany, Morris County, New Jersey, with 12 MW of critical power capacity.
Cologix operates its flagship NNJ3 Northern New Jersey interconnection and enterprise data center at 200 Webro Road in Parsippany, Morris County, New Jersey, with 12 MW of critical power capacity.
Cologix operates two network neutral colocation facilities in Jacksonville, JAX1 inside the JaxNAP carrier hotel at 421 West Church Street and JAX2 at 4800 Spring Park Road in Duval County, Florida.
Cologix operates two network neutral colocation facilities in Jacksonville, JAX1 inside the JaxNAP carrier hotel at 421 West Church Street and JAX2 at 4800 Spring Park Road in Duval County, Florida.
Cologix operates the MIN1, MIN2, and MIN3 interconnection and colocation suites inside the 511 Building carrier hotel at 511 11th Avenue South in Minneapolis, Hennepin County, Minnesota.
Cologix operates the MIN1, MIN2, and MIN3 interconnection and colocation suites inside the 511 Building carrier hotel at 511 11th Avenue South in Minneapolis, Hennepin County, Minnesota.
Cologix operates the NNJ1 enterprise colocation data center at 1719 Route 10 East in Parsippany, Morris County, New Jersey, with 4 MW of critical power capacity.
Cologix operates the NNJ1 enterprise colocation data center at 1719 Route 10 East in Parsippany, Morris County, New Jersey, with 4 MW of critical power capacity.
Cologix operates the NNJ2 enterprise colocation data center at 9 Wing Drive in Cedar Knolls, Morris County, New Jersey, delivering 6 MW of critical IT load.
Cologix operates the NNJ2 enterprise colocation data center at 9 Wing Drive in Cedar Knolls, Morris County, New Jersey, delivering 6 MW of critical IT load.
Cologix operates its SV1 Silicon Valley hyperscale edge and interconnection data center at 2050 Martin Avenue in Santa Clara, Santa Clara County, California, with 9 MW of critical power capacity.
Cologix operates its SV1 Silicon Valley hyperscale edge and interconnection data center at 2050 Martin Avenue in Santa Clara, Santa Clara County, California, with 9 MW of critical power capacity.
ColoHouse and 1547 Critical Systems Realty operate a 232,000 square foot enterprise data center at 1 Ramland Road in Orangeburg, Rockland County, New York, with 12 MW of power capacity.
ColoHouse and 1547 Critical Systems Realty operate a 232,000 square foot enterprise data center at 1 Ramland Road in Orangeburg, Rockland County, New York, with 12 MW of power capacity.
CoreSite operates its flagship LA1 Pacific Rim interconnection facility inside the One Wilshire carrier hotel at 624 South Grand Avenue in downtown Los Angeles, Los Angeles County, California, with 18 MW of capacity.
CoreSite operates its flagship LA1 Pacific Rim interconnection facility inside the One Wilshire carrier hotel at 624 South Grand Avenue in downtown Los Angeles, Los Angeles County, California, with 18 MW of capacity.
CoreSite operates its 2 building downtown Los Angeles campus (LA2 at 900 North Alameda Street and LA3 at 200 Bauchet Street) in Los Angeles County, California, delivering 50 MW of combined critical load.
CoreSite operates its 2 building downtown Los Angeles campus (LA2 at 900 North Alameda Street and LA3 at 200 Bauchet Street) in Los Angeles County, California, delivering 50 MW of combined critical load.
CoreSite operates its SV2 Silicon Valley enterprise colocation facility at 1656 McCarthy Boulevard in Milpitas, Santa Clara County, California, providing 12 MW of critical power.
CoreSite operates its SV2 Silicon Valley enterprise colocation facility at 1656 McCarthy Boulevard in Milpitas, Santa Clara County, California, providing 12 MW of critical power.
CoreSite operates its 140,000 square foot, 14 MW OR1 Central Florida colocation data center at 9701 South John Young Parkway in Orlando, Orange County, Florida.
CoreSite operates its 140,000 square foot, 14 MW OR1 Central Florida colocation data center at 9701 South John Young Parkway in Orlando, Orange County, Florida.
CoreSite operates its SV1 downtown San Jose carrier hotel and colocation facility at 55 South Market Street in San Jose, Santa Clara County, California, with 8 MW of power capacity.
CoreSite operates its SV1 downtown San Jose carrier hotel and colocation facility at 55 South Market Street in San Jose, Santa Clara County, California, with 8 MW of power capacity.
CoreSite operates a 5 building colocation and cloud interconnection campus on Stender Way and Coronado Drive in Santa Clara, Santa Clara County, California (SV3, SV4, SV7, SV8, and SV9), totaling 85 MW of capacity.
CoreSite operates a 5 building colocation and cloud interconnection campus on Stender Way and Coronado Drive in Santa Clara, Santa Clara County, California (SV3, SV4, SV7, SV8, and SV9), totaling 85 MW of capacity.
CoreSite operates its 236,000 square foot NY2 Secaucus colocation data center at 2 Emerson Lane in Secaucus, Hudson County, New Jersey, delivering 24 MW of critical power capacity.
CoreSite operates its 236,000 square foot NY2 Secaucus colocation data center at 2 Emerson Lane in Secaucus, Hudson County, New Jersey, delivering 24 MW of critical power capacity.
CoreSite is constructing its 18 MW DE3 purpose built data center at 4900 Race Street on the National Western Center campus in north Denver, Denver County, Colorado.
CoreSite is constructing its 18 MW DE3 purpose built data center at 4900 Race Street on the National Western Center campus in north Denver, Denver County, Colorado.
CoreSite operates its NY1 Manhattan colocation facility inside the 32 Avenue of the Americas carrier hotel in New York County, New York, with 6 MW of critical IT load.
CoreSite operates its NY1 Manhattan colocation facility inside the 32 Avenue of the Americas carrier hotel in New York County, New York, with 6 MW of critical IT load.
CoreWeave and Onyx Equities are constructing a 280,000 square foot, 50 MW AI high performance computing data center inside the Northeast Science and Technology (NEST) campus at 2000 Galloping Hill Road in Kenilworth, Union County, New Jersey.
CoreWeave and Onyx Equities are constructing a 280,000 square foot, 50 MW AI high performance computing data center inside the Northeast Science and Technology (NEST) campus at 2000 Galloping Hill Road in Kenilworth, Union County, New Jersey.
Cube NA Data Center Company operates a commercial colocation data center at 101 Holmes Street in Kansas City, Jackson County, Missouri, permitted under EPA FRS ID 110070914215.
Cube NA Data Center Company operates a commercial colocation data center at 101 Holmes Street in Kansas City, Jackson County, Missouri, permitted under EPA FRS ID 110070914215.
CyrusOne operates its NYM1 enterprise colocation data center at 800 Cottontail Lane in Somerset, Somerset County, New Jersey, delivering 6 MW of critical IT capacity.
CyrusOne operates its NYM1 enterprise colocation data center at 800 Cottontail Lane in Somerset, Somerset County, New Jersey, delivering 6 MW of critical IT capacity.
CyrusOne operates its NYM2 Northern New Jersey financial and enterprise data center at 50 Madison Road in Totowa, Passaic County, New Jersey, with 6 MW of power capacity.
CyrusOne operates its NYM2 Northern New Jersey financial and enterprise data center at 50 Madison Road in Totowa, Passaic County, New Jersey, with 6 MW of power capacity.
CyrusOne operates its NYM7 Hudson Valley enterprise data center at 155 Myers Corners Road in Wappingers Falls, Dutchess County, New York, with 6 MW of critical IT load in 1 building.
CyrusOne operates its NYM7 Hudson Valley enterprise data center at 155 Myers Corners Road in Wappingers Falls, Dutchess County, New York, with 6 MW of critical IT load in 1 building.
Centersquare (formerly Cyxtera) operates its 9 MW DEN2 (DN2) colocation data center at 9110 Commerce Center Circle in Littleton, Douglas County, Colorado (EPA FRS ID 110070208615).
Centersquare (formerly Cyxtera) operates its 9 MW DEN2 (DN2) colocation data center at 9110 Commerce Center Circle in Littleton, Douglas County, Colorado (EPA FRS ID 110070208615).
The Jefferson County Board of Zoning Appeals affirmed industrial zoning for a hyperscale data center campus at the former Jefferson Proving Ground near Madison, Jefferson County, Indiana.
The Jefferson County Board of Zoning Appeals affirmed industrial zoning for a hyperscale data center campus at the former Jefferson Proving Ground near Madison, Jefferson County, Indiana.
The South Brunswick Township Planning Board approved a 2 building commercial redevelopment and data center campus along US Highway 1 in South Brunswick, Middlesex County, New Jersey, which was upheld in Superior Court and appealed by neighboring residents.
The South Brunswick Township Planning Board approved a 2 building commercial redevelopment and data center campus along US Highway 1 in South Brunswick, Middlesex County, New Jersey, which was upheld in Superior Court and appealed by neighboring residents.
DataBank operates its two building, 20 MW Centennial Campus (DEN2 and DEN5) at 6900 South Peoria Street and 6961 South Quentin Street in Centennial, Arapahoe County, Colorado (EPA FRS ID 110015671423).
DataBank operates its two building, 20 MW Centennial Campus (DEN2 and DEN5) at 6900 South Peoria Street and 6961 South Quentin Street in Centennial, Arapahoe County, Colorado (EPA FRS ID 110015671423).
DataBank operates its DEN1 colocation data center offering 9 MW of critical IT load at 393 Inverness Parkway in the Denver metropolitan market, Colorado.
DataBank operates its DEN1 colocation data center offering 9 MW of critical IT load at 393 Inverness Parkway in the Denver metropolitan market, Colorado.
DataBank operates its 2 building Orange County enterprise colocation campus (SNA1 and SNA2) at 17222 and 17400 Von Karman Avenue in Irvine, Orange County, California, delivering 10 MW of critical load.
DataBank operates its 2 building Orange County enterprise colocation campus (SNA1 and SNA2) at 17222 and 17400 Von Karman Avenue in Irvine, Orange County, California, delivering 10 MW of critical load.
DataBank operates its LAX1 downtown Los Angeles colocation and interconnection facility at 600 West 7th Street in Los Angeles County, California, with 8 MW of power capacity.
DataBank operates its LAX1 downtown Los Angeles colocation and interconnection facility at 600 West 7th Street in Los Angeles County, California, with 8 MW of power capacity.
DataBank operates its LGA3 Hudson Valley hyperscale and enterprise colocation data center at 2000 Corporate Drive in Orangeburg, Rockland County, New York, delivering 30 MW of critical IT capacity.
DataBank operates its LGA3 Hudson Valley hyperscale and enterprise colocation data center at 2000 Corporate Drive in Orangeburg, Rockland County, New York, delivering 30 MW of critical IT capacity.
DataBank operates its EWR2 New Jersey enterprise colocation data center at 25 Corporate Place South in Piscataway, Middlesex County, New Jersey, with 10 MW of critical power.
DataBank operates its EWR2 New Jersey enterprise colocation data center at 25 Corporate Place South in Piscataway, Middlesex County, New Jersey, with 10 MW of critical power.
DataBank operates its SAN1 San Diego enterprise colocation and AI liquid cooling testbed facility at 12270 World Trade Drive in Rancho Bernardo, San Diego County, California, with 6 MW of capacity.
DataBank operates its SAN1 San Diego enterprise colocation and AI liquid cooling testbed facility at 12270 World Trade Drive in Rancho Bernardo, San Diego County, California, with 6 MW of capacity.
DataBank operates its SEA1 carrier hotel colocation facility offering 3 MW of critical IT capacity inside the Westin Building Exchange at 2001 Sixth Avenue in Seattle, King County, Washington.
DataBank operates its SEA1 carrier hotel colocation facility offering 3 MW of critical IT capacity inside the Westin Building Exchange at 2001 Sixth Avenue in Seattle, King County, Washington.
Prime Data Centers and DataBank are developing a 3 story, 33 MW data center facility at 3831 South Santa Fe Avenue in Vernon, Los Angeles County, California.
Prime Data Centers and DataBank are developing a 3 story, 33 MW data center facility at 3831 South Santa Fe Avenue in Vernon, Los Angeles County, California.
DataVerge operates a 50,000 square foot carrier neutral colocation and interconnection facility at 882 Third Avenue in Sunset Park, Brooklyn, Kings County, New York, with 6 MW of power capacity.
DataVerge operates a 50,000 square foot carrier neutral colocation and interconnection facility at 882 Third Avenue in Sunset Park, Brooklyn, Kings County, New York, with 6 MW of power capacity.
The Indianapolis Metropolitan Development Commission voted on July 15, 2026 to approve a DC Blox data center campus in eastern Indianapolis, Marion County, Indiana.
The Indianapolis Metropolitan Development Commission voted on July 15, 2026 to approve a DC Blox data center campus in eastern Indianapolis, Marion County, Indiana.
The Metropolitan Council of Nashville and Davidson County enacted an ordinance acquiring DC BLOX's proposed data center parcel adjacent to the Nashville Zoo at Grassmere via eminent domain, ending the data center development in Davidson County, Tennessee.
The Metropolitan Council of Nashville and Davidson County enacted an ordinance acquiring DC BLOX's proposed data center parcel adjacent to the Nashville Zoo at Grassmere via eminent domain, ending the data center development in Davidson County, Tennessee.
DC BLOX operates the MYR1 subsea cable landing station and colocation data center at 1401 Howard Avenue at the former Myrtle Beach Air Force Base in Myrtle Beach, Horry County, South Carolina.
DC BLOX operates the MYR1 subsea cable landing station and colocation data center at 1401 Howard Avenue at the former Myrtle Beach Air Force Base in Myrtle Beach, Horry County, South Carolina.
DCI Technology operates the TriTech Center carrier hotel and colocation facility at 331 2nd Avenue South in downtown Minneapolis, Hennepin County, Minnesota.
DCI Technology operates the TriTech Center carrier hotel and colocation facility at 331 2nd Avenue South in downtown Minneapolis, Hennepin County, Minnesota.
Digi Power X (formerly Digihost) operates a 60 MW digital asset and high performance computing data center campus colocated with the Fortistar combined cycle gas plant at 1070 Erie Avenue in North Tonawanda, Niagara County, New York.
Digi Power X (formerly Digihost) operates a 60 MW digital asset and high performance computing data center campus colocated with the Fortistar combined cycle gas plant at 1070 Erie Avenue in North Tonawanda, Niagara County, New York.
Digital Crossroad operates the DX 1 commercial colocation data center campus at 701 Casino Center Drive on the former State Line Generating Plant site in Hammond, Lake County, Indiana, permitted under EPA FRS ID 110070599714.
Digital Crossroad operates the DX 1 commercial colocation data center campus at 701 Casino Center Drive on the former State Line Generating Plant site in Hammond, Lake County, Indiana, permitted under EPA FRS ID 110070599714.
Digital Fortress operates its PNJ New Jersey colocation data center at 201 Centennial Avenue in Piscataway, Middlesex County, New Jersey, with 6 MW of critical IT load.
Digital Fortress operates its PNJ New Jersey colocation data center at 201 Centennial Avenue in Piscataway, Middlesex County, New Jersey, with 6 MW of critical IT load.
Digital Realty operates a 2 building media and enterprise colocation campus (BUR10 and BUR11) at 437 North Maple Street in Burbank, Los Angeles County, California, with 8 MW of power capacity.
Digital Realty operates a 2 building media and enterprise colocation campus (BUR10 and BUR11) at 437 North Maple Street in Burbank, Los Angeles County, California, with 8 MW of power capacity.
Digital Realty operates two interconnected carrier neutral data centers at 125 and 113 North Myers Street in Charlotte, Mecklenburg County, North Carolina.
Digital Realty operates two interconnected carrier neutral data centers at 125 and 113 North Myers Street in Charlotte, Mecklenburg County, North Carolina.
Digital Realty operates a 2 building colocation and interconnection campus (EWR20 and EWR21) at 2 Peekay Drive and 100 Delawanna Avenue in Clifton, Passaic County, New Jersey, with 24 MW of critical power capacity.
Digital Realty operates a 2 building colocation and interconnection campus (EWR20 and EWR21) at 2 Peekay Drive and 100 Delawanna Avenue in Clifton, Passaic County, New Jersey, with 24 MW of critical power capacity.
Digital Realty operates a 2 building colocation and transpacific subsea cable landing campus (LAX11 and LAX12) at 200 North Nash Street and 2260 East El Segundo Boulevard in El Segundo, Los Angeles County, California, with 32 MW of capacity.
Digital Realty operates a 2 building colocation and transpacific subsea cable landing campus (LAX11 and LAX12) at 200 North Nash Street and 2260 East El Segundo Boulevard in El Segundo, Los Angeles County, California, with 32 MW of capacity.
Digital Realty operates the 500,000 square foot LAX10 carrier hotel at 600 West 7th Street in downtown Los Angeles, Los Angeles County, California, delivering 24 MW of critical interconnection load.
Digital Realty operates the 500,000 square foot LAX10 carrier hotel at 600 West 7th Street in downtown Los Angeles, Los Angeles County, California, delivering 24 MW of critical interconnection load.
Digital Realty owns and operates the MIA10 carrier hotel and international interconnection hub at 36 NE Second Street in downtown Miami, Miami Dade County, Florida.
Digital Realty owns and operates the MIA10 carrier hotel and international interconnection hub at 36 NE Second Street in downtown Miami, Miami Dade County, Florida.
Digital Realty operates 3 carrier hotel colocation and interconnection hubs in Manhattan, New York County (60 Hudson Street JFK10, 111 Eighth Avenue JFK12, and 32 Avenue of the Americas JFK13), providing 32 MW of combined capacity.
Digital Realty operates 3 carrier hotel colocation and interconnection hubs in Manhattan, New York County (60 Hudson Street JFK10, 111 Eighth Avenue JFK12, and 32 Avenue of the Americas JFK13), providing 32 MW of combined capacity.
Digital Realty operates its East Bay OAK10 colocation campus at 720 Second Street in Oakland, Alameda County, California, with 12 MW of power capacity across 2 buildings.
Digital Realty operates its East Bay OAK10 colocation campus at 720 Second Street in Oakland, Alameda County, California, with 12 MW of power capacity across 2 buildings.
Digital Realty operates a 3 building campus (including EWR11 and EWR12) at 365 South Randolphville Road in Piscataway, Middlesex County, New Jersey, providing 36 MW of critical IT capacity.
Digital Realty operates a 3 building campus (including EWR11 and EWR12) at 365 South Randolphville Road in Piscataway, Middlesex County, New Jersey, providing 36 MW of critical IT capacity.
Digital Realty operates 2 primary carrier hotel and colocation hubs in San Francisco, California (365 Main Street SFO10 and 200 Paul Avenue SFO12), providing 42 MW of combined capacity.
Digital Realty operates 2 primary carrier hotel and colocation hubs in San Francisco, California (365 Main Street SFO10 and 200 Paul Avenue SFO12), providing 42 MW of combined capacity.
Digital Realty operates 12 data center buildings across its Santa Clara Silicon Valley portfolio (including SJC10 through SJC37 on Lafayette Street, Alfred Street, Comstock Street, and Space Park Drive) in Santa Clara County, California, totaling 180 MW of Silicon Valley Power served capacity.
Digital Realty operates 12 data center buildings across its Santa Clara Silicon Valley portfolio (including SJC10 through SJC37 on Lafayette Street, Alfred Street, Comstock Street, and Space Park Drive) in Santa Clara County, California, totaling 180 MW of Silicon Valley Power served capacity.
Digital Realty operates the Westin Building Exchange (SEA10), a 34 story, 14 MW Pacific Northwest interconnection hub and carrier hotel at 2001 Sixth Avenue in downtown Seattle, King County, Washington.
Digital Realty operates the Westin Building Exchange (SEA10), a 34 story, 14 MW Pacific Northwest interconnection hub and carrier hotel at 2001 Sixth Avenue in downtown Seattle, King County, Washington.
Digital Realty operates the SJC22 East Bay wholesale data center at 6505 Kaiser Drive in Fremont, Alameda County, California, with 12 MW of critical IT capacity.
Digital Realty operates the SJC22 East Bay wholesale data center at 6505 Kaiser Drive in Fremont, Alameda County, California, with 12 MW of critical IT capacity.
Digital Realty operates a 2 building enterprise data center campus at 255 Madison Road in Totowa, Passaic County, New Jersey, providing 16 MW of critical IT load.
Digital Realty operates a 2 building enterprise data center campus at 255 Madison Road in Totowa, Passaic County, New Jersey, providing 16 MW of critical IT load.
Netrality Data Centers and Digital Realty operate the 210 North Tucker Boulevard carrier hotel and colocation facility in downtown St.
Netrality Data Centers and Digital Realty operate the 210 North Tucker Boulevard carrier hotel and colocation facility in downtown St. Louis, Missouri.
Revitalization Unlimited proposed a downtown data center redevelopment project at West 14th Street and Baltimore Avenue in Kansas City, Jackson County, Missouri.
Revitalization Unlimited proposed a downtown data center redevelopment project at West 14th Street and Baltimore Avenue in Kansas City, Jackson County, Missouri.
Eagle Rock Partners proposed an 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, South Carolina.
Eagle Rock Partners proposed an 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, South Carolina.
EdgeConneX operates its Detroit DET01 commercial colocation data center at 21005 Lahser Road in Southfield, Oakland County, Michigan, registered under EPA FRS ID 110071133008.
EdgeConneX operates its Detroit DET01 commercial colocation data center at 21005 Lahser Road in Southfield, Oakland County, Michigan, registered under EPA FRS ID 110071133008.
EdgeConneX operates its SDG01 San Diego edge colocation and subsea cable interconnection hub at 5761 Copley Drive in San Diego, San Diego County, California, with 8 MW of critical power.
EdgeConneX operates its SDG01 San Diego edge colocation and subsea cable interconnection hub at 5761 Copley Drive in San Diego, San Diego County, California, with 8 MW of critical power.
EdgeConneX operates its SVC01 and SVC02 Silicon Valley colocation facility at 1700 Richard Avenue in Santa Clara, Santa Clara County, California, delivering 12 MW of power capacity.
EdgeConneX operates its SVC01 and SVC02 Silicon Valley colocation facility at 1700 Richard Avenue in Santa Clara, Santa Clara County, California, delivering 12 MW of power capacity.
EdgeConneX operates its SAC01 Sacramento edge colocation data center at 10980 Gold Center Drive in Rancho Cordova, Sacramento County, California, delivering 8 MW of power capacity.
EdgeConneX operates its SAC01 Sacramento edge colocation data center at 10980 Gold Center Drive in Rancho Cordova, Sacramento County, California, delivering 8 MW of power capacity.
EdgeConneX operates its TLH01 edge colocation data center at 1531 Commonwealth Business Drive in Tallahassee, Leon County, Florida (EPA FRS ID 110071062270).
EdgeConneX operates its TLH01 edge colocation data center at 1531 Commonwealth Business Drive in Tallahassee, Leon County, Florida (EPA FRS ID 110071062270).
EdgeCore Digital Infrastructure operates a 2 building, 72 MW hyperscale data center campus at 2201 Laurelwood Road in Santa Clara, Santa Clara County, California, approved under California Energy Commission Docket 19 SPPE 03.
EdgeCore Digital Infrastructure operates a 2 building, 72 MW hyperscale data center campus at 2201 Laurelwood Road in Santa Clara, Santa Clara County, California, approved under California Energy Commission Docket 19 SPPE 03.
Edged Energy is constructing a 3 building, 100 MW waterless cooling data center campus at 3420 North Arlington Avenue in Kansas City, Clay County, Missouri.
Edged Energy is constructing a 3 building, 100 MW waterless cooling data center campus at 3420 North Arlington Avenue in Kansas City, Clay County, Missouri.
Edged Energy received Iowa Economic Development Authority and municipal approvals under Project Lola for a 3 building, 200 MW data center campus in Council Bluffs, Pottawattamie County, Iowa.
Edged Energy received Iowa Economic Development Authority and municipal approvals under Project Lola for a 3 building, 200 MW data center campus in Council Bluffs, Pottawattamie County, Iowa.
Energy Storage Solutions proposed a 900 megawatt AI data center campus on 122 acres of county owned land at the Kingsboro Industrial Park in Edgecombe County, North Carolina.
Energy Storage Solutions proposed a 900 megawatt AI data center campus on 122 acres of county owned land at the Kingsboro Industrial Park in Edgecombe County, North Carolina.
Equinix operates its DE1 International Business Exchange data center at 9706 East Easter Avenue in Centennial, Arapahoe County, Colorado (EPA FRS ID 110064533447).
Equinix operates its DE1 International Business Exchange data center at 9706 East Easter Avenue in Centennial, Arapahoe County, Colorado (EPA FRS ID 110064533447).
Equinix operates its DE2 International Business Exchange data center at 335 Inverness Drive South in Englewood, Arapahoe County, Colorado (EPA FRS ID 110002375689).
Equinix operates its DE2 International Business Exchange data center at 335 Inverness Drive South in Englewood, Arapahoe County, Colorado (EPA FRS ID 110002375689).
Equinix operates its 2 building LA3 and LA4 International Business Exchange campus at 445 North Douglas Street and 1920 East Maple Avenue in El Segundo, Los Angeles County, California, with 28 MW of critical power.
Equinix operates its 2 building LA3 and LA4 International Business Exchange campus at 445 North Douglas Street and 1920 East Maple Avenue in El Segundo, Los Angeles County, California, with 28 MW of critical power.
Equinix operates the LA1 downtown Los Angeles colocation and interconnection hub at 600 West 7th Street in Los Angeles County, California, delivering 18 MW of capacity.
Equinix operates the LA1 downtown Los Angeles colocation and interconnection hub at 600 West 7th Street in Los Angeles County, California, delivering 18 MW of capacity.
Equinix operates the LA7 South Bay colocation data center at 1501 Francisco Street in Torrance, Los Angeles County, California, with 10 MW of critical power capacity.
Equinix operates the LA7 South Bay colocation data center at 1501 Francisco Street in Torrance, Los Angeles County, California, with 10 MW of critical power capacity.
Equinix operates its MI3 Category 5 hurricane rated International Business Exchange and subsea cable landing station at 4680 Conference Way South in Boca Raton, Palm Beach County, Florida.
Equinix operates its MI3 Category 5 hurricane rated International Business Exchange and subsea cable landing station at 4680 Conference Way South in Boca Raton, Palm Beach County, Florida.
Equinix operates the 750,000 square foot NAP of the Americas (MI1) at 50 NE Ninth Street and MI2 at 36 NE Second Street in downtown Miami, Miami Dade County, Florida.
Equinix operates the 750,000 square foot NAP of the Americas (MI1) at 50 NE Ninth Street and MI2 at 36 NE Second Street in downtown Miami, Miami Dade County, Florida.
Equinix operates its NY1 International Business Exchange colocation facility inside the 165 Halsey Street carrier hotel in downtown Newark, Essex County, New Jersey, with 8 MW of power capacity.
Equinix operates its NY1 International Business Exchange colocation facility inside the 165 Halsey Street carrier hotel in downtown Newark, Essex County, New Jersey, with 8 MW of power capacity.
Equinix operates the NY11 financial trading and low latency colocation data center at 1400 Federal Boulevard in Carteret, Middlesex County, New Jersey, with 18 MW of critical load.
Equinix operates the NY11 financial trading and low latency colocation data center at 1400 Federal Boulevard in Carteret, Middlesex County, New Jersey, with 18 MW of critical load.
Equinix operates the NY13 Westchester colocation data center at 401 Fieldcrest Drive in Elmsford, Westchester County, New York, with 10 MW of critical power capacity in 1 building.
Equinix operates the NY13 Westchester colocation data center at 401 Fieldcrest Drive in Elmsford, Westchester County, New York, with 10 MW of critical power capacity in 1 building.
Equinix operates the NY7 enterprise colocation data center at 5851 Westside Avenue in North Bergen, Hudson County, New Jersey, delivering 14 MW of critical power capacity.
Equinix operates the NY7 enterprise colocation data center at 5851 Westside Avenue in North Bergen, Hudson County, New Jersey, delivering 14 MW of critical power capacity.
Equinix operates the NY9 International Business Exchange colocation facility inside 111 Eighth Avenue in Chelsea, Manhattan, New York County, delivering 14 MW of interconnection capacity.
Equinix operates the NY9 International Business Exchange colocation facility inside 111 Eighth Avenue in Chelsea, Manhattan, New York County, delivering 14 MW of interconnection capacity.
Equinix operates 6 colocation and xScale hyperscale data centers in San Jose, Santa Clara County, California (SV1, SV5, SV10, SV11, and SV12x on Great Oaks Boulevard plus SV3 on Lundy Avenue), totaling 96 MW of capacity.
Equinix operates 6 colocation and xScale hyperscale data centers in San Jose, Santa Clara County, California (SV1, SV5, SV10, SV11, and SV12x on Great Oaks Boulevard plus SV3 on Lundy Avenue), totaling 96 MW of capacity.
Equinix operates 5 International Business Exchange data centers in Santa Clara, Santa Clara County, California (SV2, SV14, SV15, SV16, and SV17), providing 52 MW of combined capacity.
Equinix operates 5 International Business Exchange data centers in Santa Clara, Santa Clara County, California (SV2, SV14, SV15, SV16, and SV17), providing 52 MW of combined capacity.
Equinix operates its SE2 and SE3 International Business Exchange carrier hotel colocation facilities at 2001 Sixth Avenue (Westin Building) and 2020 Fifth Avenue in downtown Seattle, King County, Washington.
Equinix operates its SE2 and SE3 International Business Exchange carrier hotel colocation facilities at 2001 Sixth Avenue (Westin Building) and 2020 Fifth Avenue in downtown Seattle, King County, Washington.
Equinix operates a 5 building financial interconnection and colocation campus in Secaucus, Hudson County, New Jersey (NY2, NY4, NY5, NY6, and NY3), delivering 85 MW of combined critical power capacity.
Equinix operates a 5 building financial interconnection and colocation campus in Secaucus, Hudson County, New Jersey (NY2, NY4, NY5, NY6, and NY3), delivering 85 MW of combined critical power capacity.
Equinix operates the SV4 Silicon Valley colocation data center at 255 Caspian Drive in Sunnyvale, Santa Clara County, California, with 10 MW of critical load.
Equinix operates the SV4 Silicon Valley colocation data center at 255 Caspian Drive in Sunnyvale, Santa Clara County, California, with 10 MW of critical load.
Equinix operates the historic SV8 Palo Alto Internet Exchange (PAIX) carrier hotel at 529 Bryant Street in downtown Palo Alto, Santa Clara County, California, with 4 MW of power capacity.
Equinix operates the historic SV8 Palo Alto Internet Exchange (PAIX) carrier hotel at 529 Bryant Street in downtown Palo Alto, Santa Clara County, California, with 4 MW of power capacity.
Centersquare (formerly Evoque Data Center Solutions) operates the PNJ1 colocation data center at 3 Corporate Place in Piscataway, Middlesex County, New Jersey, with 10 MW of permitted emergency generator and critical power capacity.
Centersquare (formerly Evoque Data Center Solutions) operates the PNJ1 colocation data center at 3 Corporate Place in Piscataway, Middlesex County, New Jersey, with 10 MW of permitted emergency generator and critical power capacity.
Expedient operates its Baltimore metro enterprise cloud and colocation data center at 11155 Red Run Boulevard in Owings Mills, Baltimore County, Maryland, with 6 MW of critical IT load.
Expedient operates its Baltimore metro enterprise cloud and colocation data center at 11155 Red Run Boulevard in Owings Mills, Baltimore County, Maryland, with 6 MW of critical IT load.
EZ Network Systems operates a regional colocation and cloud hosting data center at 4203 Coronado Avenue in Stockton, San Joaquin County, California, with 2 MW of power capacity.
EZ Network Systems operates a regional colocation and cloud hosting data center at 4203 Coronado Avenue in Stockton, San Joaquin County, California, with 2 MW of power capacity.
Flexential operates the Charlotte South CLT1, CLT2, and CLT3 colocation campus at 8910 Lenox Pointe Drive in Charlotte, Mecklenburg County, North Carolina.
Flexential operates the Charlotte South CLT1, CLT2, and CLT3 colocation campus at 8910 Lenox Pointe Drive in Charlotte, Mecklenburg County, North Carolina.
Flexential operates its Category 5 hurricane rated Fort Lauderdale data center campus (FLL01 and FLL02) with subsea cable connectivity at 5301 NW 33rd Avenue in Fort Lauderdale, Broward County, Florida.
Flexential operates its Category 5 hurricane rated Fort Lauderdale data center campus (FLL01 and FLL02) with subsea cable connectivity at 5301 NW 33rd Avenue in Fort Lauderdale, Broward County, Florida.
Flexential operates its two building, 14 MW Franklin Carothers colocation campus (NAS05 and NAS06) at 4600 Carothers Parkway in Franklin, Williamson County, Tennessee.
Flexential operates its two building, 14 MW Franklin Carothers colocation campus (NAS05 and NAS06) at 4600 Carothers Parkway in Franklin, Williamson County, Tennessee.
Plans to convert the former Star Tribune Heritage Landing printing plant at 800 North 1st Street in Minneapolis, Hennepin County, Minnesota, into a data center were cancelled.
Plans to convert the former Star Tribune Heritage Landing printing plant at 800 North 1st Street in Minneapolis, Hennepin County, Minnesota, into a data center were cancelled.
Catellus Development and Quantum Loophole hold master campus approvals and a 110 million dollar Community Benefits Agreement with Frederick County for the 2,100 acre former Eastalco aluminum plant site at 5601 Manor Woods Road in Frederick County, Maryland.
Catellus Development and Quantum Loophole hold master campus approvals and a 110 million dollar Community Benefits Agreement with Frederick County for the 2,100 acre former Eastalco aluminum plant site at 5601 Manor Woods Road in Frederick County, Maryland.
GI Partners owns and operates the two building KOMO Plaza (formerly Fisher Plaza) carrier hotel and interconnection hub at 140 Fourth Avenue North in Seattle, King County, Washington.
GI Partners owns and operates the two building KOMO Plaza (formerly Fisher Plaza) carrier hotel and interconnection hub at 140 Fourth Avenue North in Seattle, King County, Washington.
Global Access Point operates a carrier hotel and colocation data center campus at Union Station, 506 West South Street, in South Bend, St.
Global Access Point operates a carrier hotel and colocation data center campus at Union Station, 506 West South Street, in South Bend, St. Joseph County, Indiana.
The Weld County Board of County Commissioners approved a special use permit for Global AI to operate a modular AI data center facility in unincorporated Weld County, Colorado.
The Weld County Board of County Commissioners approved a special use permit for Global AI to operate a modular AI data center facility in unincorporated Weld County, Colorado.
Global Net (GNM) and carrier hotel operators run high density optical and IP exchange infrastructure inside 32 Avenue of the Americas in Tribeca, Manhattan, New York County.
Global Net (GNM) and carrier hotel operators run high density optical and IP exchange infrastructure inside 32 Avenue of the Americas in Tribeca, Manhattan, New York County.
Goodman Group is constructing its 32 MW LAX01 hyperscale data center at 2727 East Vernon Avenue in Vernon, Los Angeles County, California, served by Vernon Public Utilities.
Goodman Group is constructing its 32 MW LAX01 hyperscale data center at 2727 East Vernon Avenue in Vernon, Los Angeles County, California, served by Vernon Public Utilities.
Google operates its Council Bluffs hyperscale data center campus across two sites on Bunge Avenue and Veterans Memorial Highway in Council Bluffs, Pottawattamie County, Iowa.
Google operates its Council Bluffs hyperscale data center campus across two sites on Bunge Avenue and Veterans Memorial Highway in Council Bluffs, Pottawattamie County, Iowa.
Google is constructing a second Lowcountry hyperscale data center campus at the Pine Hill Business Campus in Ridgeville, Dorchester County, South Carolina.
Google is constructing a second Lowcountry hyperscale data center campus at the Pine Hill Business Campus in Ridgeville, Dorchester County, South Carolina.
Google operates its three building, 150 MW hyperscale data center campus on the former Hemlock Semiconductor industrial site at 1950 Dunlop Lane in Clarksville, Montgomery County, Tennessee.
Google operates its three building, 150 MW hyperscale data center campus on the former Hemlock Semiconductor industrial site at 1950 Dunlop Lane in Clarksville, Montgomery County, Tennessee.
Google is developing a hyperscale data center campus near Monrovia in Morgan County, Indiana, for which the Indiana Utility Regulatory Commission approved an AES Indiana electric service agreement.
Google is developing a hyperscale data center campus near Monrovia in Morgan County, Indiana, for which the Indiana Utility Regulatory Commission approved an AES Indiana electric service agreement.
Google holds California Energy Commission Small Power Plant Exemption (Docket 19 SPPE 04) and City of San Jose approvals for its 4 building, 200 MW North San Jose data center and research campus in Santa Clara County, California.
Google holds California Energy Commission Small Power Plant Exemption (Docket 19 SPPE 04) and City of San Jose approvals for its 4 building, 200 MW North San Jose data center and research campus in Santa Clara County, California.
Google received municipal and environmental approvals for a 482 acre, 4 building hyperscale data center campus in Pine Island, Goodhue County, Minnesota.
Google received municipal and environmental approvals for a 482 acre, 4 building hyperscale data center campus in Pine Island, Goodhue County, Minnesota.
Google and MidAmerican Energy filed county development proposals for a data center campus near the Port Neal industrial area in Salix, Woodbury County, Iowa.
Google and MidAmerican Energy filed county development proposals for a data center campus near the Port Neal industrial area in Salix, Woodbury County, Iowa.
Google withdrew its rezoning proposal in September 2025 for a 467 acre data center campus at Post Road and East Thompson Road in Franklin Township, Indianapolis, Marion County, Indiana, ahead of a final City County Council vote.
Google withdrew its rezoning proposal in September 2025 for a 467 acre data center campus at Post Road and East Thompson Road in Franklin Township, Indianapolis, Marion County, Indiana, ahead of a final City County Council vote.
Google is developing a 1,000 megawatt hyperscale data center campus in Van Buren Township, Wayne County, Michigan, after Wayne County Commissioners approved project tax incentives in 2026.
Google is developing a 1,000 megawatt hyperscale data center campus in Van Buren Township, Wayne County, Michigan, after Wayne County Commissioners approved project tax incentives in 2026.
H5 Data Centers operates a commercial colocation data center at 10015 Claude Freeman Drive in Charlotte University Research Park, Mecklenburg County, North Carolina.
H5 Data Centers operates a commercial colocation data center at 10015 Claude Freeman Drive in Charlotte University Research Park, Mecklenburg County, North Carolina.
H5 Data Centers operates colocation and interconnection suites at 350 Main Street in downtown Buffalo, Erie County, New York, providing 8 MW of carrier neutral capacity.
H5 Data Centers operates colocation and interconnection suites at 350 Main Street in downtown Buffalo, Erie County, New York, providing 8 MW of carrier neutral capacity.
H5 Data Centers operates a 2 building enterprise colocation campus at 5319 Enterprise Drive and 5369 Crown Drive in Lockport, Niagara County, New York, with 12 MW of hydropower backed capacity.
H5 Data Centers operates a 2 building enterprise colocation campus at 5319 Enterprise Drive and 5369 Crown Drive in Lockport, Niagara County, New York, with 12 MW of hydropower backed capacity.
H5 Data Centers operates its downtown Nashville carrier hotel and interconnection facility at 147 Fourth Avenue North in Nashville, Davidson County, Tennessee.
H5 Data Centers operates its downtown Nashville carrier hotel and interconnection facility at 147 Fourth Avenue North in Nashville, Davidson County, Tennessee.
H5 Data Centers operates the NJ01 Secaucus colocation facility at 200B Meadowlands Parkway in Secaucus, Hudson County, New Jersey, with 6 MW of critical IT capacity.
H5 Data Centers operates the NJ01 Secaucus colocation facility at 200B Meadowlands Parkway in Secaucus, Hudson County, New Jersey, with 6 MW of critical IT capacity.
H5 Data Centers operates a three building, 40 MW wholesale colocation campus at 1711 M Street NE and 1500 M Street NE in Quincy, Grant County, Washington (EPA FRS ID 110037332687).
H5 Data Centers operates a three building, 40 MW wholesale colocation campus at 1711 M Street NE and 1500 M Street NE in Quincy, Grant County, Washington (EPA FRS ID 110037332687).
H5 Data Centers operates its 300,000 square foot, two building, 20 MW Denver Tech Center colocation campus at 5350 South Valentia Way in Greenwood Village, Colorado (EPA FRS ID 110070515674).
H5 Data Centers operates its 300,000 square foot, two building, 20 MW Denver Tech Center colocation campus at 5350 South Valentia Way in Greenwood Village, Colorado (EPA FRS ID 110070515674).
H5 Data Centers operates the 325 Hudson Street carrier hotel and subsea cable interconnection hub in Hudson Square, Manhattan, New York County, with 6 MW of critical IT load.
H5 Data Centers operates the 325 Hudson Street carrier hotel and subsea cable interconnection hub in Hudson Square, Manhattan, New York County, with 6 MW of critical IT load.
H5 Data Centers operates a transpacific subsea cable interconnection and colocation hub at 3610 Sacramento Drive in San Luis Obispo, San Luis Obispo County, California, with 6 MW of critical power.
H5 Data Centers operates a transpacific subsea cable interconnection and colocation hub at 3610 Sacramento Drive in San Luis Obispo, San Luis Obispo County, California, with 6 MW of critical power.
H5 Data Centers operates its 293,000 square foot, 12 MW downtown Seattle carrier hotel and interconnection facility at 1000 Denny Way in Seattle, King County, Washington.
H5 Data Centers operates its 293,000 square foot, 12 MW downtown Seattle carrier hotel and interconnection facility at 1000 Denny Way in Seattle, King County, Washington.
H5 Data Centers operates its downtown Tampa carrier hotel and colocation facility inside the Franklin Exchange Building at 655 North Franklin Street in Tampa, Hillsborough County, Florida.
H5 Data Centers operates its downtown Tampa carrier hotel and colocation facility inside the Franklin Exchange Building at 655 North Franklin Street in Tampa, Hillsborough County, Florida.
Two data center facilities are proposed along the Bluffton and Hilton Head corridor in Beaufort County, South Carolina, prompting county zoning review.
Two data center facilities are proposed along the Bluffton and Hilton Head corridor in Beaufort County, South Carolina, prompting county zoning review.
A historic building in downtown Charlotte, Mecklenburg County, North Carolina was demolished under a city permit in September 2026 to clear the site for a proposed data center development.
A historic building in downtown Charlotte, Mecklenburg County, North Carolina was demolished under a city permit in September 2026 to clear the site for a proposed data center development.
HostDime operates its seven story, 95,000 square foot, 10 MW Tier IV flagship data center and corporate headquarters at 1 Innovative Place along Interstate 4 in the Orlando metropolitan area, Orange County, Florida.
HostDime operates its seven story, 95,000 square foot, 10 MW Tier IV flagship data center and corporate headquarters at 1 Innovative Place along Interstate 4 in the Orlando metropolitan area, Orange County, Florida.
Hostirian and multiple colocation providers operate data center facilities inside the historic Globe Building carrier hotel at 710 North Tucker Boulevard in downtown St.
Hostirian and multiple colocation providers operate data center facilities inside the historic Globe Building carrier hotel at 710 North Tucker Boulevard in downtown St. Louis, Missouri.
Hurricane Electric operates its 2 building global IP backbone and colocation campus (FMT1 and FMT2) at 760 Mission Court and 48233 Warm Springs Boulevard in Fremont, Alameda County, California, with 24 MW of capacity.
Hurricane Electric operates its 2 building global IP backbone and colocation campus (FMT1 and FMT2) at 760 Mission Court and 48233 Warm Springs Boulevard in Fremont, Alameda County, California, with 24 MW of capacity.
Hyperscale Data ceased cryptocurrency mining at its 617,000 square foot facility in Dowagiac, Cass County, Michigan in September 2026 and is converting the campus into a 52 megawatt AI data center.
Hyperscale Data ceased cryptocurrency mining at its 617,000 square foot facility in Dowagiac, Cass County, Michigan in September 2026 and is converting the campus into a 52 megawatt AI data center.
Imperial Valley Computer Manufacturing LLC proposed a 2 building, 330 MW AI data center campus on 74 acres in Imperial, Imperial County, California, where a California Superior Court ordered a full Environmental Impact Report under CEQA in September 2026.
Imperial Valley Computer Manufacturing LLC proposed a 2 building, 330 MW AI data center campus on 74 acres in Imperial, Imperial County, California, where a California Superior Court ordered a full Environmental Impact Report under CEQA in September 2026.
The Village of Indiantown Council reviewed a proposed data center campus along SW Warfield Boulevard and convened special moratorium proceedings in Indiantown, Martin County, Florida.
The Village of Indiantown Council reviewed a proposed data center campus along SW Warfield Boulevard and convened special moratorium proceedings in Indiantown, Martin County, Florida.
11:11 Systems (formerly Inflow and Sungard Availability Services) operates a commercial colocation data center at 4518 S.
11:11 Systems (formerly Inflow and Sungard Availability Services) operates a commercial colocation data center at 4518 S. Miami Boulevard in Durham, Durham County, North Carolina, permitted under EPA FRS ID 110012146169.
Q'Levr filed environmental review plans for a 4 building data center campus along Rich Valley Boulevard in Inver Grove Heights, Dakota County, Minnesota.
Q'Levr filed environmental review plans for a 4 building data center campus along Rich Valley Boulevard in Inver Grove Heights, Dakota County, Minnesota.
Iron Gate Data Centers operates a commercial colocation facility at 3199 Pilot Knob Road in Eagan, Dakota County, Minnesota, permitted under EPA FRS ID 110070918452.
Iron Gate Data Centers operates a commercial colocation facility at 3199 Pilot Knob Road in Eagan, Dakota County, Minnesota, permitted under EPA FRS ID 110070918452.
Iron Mountain Data Centers operates its 15 MW DEN 1 (formerly FORTRUST) colocation facility at 4300 Brighton Boulevard in Denver, Denver County, Colorado (EPA FRS ID 110070874207).
Iron Mountain Data Centers operates its 15 MW DEN 1 (formerly FORTRUST) colocation facility at 4300 Brighton Boulevard in Denver, Denver County, Colorado (EPA FRS ID 110070874207).
Iron Mountain Data Centers operates its 2 building NJE1 data center campus at 3003 Woodbridge Avenue in Edison, Middlesex County, New Jersey, delivering 28 MW of critical power capacity.
Iron Mountain Data Centers operates its 2 building NJE1 data center campus at 3003 Woodbridge Avenue in Edison, Middlesex County, New Jersey, delivering 28 MW of critical power capacity.
Colocation Northwest and ScaleMatrix operate the 9 MW South Hill (US West 02) high density colocation data center at 1023 39th Avenue SE in Puyallup, Pierce County, Washington.
Colocation Northwest and ScaleMatrix operate the 9 MW South Hill (US West 02) high density colocation data center at 1023 39th Avenue SE in Puyallup, Pierce County, Washington.
Industrial Web Services (IWS) operates a commercial data center facility at 1649 Pearman Dairy Road in Anderson, Anderson County, South Carolina, permitted under EPA FRS ID 110071932123.
Industrial Web Services (IWS) operates a commercial data center facility at 1649 Pearman Dairy Road in Anderson, Anderson County, South Carolina, permitted under EPA FRS ID 110071932123.
The City of Janesville Common Council reviewed redevelopment proposals for an AI data center campus at the former General Motors assembly site on Industrial Avenue in Janesville, Rock County, Wisconsin.
The City of Janesville Common Council reviewed redevelopment proposals for an AI data center campus at the former General Motors assembly site on Industrial Avenue in Janesville, Rock County, Wisconsin.
A proposed data center at 90 Jersey Avenue in New Brunswick, Middlesex County, New Jersey, was cancelled in February 2026 when the New Brunswick City Council amended the Jersey Avenue Redevelopment Plan to remove data centers as a permitted use.
A proposed data center at 90 Jersey Avenue in New Brunswick, Middlesex County, New Jersey, was cancelled in February 2026 when the New Brunswick City Council amended the Jersey Avenue Redevelopment Plan to remove data centers as a permitted use.
CyrusOne is developing a data center campus near Sanford in Lee County, North Carolina, where county commissioners rejected attempts to pause the approved project in August 2026.
CyrusOne is developing a data center campus near Sanford in Lee County, North Carolina, where county commissioners rejected attempts to pause the approved project in August 2026.
Newport Financial Center at 111 Pavonia Avenue in Jersey City, Hudson County, New Jersey, operates as a Hudson River waterfront carrier hotel housing Cologix JCY1 and financial colocation suites with 16 MW of capacity.
Newport Financial Center at 111 Pavonia Avenue in Jersey City, Hudson County, New Jersey, operates as a Hudson River waterfront carrier hotel housing Cologix JCY1 and financial colocation suites with 16 MW of capacity.
Lenoir City Utilities Board operates its municipal utility colocation and fiber operations data center at 7698 Creekwood Park Boulevard in Lenoir City, Loudon County, Tennessee.
Lenoir City Utilities Board operates its municipal utility colocation and fiber operations data center at 7698 Creekwood Park Boulevard in Lenoir City, Loudon County, Tennessee.
A proposed data center along the Interstate 94 industrial corridor in Lenox Township, Macomb County, Michigan prompted township board review in July 2026.
A proposed data center along the Interstate 94 industrial corridor in Lenox Township, Macomb County, Michigan prompted township board review in July 2026.
Lerner Enterprises proposed a 4 building, 200 MW hyperscale data center redevelopment at the 88 acre former Landover Mall site at 2101 Brightseat Road in Landover, Prince George's County, Maryland.
Lerner Enterprises proposed a 4 building, 200 MW hyperscale data center redevelopment at the 88 acre former Landover Mall site at 2101 Brightseat Road in Landover, Prince George's County, Maryland.
LightEdge (formerly NFINIT) operates a 2 building San Diego colocation campus (SAN1 on Lightwave Avenue and SAN2 on Scranton Road) in San Diego County, California, with 10 MW of critical load.
LightEdge (formerly NFINIT) operates a 2 building San Diego colocation campus (SAN1 on Lightwave Avenue and SAN2 on Scranton Road) in San Diego County, California, with 10 MW of critical load.
LightEdge Solutions operates the KCI1 underground colocation data center inside Hunt Midwest SubTropolis at 9050 NE Underground Drive in Kansas City, Clay County, Missouri.
LightEdge Solutions operates the KCI1 underground colocation data center inside Hunt Midwest SubTropolis at 9050 NE Underground Drive in Kansas City, Clay County, Missouri.
Lincoln Rackhouse operates an enterprise colocation data center at 11155 NW Airworld Drive near Kansas City International Airport in Platte County, Missouri.
Lincoln Rackhouse operates an enterprise colocation data center at 11155 NW Airworld Drive near Kansas City International Airport in Platte County, Missouri.
CoreSite (DE2) and Lumen Technologies operate a carrier neutral colocation and network interconnection facility at 1850 Pearl Street in Denver, Denver County, Colorado.
CoreSite (DE2) and Lumen Technologies operate a carrier neutral colocation and network interconnection facility at 1850 Pearl Street in Denver, Denver County, Colorado.
Digital Realty, Centersquare, and Lumen operate financial colocation and low latency interconnection suites at 300 JFK Boulevard East in Weehawken, Hudson County, New Jersey, with 18 MW of power capacity.
Digital Realty, Centersquare, and Lumen operate financial colocation and low latency interconnection suites at 300 JFK Boulevard East in Weehawken, Hudson County, New Jersey, with 18 MW of power capacity.
Lumen Technologies operates a downtown Baltimore colocation and network interconnection hub at 300 West Lexington Street in Baltimore, Maryland, with 6 MW of capacity.
Lumen Technologies operates a downtown Baltimore colocation and network interconnection hub at 300 West Lexington Street in Baltimore, Maryland, with 6 MW of capacity.
ManagedWay and 123NET operate the SFJ2, DC2, and DC3 commercial colocation campus at 24275 and 24245 Northwestern Highway in Southfield, Oakland County, Michigan.
ManagedWay and 123NET operate the SFJ2, DC2, and DC3 commercial colocation campus at 24275 and 24245 Northwestern Highway in Southfield, Oakland County, Michigan.
A proposed data center campus on farmland adjacent to Mason in Ingham County, Michigan prompted an annexation petition and municipal town hall in August 2026.
A proposed data center campus on farmland adjacent to Mason in Ingham County, Michigan prompted an annexation petition and municipal town hall in August 2026.
The City of Menomonie Common Council approved tax incremental district and land purchase agreements for a proposed 320 acre, 4 building data center campus in Menomonie, Dunn County, Wisconsin.
The City of Menomonie Common Council approved tax incremental district and land purchase agreements for a proposed 320 acre, 4 building data center campus in Menomonie, Dunn County, Wisconsin.
Meta is constructing an $800 million, 3 building hyperscale data center campus on a 328 acre site at the Eastern Iowa Industrial Center in Davenport, Scott County, Iowa.
Meta is constructing an $800 million, 3 building hyperscale data center campus on a 328 acre site at the Eastern Iowa Industrial Center in Davenport, Scott County, Iowa.
Metrobloks received municipal rezoning approval in May 2026 for an urban AI data center at 2505 North Sherman Drive in Indianapolis, Marion County, Indiana.
Metrobloks received municipal rezoning approval in May 2026 for an urban AI data center at 2505 North Sherman Drive in Indianapolis, Marion County, Indiana.
Microsoft withdrew its rezoning application for a proposed 244 acre data center campus along County Line Road in the Village of Caledonia, Racine County, Wisconsin, following municipal opposition.
Microsoft withdrew its rezoning application for a proposed 244 acre data center campus along County Line Road in the Village of Caledonia, Racine County, Wisconsin, following municipal opposition.
Microsoft acquired 316 acres in Gaines Township, Kent County, Michigan for a proposed data center campus and requested a deferral of its township planning review in February 2026.
Microsoft acquired 316 acres in Gaines Township, Kent County, Michigan for a proposed data center campus and requested a deferral of its township planning review in February 2026.
Microsoft acquired a 1,385 acre site in Woodsdale Township, Person County, North Carolina for a planned hyperscale data center campus known as Microsoft Mega Park and held a community meeting on June 30, 2026.
Microsoft acquired a 1,385 acre site in Woodsdale Township, Person County, North Carolina for a planned hyperscale data center campus known as Microsoft Mega Park and held a community meeting on June 30, 2026.
Microsoft operates and is expanding its hyperscale AI data center campus at 4800 90th Street in the Electronics and Information Technology Manufacturing Zone in Mount Pleasant, Racine County, Wisconsin.
Microsoft operates and is expanding its hyperscale AI data center campus at 4800 90th Street in the Electronics and Information Technology Manufacturing Zone in Mount Pleasant, Racine County, Wisconsin.
Microsoft operates its flagship Columbia Data Center Campus (MWH01) across six facility phases totaling 240 MW at 15555 NW B Street in Quincy, Grant County, Washington.
Microsoft operates its flagship Columbia Data Center Campus (MWH01) across six facility phases totaling 240 MW at 15555 NW B Street in Quincy, Grant County, Washington.
Microsoft received municipal development approval for a data center campus along County Highway H and Braun Road in Sturtevant, Racine County, Wisconsin.
Microsoft received municipal development approval for a data center campus along County Highway H and Braun Road in Sturtevant, Racine County, Wisconsin.
Microsoft is constructing a 4 building hyperscale data center campus in Van Meter, Dallas County, Iowa, approved by the Iowa Economic Development Authority.
Microsoft is constructing a 4 building hyperscale data center campus in Van Meter, Dallas County, Iowa, approved by the Iowa Economic Development Authority.
Microsoft operates and is expanding five hyperscale data center campuses (Project Alluvion, Project Osmium, Project Ginger, Project Ruthenium, and Project Maple) across 16 buildings in West Des Moines, Polk and Dallas Counties, Iowa.
Microsoft operates and is expanding five hyperscale data center campuses (Project Alluvion, Project Osmium, Project Ginger, Project Ruthenium, and Project Maple) across 16 buildings in West Des Moines, Polk and Dallas Counties, Iowa.
A commercial data center project proposed in East Modesto, Stanislaus County, California, underwent initial review by the City of Modesto and Modesto Irrigation District amid public hearings on water and power allocation.
A commercial data center project proposed in East Modesto, Stanislaus County, California, underwent initial review by the City of Modesto and Modesto Irrigation District amid public hearings on water and power allocation.
A developer proposed a data center campus on the 150 acre former Lansing Country Club site in Munster, Lake County, Indiana, prompting review before the Munster Plan Commission.
A developer proposed a data center campus on the 150 acre former Lansing Country Club site in Munster, Lake County, Indiana, prompting review before the Munster Plan Commission.
Nebius Group received City of Independence Chapter 100 industrial development bond and municipal power approvals for a 300 MW AI data center campus in Independence, Jackson County, Missouri.
Nebius Group received City of Independence Chapter 100 industrial development bond and municipal power approvals for a 300 MW AI data center campus in Independence, Jackson County, Missouri.
Netrality Data Centers operates the Indy Telcom Center carrier hotel campus at 701 and 733 West Henry Street in downtown Indianapolis, Marion County, Indiana.
Netrality Data Centers operates the Indy Telcom Center carrier hotel campus at 701 and 733 West Henry Street in downtown Indianapolis, Marion County, Indiana.
Netrality Data Centers owns and operates the 1102 Grand Boulevard carrier hotel and meet me room campus in downtown Kansas City, Jackson County, Missouri.
Netrality Data Centers owns and operates the 1102 Grand Boulevard carrier hotel and meet me room campus in downtown Kansas City, Jackson County, Missouri.
New York GreenCloud proposed a biomass powered commercial data center facility in Ione, Amador County, California, submitted for municipal review by the City of Ione.
New York GreenCloud proposed a biomass powered commercial data center facility in Ione, Amador County, California, submitted for municipal review by the City of Ione.
New York Internet (NYI) operates its flagship Lower Manhattan enterprise colocation facility at 100 William Street in the Financial District, New York County, with 4 MW of power capacity.
New York Internet (NYI) operates its flagship Lower Manhattan enterprise colocation facility at 100 William Street in the Financial District, New York County, with 4 MW of power capacity.
NJFX operates a Tier 3 carrier neutral colocation campus colocated with the transatlantic and South American subsea cable landing station at 1410 Wall Church Road in Wall Township, Monmouth County, New Jersey, with 10 MW of capacity.
NJFX operates a Tier 3 carrier neutral colocation campus colocated with the transatlantic and South American subsea cable landing station at 1410 Wall Church Road in Wall Township, Monmouth County, New Jersey, with 10 MW of capacity.
North Country Colocation Services proposed a 20 MW, 2 building colocation data center on State Highway 37C in the Town of Massena, St.
North Country Colocation Services proposed a 20 MW, 2 building colocation data center on State Highway 37C in the Town of Massena, St. Lawrence County, New York, undergoing municipal Planning Board environmental review.
NorthMark Strategies and Valara Holdings are constructing a 457 megawatt data center campus at the former Kohler industrial site in Spartanburg County, South Carolina, after the South Carolina Public Service Commission dismissed regulatory challenges in August 2026.
NorthMark Strategies and Valara Holdings are constructing a 457 megawatt data center campus at the former Kohler industrial site in Spartanburg County, South Carolina, after the South Carolina Public Service Commission dismissed regulatory challenges in August 2026.
NorthPoint Development and Canon Partners proposed a 3 building, 150 MW industrial and data center campus in Fairfield, Solano County, California, submitted for review to the City of Fairfield.
NorthPoint Development and Canon Partners proposed a 3 building, 150 MW industrial and data center campus in Fairfield, Solano County, California, submitted for review to the City of Fairfield.
Novva Data Centers operates its two building, 36 MW Colorado Springs campus at 650 Sybilla Lane in Colorado Springs, El Paso County, Colorado (EPA FRS ID 110072219777).
Novva Data Centers operates its two building, 36 MW Colorado Springs campus at 650 Sybilla Lane in Colorado Springs, El Paso County, Colorado (EPA FRS ID 110072219777).
Novva Data Centers operates a high density enterprise colocation data center at 400 Paul Avenue in San Francisco, California, delivering 12 MW of critical IT load.
Novva Data Centers operates a high density enterprise colocation data center at 400 Paul Avenue in San Francisco, California, delivering 12 MW of critical IT load.
OneNeck IT Solutions (US Signal) operates its 6 MW Tier III commercial colocation data center at 8675 Concord Center Drive in unincorporated Douglas County (Englewood), Colorado (EPA FRS ID 110064747751).
OneNeck IT Solutions (US Signal) operates its 6 MW Tier III commercial colocation data center at 8675 Concord Center Drive in unincorporated Douglas County (Englewood), Colorado (EPA FRS ID 110064747751).
Oppidan Investment Company filed environmental review documents for a 3 building data center campus at the former gravel quarry site in Apple Valley, Dakota County, Minnesota.
Oppidan Investment Company filed environmental review documents for a 3 building data center campus at the former gravel quarry site in Apple Valley, Dakota County, Minnesota.
Oppidan Investment Company received permits for a 2 building commercial data center campus at 5341 North Hanley Road in Berkeley, St.
Oppidan Investment Company received permits for a 2 building commercial data center campus at 5341 North Hanley Road in Berkeley, St. Louis County, Missouri.
Optic Fusion operates its downtown Tacoma carrier hotel and colocation facility inside the Perkins Building at 1101 A Street in Tacoma, Pierce County, Washington.
Optic Fusion operates its downtown Tacoma carrier hotel and colocation facility inside the Perkins Building at 1101 A Street in Tacoma, Pierce County, Washington.
Related Digital, Oracle, and OpenAI are constructing a 1,400 megawatt hyperscale AI data center campus on 250 acres in Saline Township, Washtenaw County, Michigan.
Related Digital, Oracle, and OpenAI are constructing a 1,400 megawatt hyperscale AI data center campus on 250 acres in Saline Township, Washtenaw County, Michigan.
Oracle operates its US West (San Jose) Oracle Cloud Infrastructure public cloud region in San Jose, Santa Clara County, California, with 16 MW of critical capacity.
Oracle operates its US West (San Jose) Oracle Cloud Infrastructure public cloud region in San Jose, Santa Clara County, California, with 16 MW of critical capacity.
Panattoni Development Company proposed the West Roseville Innovation Center, a 2 building, 100 MW data center and industrial campus on Phillip Road in Roseville, Placer County, California.
Panattoni Development Company proposed the West Roseville Innovation Center, a 2 building, 100 MW data center and industrial campus on Phillip Road in Roseville, Placer County, California.
The Douglas County Board of County Commissioners approved a 19 million dollar personal property tax incentive and site plan for a two building data center campus along Highfield Parkway in Parker, Douglas County, Colorado.
The Douglas County Board of County Commissioners approved a 19 million dollar personal property tax incentive and site plan for a two building data center campus along Highfield Parkway in Parker, Douglas County, Colorado.
Posey County commissioners and the Posey County Area Plan Commission held public sessions in 2026 regarding a proposed data center project in Posey County, Indiana.
Posey County commissioners and the Posey County Area Plan Commission held public sessions in 2026 regarding a proposed data center project in Posey County, Indiana.
Marion County Council approved an inducement and fee in lieu of tax agreement on January 22, 2026 for Project Liberty, a planned data center campus in Marion County, South Carolina.
Marion County Council approved an inducement and fee in lieu of tax agreement on January 22, 2026 for Project Liberty, a planned data center campus in Marion County, South Carolina.
The City of Cleveland and Bradley County docketed a 400 acre annexation request and zoning specifications for Project River, a proposed four building data center campus along Dalton Pike SE in Bradley County, Tennessee.
The City of Cleveland and Bradley County docketed a 400 acre annexation request and zoning specifications for Project River, a proposed four building data center campus along Dalton Pike SE in Bradley County, Tennessee.
The Colorado Springs Planning Commission and City Council approved development plans for Raeden's two building Project Taurus data center campus at Peak Innovation Park near the Colorado Springs Airport in El Paso County, Colorado.
The Colorado Springs Planning Commission and City Council approved development plans for Raeden's two building Project Taurus data center campus at Peak Innovation Park near the Colorado Springs Airport in El Paso County, Colorado.
Centersquare operates a 214,000 square foot enterprise colocation data center at 12401 Prosperity Drive in Silver Spring, Montgomery County, Maryland, with 16 MW of critical power capacity.
Centersquare operates a 214,000 square foot enterprise colocation data center at 12401 Prosperity Drive in Silver Spring, Montgomery County, Maryland, with 16 MW of critical power capacity.
PureColo operates its ROC01 enterprise colocation data center at 1100 Pittsford Victor Road in Pittsford, Monroe County, New York, providing 4 MW of critical IT capacity.
PureColo operates its ROC01 enterprise colocation data center at 1100 Pittsford Victor Road in Pittsford, Monroe County, New York, providing 4 MW of critical IT capacity.
QTS Data Centers is constructing a $750 million, 6 building hyperscale data center campus at the Big Cedar Industrial Center in Cedar Rapids, Linn County, Iowa.
QTS Data Centers is constructing a $750 million, 6 building hyperscale data center campus at the Big Cedar Industrial Center in Cedar Rapids, Linn County, Iowa.
QTS Data Centers proposed a 12 building, 800 MW hyperscale data center campus at County Highway I and Interstate 39 in DeForest and Vienna, Dane County, Wisconsin.
QTS Data Centers proposed a 12 building, 800 MW hyperscale data center campus at County Highway I and Interstate 39 in DeForest and Vienna, Dane County, Wisconsin.
QTS Data Centers operates its 170 MW, three building Denver Aurora hyperscale data center campus at 23855 East E 470 in Aurora, Arapahoe County, Colorado.
QTS Data Centers operates its 170 MW, three building Denver Aurora hyperscale data center campus at 23855 East E 470 in Aurora, Arapahoe County, Colorado.
QTS Data Centers operates a 2 building, 32 MW hyperscale and enterprise data center campus at 50 Millstone Road in East Windsor, Mercer County, New Jersey, with an additional campus expansion under review by the East Windsor Planning Board.
QTS Data Centers operates a 2 building, 32 MW hyperscale and enterprise data center campus at 50 Millstone Road in East Windsor, Mercer County, New Jersey, with an additional campus expansion under review by the East Windsor Planning Board.
QTS Data Centers operates its Category 5 hurricane rated 10 MW Miami data center at 11234 NW 20th Street in Miami Dade County, Florida (EPA FRS ID 110040483660).
QTS Data Centers operates its Category 5 hurricane rated 10 MW Miami data center at 11234 NW 20th Street in Miami Dade County, Florida (EPA FRS ID 110040483660).
QTS Data Centers operates its 36 MW, 360,000 square foot Piscataway data center at 101 Possumtown Road in Piscataway, Middlesex County, New Jersey (originally developed as DuPont Fabros Technology NJ1 under EPA FRS ID 110032878973 and 110000322160).
QTS Data Centers operates its 36 MW, 360,000 square foot Piscataway data center at 101 Possumtown Road in Piscataway, Middlesex County, New Jersey (originally developed as DuPont Fabros Technology NJ1 under EPA FRS ID 110032878973 and 110000322160).
QTS Data Centers operates its JCY1 financial colocation facility at 95 Christopher Columbus Drive in Jersey City, Hudson County, New Jersey, providing 14 MW of power capacity.
QTS Data Centers operates its JCY1 financial colocation facility at 95 Christopher Columbus Drive in Jersey City, Hudson County, New Jersey, providing 14 MW of power capacity.
QTS Data Centers operates a 92,000 square foot enterprise and government colocation data center at 1100 North Market Boulevard in North Natomas, Sacramento County, California, with 18 MW of SMUD utility power.
QTS Data Centers operates a 92,000 square foot enterprise and government colocation data center at 1100 North Market Boulevard in North Natomas, Sacramento County, California, with 18 MW of SMUD utility power.
QTS Data Centers operates a 2 building colocation campus at 2805 and 2807 Mission College Boulevard in Santa Clara, Santa Clara County, California, delivering 25 MW of critical power capacity.
QTS Data Centers operates a 2 building colocation campus at 2805 and 2807 Mission College Boulevard in Santa Clara, Santa Clara County, California, delivering 25 MW of critical power capacity.
QTS Data Centers is constructing a multi building hyperscale data center campus along Hands Mill Highway near Rock Hill in York County, South Carolina.
QTS Data Centers is constructing a multi building hyperscale data center campus along Hands Mill Highway near Rock Hill in York County, South Carolina.
RadiusDC is constructing Nashville I, a 102,500 square foot, 12 MW interconnection and colocation data center at 2902 and 2906 Brick Church Pike in Nashville, Davidson County, Tennessee.
RadiusDC is constructing Nashville I, a 102,500 square foot, 12 MW interconnection and colocation data center at 2902 and 2906 Brick Church Pike in Nashville, Davidson County, Tennessee.
Raeden proposed a 100 megawatt data center development in Gibraltar, Wayne County, Michigan, which was paused by a municipal moratorium and became the subject of litigation in August 2026.
Raeden proposed a 100 megawatt data center development in Gibraltar, Wayne County, Michigan, which was paused by a municipal moratorium and became the subject of litigation in August 2026.
NTT Global Data Centers (formerly RagingWire) operates a 3 building, 58 MW enterprise and hyperscale data center campus (CA1, CA2, and CA3) in North Natomas, Sacramento County, California.
NTT Global Data Centers (formerly RagingWire) operates a 3 building, 58 MW enterprise and hyperscale data center campus (CA1, CA2, and CA3) in North Natomas, Sacramento County, California.
Rowan Digital Infrastructure received Frederick County Planning Commission site plan approval for a 4 building, 300 MW hyperscale data center campus on the former Eastalco industrial property in Frederick County, Maryland.
Rowan Digital Infrastructure received Frederick County Planning Commission site plan approval for a 4 building, 300 MW hyperscale data center campus on the former Eastalco industrial property in Frederick County, Maryland.
A rural property near Ionia in Ionia County, Michigan sought municipal annexation for data center development, prompting public planning sessions in 2026.
A rural property near Ionia in Ionia County, Michigan sought municipal annexation for data center development, prompting public planning sessions in 2026.
Sabey Data Centers received municipal approval in March 2026 for a six building data center campus at Kentucky Avenue and Camby Road in Decatur Township, Indianapolis, Marion County, Indiana.
Sabey Data Centers received municipal approval in March 2026 for a six building data center campus at Kentucky Avenue and Camby Road in Decatur Township, Indianapolis, Marion County, Indiana.
Sabey Data Centers operates Intergate Manhattan at 375 Pearl Street in Lower Manhattan, New York County, a 1 million square foot, 32 story vertical data center tower with 40 MW of utility capacity.
Sabey Data Centers operates Intergate Manhattan at 375 Pearl Street in Lower Manhattan, New York County, a 1 million square foot, 32 story vertical data center tower with 40 MW of utility capacity.
Sabey Data Centers operates its three building, 24 MW Intergate Seattle West colocation campus (including Digital Fortress TUK) at 12101 Tukwila International Boulevard in Tukwila, King County, Washington.
Sabey Data Centers operates its three building, 24 MW Intergate Seattle West colocation campus (including Digital Fortress TUK) at 12101 Tukwila International Boulevard in Tukwila, King County, Washington.
Sabey Data Centers operates its 520,000 square foot, five building, 65 MW Intergate Quincy hydro powered data center campus at 2200 M Street NE in Quincy, Grant County, Washington.
Sabey Data Centers operates its 520,000 square foot, five building, 65 MW Intergate Quincy hydro powered data center campus at 2200 M Street NE in Quincy, Grant County, Washington.
Sabey Data Centers operates its five building, 50 MW Intergate Seattle East colocation campus at 3355 and 3433 South 120th Place in Tukwila, King County, Washington.
Sabey Data Centers operates its five building, 50 MW Intergate Seattle East colocation campus at 3355 and 3433 South 120th Place in Tukwila, King County, Washington.
SBA Edge owns and operates the 280,000 square foot, 14 MW JaxNAP carrier hotel and subsea cable interconnection gateway at 421 West Church Street in downtown Jacksonville, Duval County, Florida.
SBA Edge owns and operates the 280,000 square foot, 14 MW JaxNAP carrier hotel and subsea cable interconnection gateway at 421 West Church Street in downtown Jacksonville, Duval County, Florida.
ScaleMatrix operates its US West 01 high density cabinet colocation and AI cloud data center at 5775 Kearny Villa Road in San Diego, San Diego County, California, with 8 MW of power capacity.
ScaleMatrix operates its US West 01 high density cabinet colocation and AI cloud data center at 5775 Kearny Villa Road in San Diego, San Diego County, California, with 8 MW of power capacity.
Segra operates a commercial colocation data center at 465 Charles Babbage Lane on the North Carolina Research Campus in Kannapolis, Cabarrus County, North Carolina.
Segra operates a commercial colocation data center at 465 Charles Babbage Lane on the North Carolina Research Campus in Kannapolis, Cabarrus County, North Carolina.
Serverfarm operates its LAX1 Los Angeles enterprise colocation data center at 444 North Nash Street in El Segundo, Los Angeles County, California, delivering 18 MW of critical load.
Serverfarm operates its LAX1 Los Angeles enterprise colocation data center at 444 North Nash Street in El Segundo, Los Angeles County, California, delivering 18 MW of critical load.
Serverfarm operates its SV1 Silicon Valley enterprise colocation data center at 5101 Lafayette Street in Santa Clara, Santa Clara County, California, with 14 MW of power capacity.
Serverfarm operates its SV1 Silicon Valley enterprise colocation data center at 5101 Lafayette Street in Santa Clara, Santa Clara County, California, with 14 MW of power capacity.
Beacon Partners withdrew its rezoning proposal for a data center at Jones Sausage Road and Rock Quarry Road in southeast Raleigh, Wake County, North Carolina in August 2026 following community opposition.
Beacon Partners withdrew its rezoning proposal for a data center at Jones Sausage Road and Rock Quarry Road in southeast Raleigh, Wake County, North Carolina in August 2026 following community opposition.
xAI operates its 500 MW Colossus AI supercomputer data center campus at 3231 Paul R.
xAI operates its 500 MW Colossus AI supercomputer data center campus at 3231 Paul R. Lowry Road and 5420 Tulane Road in Memphis, Shelby County, Tennessee.
STACK Infrastructure operates its 2 building SVY01 hyperscale data center campus at 2001 Fortune Drive in North San Jose, Santa Clara County, California, with 32 MW of critical capacity.
STACK Infrastructure operates its 2 building SVY01 hyperscale data center campus at 2001 Fortune Drive in North San Jose, Santa Clara County, California, with 32 MW of critical capacity.
STACK Infrastructure operates its 2 building SVY02 data center campus at 2400 Condensa Street in Santa Clara, Santa Clara County, California, with 48 MW of critical load.
STACK Infrastructure operates its 2 building SVY02 data center campus at 2400 Condensa Street in Santa Clara, Santa Clara County, California, with 48 MW of critical load.
Data Holdings and Stack41 operate a Tier III commercial colocation data center at 3135 West Highland Boulevard in Milwaukee, Milwaukee County, Wisconsin.
Data Holdings and Stack41 operate a Tier III commercial colocation data center at 3135 West Highland Boulevard in Milwaukee, Milwaukee County, Wisconsin.
Stream Data Centers received Genesee County Economic Development Center incentive and site approval for a 3 building, 250 MW hyperscale data center campus at the Science and Technology Advanced Manufacturing Park (STAMP) in the Town of Alabama, Genesee County, New York.
Stream Data Centers received Genesee County Economic Development Center incentive and site approval for a 3 building, 250 MW hyperscale data center campus at the Science and Technology Advanced Manufacturing Park (STAMP) in the Town of Alabama, Genesee County, New York.
Henry County Commissioners voted in January 2026 to approve a data center campus proposed by Surge Development LLC on more than 500 acres near Knightstown, Henry County, Indiana.
Henry County Commissioners voted in January 2026 to approve a data center campus proposed by Surge Development LLC on more than 500 acres near Knightstown, Henry County, Indiana.
T5 Data Centers operates its 160,000 square foot T5 Silicon Valley wholesale data center at 39800 Eureka Drive in Newark, Alameda County, California, with 14 MW of power capacity.
T5 Data Centers operates its 160,000 square foot T5 Silicon Valley wholesale data center at 39800 Eureka Drive in Newark, Alameda County, California, with 14 MW of power capacity.
Nabiax and Telefonica operate the Tier III Unitersity KeyCenter international colocation data center at 11300 NW 25th Street in Miami Dade County, Florida.
Nabiax and Telefonica operate the Tier III Unitersity KeyCenter international colocation data center at 11300 NW 25th Street in Miami Dade County, Florida.
Telehouse operates a 162,000 square foot colocation data center and New York International Internet Exchange (NYIIX) hub at 7 Teleport Drive on Staten Island, Richmond County, New York, with 10 MW of capacity.
Telehouse operates a 162,000 square foot colocation data center and New York International Internet Exchange (NYIIX) hub at 7 Teleport Drive on Staten Island, Richmond County, New York, with 10 MW of capacity.
TeraWulf is constructing a 300 MW, 3 building high performance computing and AI data center campus at the former Cayuga Generating Station site on Cayuga Lake in Lansing, Tompkins County, New York.
TeraWulf is constructing a 300 MW, 3 building high performance computing and AI data center campus at the former Cayuga Generating Station site on Cayuga Lake in Lansing, Tompkins County, New York.
Tier.Net Technologies operates a dedicated server and colocation data center at 70 Henry Street in downtown Binghamton, Broome County, New York, with 3 MW of power capacity.
Tier.Net Technologies operates a dedicated server and colocation data center at 70 Henry Street in downtown Binghamton, Broome County, New York, with 3 MW of power capacity.
TierPoint operates its Spokane Liberty Lake colocation data center at 23017 and 23403 East Mission Avenue in Liberty Lake, Spokane County, Washington (EPA FRS ID 110045959566).
TierPoint operates its Spokane Liberty Lake colocation data center at 23017 and 23403 East Mission Avenue in Liberty Lake, Spokane County, Washington (EPA FRS ID 110045959566).
TierPoint operates its BWI Airport enterprise colocation data center at 813 Pinnacle Drive in Linthicum Heights, Anne Arundel County, Maryland, providing 6 MW of critical power.
TierPoint operates its BWI Airport enterprise colocation data center at 813 Pinnacle Drive in Linthicum Heights, Anne Arundel County, Maryland, providing 6 MW of critical power.
TierPoint operates its downtown Nashville carrier hotel colocation facility inside the Cummins Station building at 209 Tenth Avenue South in Nashville, Davidson County, Tennessee.
TierPoint operates its downtown Nashville carrier hotel colocation facility inside the Cummins Station building at 209 Tenth Avenue South in Nashville, Davidson County, Tennessee.
TierPoint operates a 2 building enterprise colocation data center campus at 11 and 17 Skyline Drive in Hawthorne, Westchester County, New York, with 10 MW of critical power capacity.
TierPoint operates a 2 building enterprise colocation data center campus at 11 and 17 Skyline Drive in Hawthorne, Westchester County, New York, with 10 MW of critical power capacity.
Tract filed an Alternative Urban Areawide Review and master plan for a 670 acre, 8 building hyperscale data center park in Farmington, Dakota County, Minnesota.
Tract filed an Alternative Urban Areawide Review and master plan for a 670 acre, 8 building hyperscale data center park in Farmington, Dakota County, Minnesota.
Willow Lakes LLC submitted a 203 acre rezoning proposal to the City of Fort Pierce and St.
Willow Lakes LLC submitted a 203 acre rezoning proposal to the City of Fort Pierce and St. Lucie County to replace the former Koa Bay surf park plan at 9000 West Midway Road near Interstate 95 with a four building data center campus in Fort Pierce, St. Lucie County, Florida.
Turin Management LLC proposed redeveloping the former Remington Arms industrial complex at 14 Hoefler Avenue in Ilion, Herkimer County, New York, to include a commercial data center facility reviewed by the Village of Ilion Planning Board.
Turin Management LLC proposed redeveloping the former Remington Arms industrial complex at 14 Hoefler Avenue in Ilion, Herkimer County, New York, to include a commercial data center facility reviewed by the Village of Ilion Planning Board.
TurnKey Internet (a ColoHouse company) operates a green enterprise colocation data center at 175 Old Loudon Road in Latham, Albany County, New York, with 4 MW of critical power capacity.
TurnKey Internet (a ColoHouse company) operates a green enterprise colocation data center at 175 Old Loudon Road in Latham, Albany County, New York, with 4 MW of critical power capacity.
University of Michigan / Los Alamos National Laboratory
The University of Michigan and Los Alamos National Laboratory proposed a 220,000 square foot computing and data center facility along Textile Road in Ypsilanti Township, Washtenaw County, Michigan.
The University of Michigan and Los Alamos National Laboratory proposed a 220,000 square foot computing and data center facility along Textile Road in Ypsilanti Township, Washtenaw County, Michigan.
Unwired Broadband operates its FAT1 Central Valley colocation data center at 414 West Bedford Avenue in Fresno, Fresno County, California, with 2 MW of critical power capacity.
Unwired Broadband operates its FAT1 Central Valley colocation data center at 414 West Bedford Avenue in Fresno, Fresno County, California, with 2 MW of critical power capacity.
Vantage Data Centers operates 9 data center buildings across its Santa Clara I (Northwestern Parkway, 6 buildings, 77 MW) and Santa Clara II (Walsh Avenue, 3 buildings, 75 MW) campuses in Santa Clara County, California, totaling 152 MW.
Vantage Data Centers operates 9 data center buildings across its Santa Clara I (Northwestern Parkway, 6 buildings, 77 MW) and Santa Clara II (Walsh Avenue, 3 buildings, 75 MW) campuses in Santa Clara County, California, totaling 152 MW.
Vantage Data Centers is constructing a 4 building, 902 MW hyperscale data center campus on a 672 acre site in Port Washington, Ozaukee County, Wisconsin.
Vantage Data Centers is constructing a 4 building, 902 MW hyperscale data center campus on a 672 acre site in Port Washington, Ozaukee County, Wisconsin.
Vantage Data Centers operates its 83 MW, three building WA1 hyperscale data center campus at 2101 Road M NE in Quincy, Grant County, Washington (EPA FRS ID 110067218987).
Vantage Data Centers operates its 83 MW, three building WA1 hyperscale data center campus at 2101 Road M NE in Quincy, Grant County, Washington (EPA FRS ID 110067218987).
Global Stack submitted an unsolicited redevelopment proposal to the 31st District Agricultural Association Board of Directors for a mixed use parking and data center facility at the Ventura County Fairgrounds in Ventura, Ventura County, California.
Global Stack submitted an unsolicited redevelopment proposal to the 31st District Agricultural Association Board of Directors for a mixed use parking and data center facility at the Ventura County Fairgrounds in Ventura, Ventura County, California.
Flexential (formerly ViaWest) operates its 14 MW DEN02 Compark colocation data center at 8636 South Peoria Street in Douglas County, Colorado (EPA FRS ID 110069566945 and Compark construction stormwater permit FRS ID 110064764731).
Flexential (formerly ViaWest) operates its 14 MW DEN02 Compark colocation data center at 8636 South Peoria Street in Douglas County, Colorado (EPA FRS ID 110069566945 and Compark construction stormwater permit FRS ID 110064764731).
OneNeck IT Solutions and US Signal operate a commercial colocation data center at 10290 West 70th Street in Eden Prairie, Hennepin County, Minnesota, permitted under EPA FRS ID 110070152844.
OneNeck IT Solutions and US Signal operate a commercial colocation data center at 10290 West 70th Street in Eden Prairie, Hennepin County, Minnesota, permitted under EPA FRS ID 110070152844.
Evocative operates its EWR1 Secaucus enterprise colocation data center at 1 Enterprise Avenue North in Secaucus, Hudson County, New Jersey, providing 8 MW of power capacity.
Evocative operates its EWR1 Secaucus enterprise colocation data center at 1 Enterprise Avenue North in Secaucus, Hudson County, New Jersey, providing 8 MW of power capacity.
LightEdge (formerly Webair) operates the NY1 Long Island enterprise cloud and colocation data center at 501 Franklin Avenue in Garden City, Nassau County, New York, with 6 MW of critical load.
LightEdge (formerly Webair) operates the NY1 Long Island enterprise cloud and colocation data center at 501 Franklin Avenue in Garden City, Nassau County, New York, with 6 MW of critical load.
Wells Interconnection operates the primary Milwaukee carrier hotel and meet me room facility at 324 East Wisconsin Avenue in Milwaukee, Milwaukee County, Wisconsin.
Wells Interconnection operates the primary Milwaukee carrier hotel and meet me room facility at 324 East Wisconsin Avenue in Milwaukee, Milwaukee County, Wisconsin.
Westelcom Networks operates a regional colocation and fiber interconnection data center at 109 South Warren Street in downtown Syracuse, Onondaga County, New York, with 3 MW of capacity.
Westelcom Networks operates a regional colocation and fiber interconnection data center at 109 South Warren Street in downtown Syracuse, Onondaga County, New York, with 3 MW of capacity.
X2nSat operates a satellite gateway earth station and enterprise colocation data center at 1310 Redwood Way in Petaluma, Sonoma County, California, with 2 MW of capacity.
X2nSat operates a satellite gateway earth station and enterprise colocation data center at 1310 Redwood Way in Petaluma, Sonoma County, California, with 2 MW of capacity.
Yahoo operates a 4 building, 70 MW hyperscale data center campus at 5285 Enterprise Drive in the Town of Lockport, Niagara County, New York, powered by New York Power Authority Niagara hydroelectric allocations.
Yahoo operates a 4 building, 70 MW hyperscale data center campus at 5285 Enterprise Drive in the Town of Lockport, Niagara County, New York, powered by New York Power Authority Niagara hydroelectric allocations.
Zayo Group operates colocation and meet me room interconnection suites inside the Candler Building carrier hotel at 111 Market Place in downtown Baltimore, Maryland, with 6 MW of capacity.
Zayo Group operates colocation and meet me room interconnection suites inside the Candler Building carrier hotel at 111 Market Place in downtown Baltimore, Maryland, with 6 MW of capacity.
1547 Critical Systems Realty lists PTOR1 at 921 SW Washington St, Portland, OR on its interconnection and facility directory.
1547 Critical Systems Realty lists PTOR1 at 921 SW Washington St, Portland, OR on its interconnection and facility directory. Co located facilities include: 1547 Critical Systems Realty (PTOR1), Digital Fortress (Digital Fortress (PTL)).
Amazon operates 14 hyperscale data centers within a 30 mile stretch along the Columbia River in the Lower Umatilla Basin, raising air quality concerns over backup diesel generator emissions.
Amazon operates 14 hyperscale data centers within a 30 mile stretch along the Columbia River in the Lower Umatilla Basin, raising air quality concerns over backup diesel generator emissions.
Amazon operates data centers in Morrow County, Oregon that went online beginning in 2011 and have been linked to nitrate groundwater contamination and a cluster of rare health conditions in the surrounding community.
Amazon operates data centers in Morrow County, Oregon that went online beginning in 2011 and have been linked to nitrate groundwater contamination and a cluster of rare health conditions in the surrounding community.
Apple operates a large data center campus in Prineville, Oregon, benefiting from Long Term Rural Enterprise Zone tax exemptions that are nearing expiration.
Apple operates a large data center campus in Prineville, Oregon, benefiting from Long Term Rural Enterprise Zone tax exemptions that are nearing expiration.
Apple planned a 137 acre, 18,20 MW solar array adjacent to its Reno data center in partnership with NV Energy, expected to generate approximately 43.5 million kilowatt hours of clean energy per year.
Apple planned a 137 acre, 18,20 MW solar array adjacent to its Reno data center in partnership with NV Energy, expected to generate approximately 43.5 million kilowatt hours of clean energy per year.
Boxminer.io proposed a 20 megawatt data center on approximately 19.5 to 20 acres at the La Pine Industrial Park on Reed Road, which La Pine City Council unanimously voted to reject on May 27, 2026 after strong public opposition.
Boxminer.io proposed a 20 megawatt data center on approximately 19.5 to 20 acres at the La Pine Industrial Park on Reed Road, which La Pine City Council unanimously voted to reject on May 27, 2026 after strong public opposition.
Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.
Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.
Vultr launched an AMD GPU supercomputer cluster at Centersquare's Lisle, Illinois data center, which offers 15 MW of utility power across 194,057 square feet.
Vultr launched an AMD GPU supercomputer cluster at Centersquare's Lisle, Illinois data center, which offers 15 MW of utility power across 194,057 square feet.
DataBank filed a Development of Regional Impact application for Project Indo in Cartersville, Georgia, a 200 MW campus across 69 acres totaling 1.1 million sq ft valued at approximately $2.4 billion, with first phase targeted for 2032.
DataBank filed a Development of Regional Impact application for Project Indo in Cartersville, Georgia, a 200 MW campus across 69 acres totaling 1.1 million sq ft valued at approximately $2.4 billion, with first phase targeted for 2032.
The EPA's facility registry lists Digital Data Center at 188 Internationale BLVD, Glendale Heights, IL 60139 in Glendale Heights, Illinois, with a hazardous waste record.
The EPA's facility registry lists Digital Data Center at 188 Internationale BLVD, Glendale Heights, IL 60139 in Glendale Heights, Illinois, with a hazardous waste record.
Digital Fortress lists Digital Fortress (PTL2) at 9705 SW Sunshine Court, Beaverton, OR on its interconnection and facility directory.
Digital Fortress lists Digital Fortress (PTL2) at 9705 SW Sunshine Court, Beaverton, OR on its interconnection and facility directory. Co located facilities include: Digital Fortress (Digital Fortress (PTL2)), Digital Fortress (Digital Fortress (PTL3)).
The EPA's facility registry lists Dipper Ventures LLC CH3 Data Center at 1400 Devon Ave, Elk Grove Village, IL 60007 in Elk Grove Village, Illinois, with an air permit.
The EPA's facility registry lists Dipper Ventures LLC CH3 Data Center at 1400 Devon Ave, Elk Grove Village, IL 60007 in Elk Grove Village, Illinois, with an air permit.
EdgeConneX Inc. lists EdgeConneX Portland (EDCPOR01) at 6327 NE Evergreen Parkway, Hillsboro, OR on its interconnection and facility directory. Co located facilities include: EdgeConneX Inc. (EdgeConneX Portland (EDCPOR01)), EdgeConneX Inc. (EdgeConneX Hillsboro (EDCPOR02)).
Edged operates a 3 building, 180 megawatt hyperscale data center campus at 1800 Thomas Street NW on the former Tilford Yard site in Atlanta, Fulton County, Georgia.
Edged operates a 3 building, 180 megawatt hyperscale data center campus at 1800 Thomas Street NW on the former Tilford Yard site in Atlanta, Fulton County, Georgia.
Edged operates its 36 MW Edged Phoenix (PHX01) data center at 8927 E Ray Rd in Mesa, Maricopa County, Arizona, using a waterless closed loop cooling system.
Edged operates its 36 MW Edged Phoenix (PHX01) data center at 8927 E Ray Rd in Mesa, Maricopa County, Arizona, using a waterless closed loop cooling system.
The EPA's facility registry lists Flexential Atl 4 Data Center at 12655 Edison Drive, Alpharetta, GA 30022 in Alpharetta, Georgia, with a water permit.
The EPA's facility registry lists Flexential Atl 4 Data Center at 12655 Edison Drive, Alpharetta, GA 30022 in Alpharetta, Georgia, with a water permit.
Flexential Corp. lists Flexential - Atlanta/Norcross (ATL1/2) at 2775 Northwoods Parkway NW, Norcross, GA on its interconnection and facility directory.
Flexential Corp. lists Flexential - Las Vegas/Downtown (LAS03) at 302 E Carson Ave Ste 100, Las Vegas, NV on its interconnection and facility directory. Co located facilities include: Flexential Corp. (Flexential - Las Vegas/Downtown (LAS03)), Flexential Corp. (Flexential - Las Vegas/Downtown (LAS05)).
Flexential Corp. lists Flexential - Las Vegas/North (LAS04) at 3330 E Lone Mountain Rd, North Las Vegas, NV on its interconnection and facility directory.
The EPA's facility registry lists Franklin Park (CHI22) Data Center at 9401 W Grand Ave, Franklin Park, IL 60131 in Franklin Park, Illinois, with an air permit.
The EPA's facility registry lists Franklin Park (CHI22) Data Center at 9401 W Grand Ave, Franklin Park, IL 60131 in Franklin Park, Illinois, with an air permit.
The EPA's facility registry lists HSBC Vernon Hills Data Center at 475 Corporate Woods Parkway, Vernon Hills, IL 60061 in Vernon Hills, Illinois, with a water permit.
The EPA's facility registry lists HSBC Vernon Hills Data Center at 475 Corporate Woods Parkway, Vernon Hills, IL 60061 in Vernon Hills, Illinois, with a water permit.
The EPA's facility registry lists Infomart Data Center, Cascadia 02 at 21515 NW Evergren Parkway, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.
The EPA's facility registry lists Infomart Data Center, Cascadia 02 at 21515 NW Evergren Parkway, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.
PowerHouse Data Centers developed a 795 acre, 1.8 GW capacity data center campus in Joliet with 24 buildings expected to generate 310 million dollars in property taxes over 30 years.
PowerHouse Data Centers developed a 795 acre, 1.8 GW capacity data center campus in Joliet with 24 buildings expected to generate 310 million dollars in property taxes over 30 years.
The EPA's facility registry lists Meridian Parkway Data Center Owner LLC at 4267 Meridian Pkwy, Aurora, IL 60504 in Aurora, Illinois, with an air permit.
The EPA's facility registry lists Meridian Parkway Data Center Owner LLC at 4267 Meridian Pkwy, Aurora, IL 60504 in Aurora, Illinois, with an air permit.
Meta operates and expands a 5 building, 2.4 million square foot hyperscale data center campus through subsidiary Stadler Pahvant LLC at 2000 N.
Meta operates and expands a 5 building, 2.4 million square foot hyperscale data center campus through subsidiary Stadler Pahvant LLC at 2000 N. Pony Express Parkway in Eagle Mountain, Utah County, Utah.
Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration.
Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration.
The EPA's facility registry lists Microsoft Corp chicago Data Center at 601 Northwest Avenue, Northlake, IL 60164 in Northlake, Illinois, with air and water permits and a hazardous waste record.
The EPA's facility registry lists Microsoft Corp chicago Data Center at 601 Northwest Avenue, Northlake, IL 60164 in Northlake, Illinois, with air and water permits and a hazardous waste record.
Microsoft acquired nearly 21 acres adjacent to its existing Palmetto data center campus in south Fulton County for $6 million to support ongoing data center construction, and later purchased additional land near Atlanta.
Microsoft acquired nearly 21 acres adjacent to its existing Palmetto data center campus in south Fulton County for $6 million to support ongoing data center construction, and later purchased additional land near Atlanta.
Novva Data Centers plans a 100 MW, 275,000 square foot data center on a 20 acre campus in North Las Vegas, expected to open in late 2023, with state tax abatements approved in summer 2022.
Novva Data Centers plans a 100 MW, 275,000 square foot data center on a 20 acre campus in North Las Vegas, expected to open in late 2023, with state tax abatements approved in summer 2022.
The EPA's facility registry lists NTT Global Data Centers Hi, LLC at 4050 NE Evergreen RD, Hillsboro, OR 97124 in Hillsboro, Oregon, with air and water permits and a hazardous waste record.
The EPA's facility registry lists NTT Global Data Centers Hi, LLC at 4050 NE Evergreen RD, Hillsboro, OR 97124 in Hillsboro, Oregon, with air and water permits and a hazardous waste record.
Verrus proposes a data center campus of three buildings and a substation on about 75 acres at the Mill Creek Corporate Center in southeast Salem, with a land use application filed on July 31, 2026 and a city moratorium initiated on August 3, 2026.
Verrus proposes a data center campus of three buildings and a substation on about 75 acres at the Mill Creek Corporate Center in southeast Salem, with a land use application filed on July 31, 2026 and a city moratorium initiated on August 3, 2026.
OpenAI is planning a large data center in Effingham County, Georgia, for which Georgia Power received approval for a 3.2 GW power deal, and which faces a citizen led zoning lawsuit and questions about water and electric bill impacts.
OpenAI is planning a large data center in Effingham County, Georgia, for which Georgia Power received approval for a 3.2 GW power deal, and which faces a citizen led zoning lawsuit and questions about water and electric bill impacts.
Serverfarm lists Serverfarm CH1 Chicago at 840 S. Canal Street, Chicago, IL on its interconnection and facility directory. Co located facilities include: Serverfarm (Serverfarm CH1 Chicago), DataBank, Ltd. (DataBank Chicago (ORD2)).
Strategic Real Estate Partners filed state paperwork for a three warehouse, 837,500 square foot data center campus on 53 acres near Conyers in Rockdale County, east of Atlanta.
Strategic Real Estate Partners filed state paperwork for a three warehouse, 837,500 square foot data center campus on 53 acres near Conyers in Rockdale County, east of Atlanta.
The EPA's facility registry lists T5 At Portland IV Data Center at 4915 NE Starr Boulevard, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.
The EPA's facility registry lists T5 At Portland IV Data Center at 4915 NE Starr Boulevard, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.
T5 and the village of Grayslake are moving forward with a data center development that has received its first permit in what is described as an $18 billion development, while a resident lawsuit is ongoing.
T5 and the village of Grayslake are moving forward with a data center development that has received its first permit in what is described as an $18 billion development, while a resident lawsuit is ongoing.
Trammell Crow Company proposes a $21 billion, 1,632 acre data center campus along I 75 in Forsyth, Georgia, comprising up to 12 million square feet across 21 data center warehouses.
Trammell Crow Company proposes a $21 billion, 1,632 acre data center campus along I 75 in Forsyth, Georgia, comprising up to 12 million square feet across 21 data center warehouses.
Apple operates its global command and data center campus at 3740 S Signal Butte Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110072222421 and 110062853416).
Apple operates its global command and data center campus at 3740 S Signal Butte Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110072222421 and 110062853416).
Ark Data Centers operates a commercial colocation data center at 191 E.
Ark Data Centers operates a commercial colocation data center at 191 E. Miller Ave. in Akron, Summit County, Ohio (EPA FRS ID 110071941749, Ohio EPA Air ID OH0000001677011602).
The Village of Ashville approved annexation and zoning ordinances for a proposed data center campus in Pickaway County, Ohio; in August 2026, the Supreme Court of Ohio ruled that a citizen referendum on the ordinances could proceed.
The Village of Ashville approved annexation and zoning ordinances for a proposed data center campus in Pickaway County, Ohio; in August 2026, the Supreme Court of Ohio ruled that a citizen referendum on the ordinances could proceed.
The EPA's facility registry lists Cellco, Dublin 1, RHQ And Data Center at 5175 Emerald Parkway, Dublin, OH 43017 in Dublin, Ohio, with a water permit.
The EPA's facility registry lists Cellco, Dublin 1, RHQ And Data Center at 5175 Emerald Parkway, Dublin, OH 43017 in Dublin, Ohio, with a water permit.
CyrusOne operates its Chandler data center campus (PHX1 through PHX8) at 2335 S Ellis St in Chandler, Maricopa County, Arizona (EPA FRS ID 110066858323).
CyrusOne operates its Chandler data center campus (PHX1 through PHX8) at 2335 S Ellis St in Chandler, Maricopa County, Arizona (EPA FRS ID 110066858323).
EdgeConneX operates its two building Mesa hyperscale data center campus (PHX02 and PHX03) at 3261 S Hawes Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110071988389 and 110071815477).
EdgeConneX operates its two building Mesa hyperscale data center campus (PHX02 and PHX03) at 3261 S Hawes Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110071988389 and 110071815477).
Edged operates its 24 MW, 206,000 square foot Edged Columbus (CMH01) data center at 6526 New Albany Road East in New Albany, Franklin County, Ohio, commissioned in September 2025 with a waterless closed loop cooling system.
Edged operates its 24 MW, 206,000 square foot Edged Columbus (CMH01) data center at 6526 New Albany Road East in New Albany, Franklin County, Ohio, commissioned in September 2025 with a waterless closed loop cooling system.
Encore Technologies operates a commercial colocation and cloud data center at 9333 Springboro Pike in Miamisburg, Montgomery County, Ohio (EPA FRS ID 110072072132, Ohio EPA Air ID OH0000000857095002).
Encore Technologies operates a commercial colocation and cloud data center at 9333 Springboro Pike in Miamisburg, Montgomery County, Ohio (EPA FRS ID 110072072132, Ohio EPA Air ID OH0000000857095002).
Google described a recently announced data center in Mesa, Arizona in a December 2023 blog post and said it chose air cooling after finding the local water source at high risk of scarcity and depletion.
Google described a recently announced data center in Mesa, Arizona in a December 2023 blog post and said it chose air cooling after finding the local water source at high risk of scarcity and depletion.
Iron Mountain Data Centers operates its three building Phoenix colocation campus (AZP-1, AZP-2, and AZP-3) at 615 N 48th St and 5100 E Roosevelt St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110023013736 and 110071725518).
Iron Mountain Data Centers operates its three building Phoenix colocation campus (AZP-1, AZP-2, and AZP-3) at 615 N 48th St and 5100 E Roosevelt St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110023013736 and 110071725518).
Meta operates its five building Mesa Data Center campus at the southeast corner of E Elliot Rd and S Ellsworth Rd in Mesa, Maricopa County, Arizona (EPA FRS ID 110071640426).
Meta operates its five building Mesa Data Center campus at the southeast corner of E Elliot Rd and S Ellsworth Rd in Mesa, Maricopa County, Arizona (EPA FRS ID 110071640426).
Microsoft operates its three building Goodyear hyperscale data center campus at 3785 N Citrus Rd and W McDowell Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071395846).
Microsoft operates its three building Goodyear hyperscale data center campus at 3785 N Citrus Rd and W McDowell Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071395846).
Microsoft operates its two building El Mirage data center campus at 12901 W Olive Ave in El Mirage, Maricopa County, Arizona (EPA FRS ID 110071395844).
Microsoft operates its two building El Mirage data center campus at 12901 W Olive Ave in El Mirage, Maricopa County, Arizona (EPA FRS ID 110071395844).
DataOne USA LLC, DataOne Vineland LLC and Nebius Inc.
DataOne USA LLC, DataOne Vineland LLC and Nebius Inc. are building a 300 MW AI data center campus at 3963 South Lincoln Avenue (Block 7503, Lots 1.01 and 35.01, about 106.59 acres; 3.1 million square feet planned, 2,647,628 square feet on the approved site plan) in Vineland, Cumberland County, New Jersey. City of Vineland stop construction order was issued August 10, 2026 (notice, page 26), 62 engines have operated since October 13, 2025, phase two was approved September 12, 2026, New Jersey DEP issued an Administrative Order (EA ID PEA260001-75894) with a $1.07 million penalty on September 22, 2026, and Sustain SJ, represented by Earthjustice, sent a Clean Air Act notice of intent to sue on October 21, 2026.
NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).
NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).
phoenixNAP operates its flagship commercial colocation and cloud interconnection data center at 3402 E University Dr in Phoenix, Maricopa County, Arizona.
phoenixNAP operates its flagship commercial colocation and cloud interconnection data center at 3402 E University Dr in Phoenix, Maricopa County, Arizona.
SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio.
SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio.
QTS operates its two building Phoenix 1 and Phoenix 2 data center campus at 1200 N 40th St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110071274775 and 110071406372).
QTS operates its two building Phoenix 1 and Phoenix 2 data center campus at 1200 N 40th St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110071274775 and 110071406372).
QTS is developing its five building Phoenix 3 (Glendale) hyperscale data center campus along W Camelback Rd near Loop 303 in Glendale, Maricopa County, Arizona (EPA FRS IDs 110071731384 and 110071275109).
QTS is developing its five building Phoenix 3 (Glendale) hyperscale data center campus along W Camelback Rd near Loop 303 in Glendale, Maricopa County, Arizona (EPA FRS IDs 110071731384 and 110071275109).
Stream Data Centers operates its three building Phoenix Goodyear (PHX I) hyperscale campus at 2950 S Litchfield Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071546724).
Stream Data Centers operates its three building Phoenix Goodyear (PHX I) hyperscale campus at 2950 S Litchfield Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071546724).
Prologis proposed a data center campus in Trenton, Butler County, Ohio; on September 1, 2026, the Supreme Court of Ohio ordered the Trenton City Council to place a charter amendment referendum on a special election ballot.
Prologis proposed a data center campus in Trenton, Butler County, Ohio; on September 1, 2026, the Supreme Court of Ohio ordered the Trenton City Council to place a charter amendment referendum on a special election ballot.
The EPA's facility registry lists Verizon North INC, Norwalk Data Center at 14 Gibbs RD, Norwalk, OH 44857 in Norwalk, Ohio, with no permit program listed.
The EPA's facility registry lists Verizon North INC, Norwalk Data Center at 14 Gibbs RD, Norwalk, OH 44857 in Norwalk, Ohio, with no permit program listed.
The EPA's facility registry lists Verizon Wireless, Data Center Dublin II at 5165 Emerald Pkwy, Dublin, OH 43017 in Dublin, Ohio, with no permit program listed.
The EPA's facility registry lists Verizon Wireless, Data Center Dublin II at 5165 Emerald Pkwy, Dublin, OH 43017 in Dublin, Ohio, with no permit program listed.
Vermaland proposed an 11 building data center campus near Eloy in Pinal County, Arizona; the Pinal County Board of Supervisors voted 4 to 1 to reject the rezoning application.
Vermaland proposed an 11 building data center campus near Eloy in Pinal County, Arizona; the Pinal County Board of Supervisors voted 4 to 1 to reject the rezoning application.
365 Data Centers operates the Reston colocation facility at 11513 Sunset Hills Road in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433709).
365 Data Centers operates the Reston colocation facility at 11513 Sunset Hills Road in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433709).
The EPA's facility registry lists Amazon Data Services, DCA-51 at 7471 Bear Wallow RD, Warrenton, VA 20186 in Warrenton, Virginia, with air and water permits.
The EPA's facility registry lists Amazon Data Services, DCA-51 at 7471 Bear Wallow RD, Warrenton, VA 20186 in Warrenton, Virginia, with air and water permits.
The EPA's facility registry lists Amazon Data Services, INC.
The EPA's facility registry lists Amazon Data Services, INC. IAD-1 IAD-9 at 4101 A West Fax Drive, Chantilly, VA 20151 in Chantilly, Virginia, with an air permit.
The EPA's facility registry lists Amazon Data Services, INC.
The EPA's facility registry lists Amazon Data Services, INC. IAD-55 IAD-64 IAD-84 at 15395 John Marshall Hwy, Haymarket, VA 20169 in Haymarket, Virginia, with an air permit.
The EPA's facility registry lists Amazon Data Services, Northeast Creek Tech Campus at Jefferson Hwy US Route 33, Louisa, VA 23093 in Louisa, Virginia, with a water permit.
The EPA's facility registry lists Amazon Data Services, Northeast Creek Tech Campus at Jefferson Hwy US Route 33, Louisa, VA 23093 in Louisa, Virginia, with a water permit.
CloudHQ operates the Manassas Corporate Center (MCC1) data center campus at 10880 Airman Avenue in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070049664).
CloudHQ operates the Manassas Corporate Center (MCC1) data center campus at 10880 Airman Avenue in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070049664).
CoreSite operates the Reston Campus (VA3) data center at 12369 Sunrise Valley Drive in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070361655).
CoreSite operates the Reston Campus (VA3) data center at 12369 Sunrise Valley Drive in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070361655).
DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).
DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).
DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).
DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).
The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.
The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.
The EPA's facility registry lists Edgeconnex Richmond Holdings LLC at 1450 East Parham Road, Richmond, VA 23228 in Richmond, Virginia, with a hazardous waste record.
The EPA's facility registry lists Edgeconnex Richmond Holdings LLC at 1450 East Parham Road, Richmond, VA 23228 in Richmond, Virginia, with a hazardous waste record.
Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).
Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).
The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.
The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.
Equinix operates the DC7 data center at 7990 Science Applications Court in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110020674858).
Equinix operates the DC7 data center at 7990 Science Applications Court in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110020674858).
Equinix operates the DC8 data center at 8502A Tyco Road in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433692).
Equinix operates the DC8 data center at 8502A Tyco Road in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433692).
EvoSwitch operates the WDC1 data center at 9651 Hornbaker Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110038456140).
EvoSwitch operates the WDC1 data center at 9651 Hornbaker Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110038456140).
The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.
The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.
Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).
Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).
The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.
The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.
Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.
Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.
Google operates the Leesburg data center campus at 20491 Goose Landing Lane in Leesburg, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070558483) and reported in the Google 2026 Environmental Report with 238.1 million gallons of annual water withdrawal in 2025.
Google operates the Leesburg data center campus at 20491 Goose Landing Lane in Leesburg, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070558483) and reported in the Google 2026 Environmental Report with 238.1 million gallons of annual water withdrawal in 2025.
Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.
Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.
Iron Mountain Data Centers operates the Manassas (VA-1) data center campus at 11680 Hayden Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070144508).
Iron Mountain Data Centers operates the Manassas (VA-1) data center campus at 11680 Hayden Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070144508).
Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).
Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).
The EPA's facility registry lists Loudoun Data Center 1 (LDC1) at 21955 Loudoun County Parkway, Ashburn, VA 20147 in Ashburn, Virginia, with a hazardous waste record.
The EPA's facility registry lists Loudoun Data Center 1 (LDC1) at 21955 Loudoun County Parkway, Ashburn, VA 20147 in Ashburn, Virginia, with a hazardous waste record.
The EPA's facility registry lists Microsoft Blue Ridge (IAD11-12-13) Data Center at 24282 Quail Ridge LN, Aldie, VA 20105 in Aldie, Virginia, with air and water permits.
The EPA's facility registry lists Microsoft Blue Ridge (IAD11-12-13) Data Center at 24282 Quail Ridge LN, Aldie, VA 20105 in Aldie, Virginia, with air and water permits.
The EPA's facility registry lists Microsoft Corp DCS, AVC09 AVC13 Datacenter at Roanoke River Regional Business Park, La Crosse, VA 23950 in La Crosse, Virginia, with an air permit.
The EPA's facility registry lists Microsoft Corp DCS, AVC09 AVC13 Datacenter at Roanoke River Regional Business Park, La Crosse, VA 23950 in La Crosse, Virginia, with an air permit.
The EPA's facility registry lists Microsoft Corporation, East Coast Data Center at 101 Herbert Drive, Boydton, VA 23917 in Boydton, Virginia, with air and water permits.
The EPA's facility registry lists Microsoft Corporation, East Coast Data Center at 101 Herbert Drive, Boydton, VA 23917 in Boydton, Virginia, with air and water permits.
Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).
Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).
NTT Global Data Centers operates the Ashburn VA1 data center campus at 44664 Guilford Drive in Ashburn, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043702801).
NTT Global Data Centers operates the Ashburn VA1 data center campus at 44664 Guilford Drive in Ashburn, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043702801).
The EPA's facility registry lists Rockingham Memorial Hospital Data Center at 411 Stone Spring Road, Harrisonburg, VA 22801 in Harrisonburg, Virginia, with an air permit.
The EPA's facility registry lists Rockingham Memorial Hospital Data Center at 411 Stone Spring Road, Harrisonburg, VA 22801 in Harrisonburg, Virginia, with an air permit.
Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).
Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).
TECfusions operates the Clarksville data center at 250 Burlington Drive in Clarksville, Mecklenburg County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110001894040).
TECfusions operates the Clarksville data center at 250 Burlington Drive in Clarksville, Mecklenburg County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110001894040).
TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).
TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).
The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.
The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.
Evocative operates the Reston (VA1) data center at 1807 Michael Faraday Court in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110031222451).
Evocative operates the Reston (VA1) data center at 1807 Michael Faraday Court in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110031222451).
Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029.
Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029.
Pennhurst Holdings LLC proposed a 1.9 million square foot, 4 building data center campus at 1205 Commonwealth Drive on the former Pennhurst State School and Hospital property in East Vincent Township, Chester County, Pennsylvania.
Pennhurst Holdings LLC proposed a 1.9 million square foot, 4 building data center campus at 1205 Commonwealth Drive on the former Pennhurst State School and Hospital property in East Vincent Township, Chester County, Pennsylvania. East Vincent Township supervisors unanimously rejected the proposal in May 2026, prompting an appeal to the Chester County Court of Common Pleas.
The 4-3 Glen Brook Group proposed a 39 building data center campus spanning 4,466 acres across 279 properties in Salem Township, Luzerne County, Pennsylvania, with projected power demand of 3.5 to 4 gigawatts.
The 4-3 Glen Brook Group proposed a 39 building data center campus spanning 4,466 acres across 279 properties in Salem Township, Luzerne County, Pennsylvania, with projected power demand of 3.5 to 4 gigawatts. In August 2026, a Luzerne County Court of Common Pleas judge ordered Salem Township to redo its July 23, 2026 zoning hearing after residents were locked out of the municipal building.
MLP Ventures proposed a 2 million square foot data center facility at 900 Conshohocken Road in Plymouth Township, Montgomery County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
MLP Ventures proposed a 2 million square foot data center facility at 900 Conshohocken Road in Plymouth Township, Montgomery County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
Ace Data Center operates a single building colocation data center at 1950 South 950 East in Provo, Utah County, Utah under Utah Division of Air Quality permit 4904900259.
Ace Data Center operates a single building colocation data center at 1950 South 950 East in Provo, Utah County, Utah under Utah Division of Air Quality permit 4904900259.
Aligned Data Centers operates a 55 acre, 3 building colocation data center campus at 3333 W.
Aligned Data Centers operates a 55 acre, 3 building colocation data center campus at 3333 W. 9000 South in West Jordan, Salt Lake County, Utah (SLC-01, SLC-02, and SLC-03). Aligned acquired the parcel in 2018, placing one building inside a former semiconductor manufacturing plant and constructing two additional data center buildings under West Jordan building permits and Utah Division of Air Quality Approval Order AI Site 15939 (Project N160660003). In August 2026, after four resident complaints about a persistent humming noise, the Salt Lake County Health Department opened an acoustic investigation scheduled to conclude in November 2026.
Aligned Data Centers broke ground on September 10, 2026 on Project Phoenix (Aligned PIT-01), a 3 building, 2 gigawatt data center campus spanning 660 acres on the former Bruce Mansfield coal power plant site in Shippingport, Beaver County, Pennsylvania.
Aligned Data Centers broke ground on September 10, 2026 on Project Phoenix (Aligned PIT-01), a 3 building, 2 gigawatt data center campus spanning 660 acres on the former Bruce Mansfield coal power plant site in Shippingport, Beaver County, Pennsylvania. The campus uses a closed loop cooling system and dedicated on site natural gas generation, with 12 permit applications tracked by the Pennsylvania Department of Environmental Protection (7 issued, 5 pending).
Amazon Web Services is constructing a hyperscale data center campus acquired from Talen Energy (Cumulus Data) on 1,200 acres adjacent to the Susquehanna Steam Electric Station at 500 Salem Boulevard in Salem Township, Luzerne County, Pennsylvania.
Amazon Web Services is constructing a hyperscale data center campus acquired from Talen Energy (Cumulus Data) on 1,200 acres adjacent to the Susquehanna Steam Electric Station at 500 Salem Boulevard in Salem Township, Luzerne County, Pennsylvania. Phase 1 has completed Pennsylvania DEP review with all 4 permits issued, while Phase 2 has 4 permits under review (3 issued, 1 pending).
Archbald I LLC and Archbald II LLC proposed a 2 building data center project in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
Archbald I LLC and Archbald II LLC proposed a 2 building data center project in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
Keel Infrastructure and Bitfarms (following its acquisition of Stronghold Digital Mining) are developing the Carbon Node East high performance computing and AI data center campus adjacent to the Panther Creek Energy Facility at 402 Dennison Road in Nesquehoning Borough, Carbon County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.
Keel Infrastructure and Bitfarms (following its acquisition of Stronghold Digital Mining) are developing the Carbon Node East high performance computing and AI data center campus adjacent to the Panther Creek Energy Facility at 402 Dennison Road in Nesquehoning Borough, Carbon County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.
Comcast Corporation operates the Comcast XSDC Data Center at 21 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania, permitted for emergency backup power generation with the Pennsylvania Department of Environmental Protection and Allegheny County Health Department.
Comcast Corporation operates the Comcast XSDC Data Center at 21 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania, permitted for emergency backup power generation with the Pennsylvania Department of Environmental Protection and Allegheny County Health Department.
DataBank operates the PIT2 colocation data center providing 4 megawatts of critical IT load at 35 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania.
DataBank operates the PIT2 colocation data center providing 4 megawatts of critical IT load at 35 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania.
DataBank operates the PHL1 colocation data center providing 3.1 megawatts of critical IT load at 401 N.
DataBank operates the PHL1 colocation data center providing 3.1 megawatts of critical IT load at 401 N. Broad Street in Philadelphia, Philadelphia County, Pennsylvania.
DataBank operates the 23 acre, 5 building Granite Point colocation campus (SLC2, SLC3, SLC4, SLC5, and SLC6) at 14870 S.
DataBank operates the 23 acre, 5 building Granite Point colocation campus (SLC2, SLC3, SLC4, SLC5, and SLC6) at 14870 S. Pony Express Road in Bluffdale, Salt Lake County, Utah, with 66 megawatts of critical IT capacity.
eBay Inc. operates its Topaz SLC Data Center at 6614 West Crimson View Drive in South Jordan, Salt Lake County, Utah, regulated under Utah Division of Air Quality Clean Air Act ID 21467111 and EPA FRS 110070397211.
Equinix operates the PH1 International Business Exchange colocation data center inside the Terminal Commerce Building at 401 N.
Equinix operates the PH1 International Business Exchange colocation data center inside the Terminal Commerce Building at 401 N. Broad Street in Philadelphia, Philadelphia County, Pennsylvania.
Amazon Web Services is developing a hyperscale data center campus at the Keystone Trade Center (former U.S.
Amazon Web Services is developing a hyperscale data center campus at the Keystone Trade Center (former U.S. Steel Fairless Works) at 1000 Steel Road South in Falls Township, Bucks County, Pennsylvania. Phase 1 has completed Pennsylvania DEP review with 1 permit issued, while Phase 2 has 4 environmental permits under review (1 issued, 3 pending).
Flexential operates the 80,000 square foot, 3.6 megawatt PHL01 colocation data center at 1000 Black Rock Road in Upper Providence Township (Collegeville), Montgomery County, Pennsylvania.
Flexential operates the 80,000 square foot, 3.6 megawatt PHL01 colocation data center at 1000 Black Rock Road in Upper Providence Township (Collegeville), Montgomery County, Pennsylvania.
Quantm Group LLC and 1778 Rich Pike LLC proposed the Gouldsboro Data Center Project (Project Gold) along Drinker Turnpike in Clifton Township, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
Quantm Group LLC and 1778 Rich Pike LLC proposed the Gouldsboro Data Center Project (Project Gold) along Drinker Turnpike in Clifton Township, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
H5 Data Centers operates a carrier hotel and colocation facility at 2202 Liberty Avenue in the Strip District of Pittsburgh, Allegheny County, Pennsylvania.
H5 Data Centers operates a carrier hotel and colocation facility at 2202 Liberty Avenue in the Strip District of Pittsburgh, Allegheny County, Pennsylvania.
Digital Realty and carrier hotel tenants operate a 670,000 square foot, 10 megawatt interconnection and data center facility at 833 Chestnut Street in Center City Philadelphia, Philadelphia County, Pennsylvania.
Digital Realty and carrier hotel tenants operate a 670,000 square foot, 10 megawatt interconnection and data center facility at 833 Chestnut Street in Center City Philadelphia, Philadelphia County, Pennsylvania.
NorthPoint Development and Nebius proposed the Highridge Data Project on a 600 acre tract in Highridge Business Park in Butler Township, Schuylkill County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.
NorthPoint Development and Nebius proposed the Highridge Data Project on a 600 acre tract in Highridge Business Park in Butler Township, Schuylkill County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.
Homer City Redevelopment LLC is redeveloping the 3,200 acre former Homer City Generating Station at 1750 Power Plant Road in Center and Blacklick Townships near Homer City, Indiana County, Pennsylvania into a natural gas powered AI data center campus with up to 4.5 gigawatts of generation capacity.
Homer City Redevelopment LLC is redeveloping the 3,200 acre former Homer City Generating Station at 1750 Power Plant Road in Center and Blacklick Townships near Homer City, Indiana County, Pennsylvania into a natural gas powered AI data center campus with up to 4.5 gigawatts of generation capacity. The Indiana County Conservation District issued a PAG-02 general stormwater construction permit and a draft NPDES industrial waste amendment in 2026 as 1,800 tradespeople work on site.
Castleton Commodities International and UGI Development Company have proposed a data center facility adjacent to the Hunlock Creek Energy Center along US Route 11 in Hunlock Township, Luzerne County, Pennsylvania, where the power station holds Susquehanna River Basin Commission Docket 20090632 for Susquehanna River water withdrawal and consumptive use.
Castleton Commodities International and UGI Development Company have proposed a data center facility adjacent to the Hunlock Creek Energy Center along US Route 11 in Hunlock Township, Luzerne County, Pennsylvania, where the power station holds Susquehanna River Basin Commission Docket 20090632 for Susquehanna River water withdrawal and consumptive use.
Iron Mountain Data Centers operates the WPA-1 underground data center facility providing 21 megawatts of capacity inside a former limestone mine at 1137 Branchton Road in Boyers, Cherry Township, Butler County, Pennsylvania.
Iron Mountain Data Centers operates the WPA-1 underground data center facility providing 21 megawatts of capacity inside a former limestone mine at 1137 Branchton Road in Boyers, Cherry Township, Butler County, Pennsylvania.
Chirisa Technology Parks and CoreWeave are developing Lancaster AI Hub East across 2 industrial buildings at the former RR Donnelley East printing complex at 216 Greenfield Road in the City of Lancaster, Lancaster County, Pennsylvania, with 4 Phase 1 environmental permits under review at the Pennsylvania Department of Environmental Protection and a second phase proposed.
Chirisa Technology Parks and CoreWeave are developing Lancaster AI Hub East across 2 industrial buildings at the former RR Donnelley East printing complex at 216 Greenfield Road in the City of Lancaster, Lancaster County, Pennsylvania, with 4 Phase 1 environmental permits under review at the Pennsylvania Department of Environmental Protection and a second phase proposed.
Chirisa Technology Parks and CoreWeave are redeveloping the former RR Donnelley West printing facility at 1375 Harrisburg Pike in the City of Lancaster, Lancaster County, Pennsylvania into the 2 building, 100 megawatt Lancaster AI Hub West campus.
Chirisa Technology Parks and CoreWeave are redeveloping the former RR Donnelley West printing facility at 1375 Harrisburg Pike in the City of Lancaster, Lancaster County, Pennsylvania into the 2 building, 100 megawatt Lancaster AI Hub West campus. The Pennsylvania Department of Environmental Protection has issued 2 of 3 tracked permits, including an Air Quality Plan Approval for 176 backup diesel generators.
A data center campus is proposed in Londonderry Township, Dauphin County, Pennsylvania near the Three Mile Island Unit 1 (Crane Clean Energy Center) nuclear generating station, listed on the Pennsylvania DEP Data Center Permit Tracker.
A data center campus is proposed in Londonderry Township, Dauphin County, Pennsylvania near the Three Mile Island Unit 1 (Crane Clean Energy Center) nuclear generating station, listed on the Pennsylvania DEP Data Center Permit Tracker.
MLP Ventures proposed a 4.6 million square foot, 7 building data center campus across five properties in Upper Merion Township (King of Prussia), Montgomery County, Pennsylvania.
MLP Ventures proposed a 4.6 million square foot, 7 building data center campus across five properties in Upper Merion Township (King of Prussia), Montgomery County, Pennsylvania. After the Upper Merion Township Board of Supervisors rejected preliminary land development plans in August 2026, the developer withdrew its zoning applications on October 20, 2026.
Newport Township issued municipal zoning permits in September 2026 for the Newport Ridge Data Center campus in Luzerne County, Pennsylvania, authorizing 15 closed loop data center buildings powered by three natural gas generation stations across mixed use and industrial zones.
Newport Township issued municipal zoning permits in September 2026 for the Newport Ridge Data Center campus in Luzerne County, Pennsylvania, authorizing 15 closed loop data center buildings powered by three natural gas generation stations across mixed use and industrial zones.
Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan, Salt Lake County, where Phase 1 opened in 2023 and Phases 2 and 3 are under construction across three disclosed buildings following a $355 million CIM Group investment in June 2022 and $2 billion in construction financing in March 2025.
Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan, Salt Lake County, where Phase 1 opened in 2023 and Phases 2 and 3 are under construction across three disclosed buildings following a $355 million CIM Group investment in June 2022 and $2 billion in construction financing in March 2025.
The National Security Agency operates the Intelligence Community Comprehensive National Cybersecurity Initiative Data Center at Camp Williams in Bluffdale, Utah County and Salt Lake County, Utah (EPA FRS 110043515700).
The National Security Agency operates the Intelligence Community Comprehensive National Cybersecurity Initiative Data Center at Camp Williams in Bluffdale, Utah County and Salt Lake County, Utah (EPA FRS 110043515700).
PAX-1 Data Center is a proposed data center campus on a 700 acre tract off Country Club Road in Middlesex Township, Cumberland County, Pennsylvania.
PAX-1 Data Center is a proposed data center campus on a 700 acre tract off Country Club Road in Middlesex Township, Cumberland County, Pennsylvania. In August 2026, Governor Josh Shapiro removed PAX-1 from the PA Permit Fast Track program under Executive Order 2026-05, while a Chapter 102 NPDES stormwater permit application remains under review at the Pennsylvania Department of Environmental Protection.
Wampum I LLC and Switch filed local land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for a 3 building data center campus on the 384 acre former Pittsburgh International Race Complex property at 201 Penndale Road in Big Beaver Borough, Beaver County, Pennsylvania.
Wampum I LLC and Switch filed local land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for a 3 building data center campus on the 384 acre former Pittsburgh International Race Complex property at 201 Penndale Road in Big Beaver Borough, Beaver County, Pennsylvania.
Sentinel Green Fig LLC (fifteenfortyseven Critical Systems Realty and Green Fig Land Company) is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Forge, a 2 building, 150 megawatt hyperscale data center campus on 100 acres at 258 Swedesford Road in East Whiteland Township, Chester County, Pennsylvania.
Sentinel Green Fig LLC (fifteenfortyseven Critical Systems Realty and Green Fig Land Company) is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Forge, a 2 building, 150 megawatt hyperscale data center campus on 100 acres at 258 Swedesford Road in East Whiteland Township, Chester County, Pennsylvania.
Archbald 25 Developer LLC is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Gravity, a proposed 7 building AI data center complex in Archbald Borough, Lackawanna County, Pennsylvania that was removed from the PA Permit Fast Track program in May 2026.
Archbald 25 Developer LLC is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Gravity, a proposed 7 building AI data center complex in Archbald Borough, Lackawanna County, Pennsylvania that was removed from the PA Permit Fast Track program in May 2026.
NorthPoint Development filed land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for Project Hazelnut, a 15 building data center campus for Amazon Web Services on 1,282 acres north of Humboldt Industrial Park North in Hazle Township, Luzerne County, Pennsylvania, with an estimated municipal water demand of 67,000 gallons per day.
NorthPoint Development filed land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for Project Hazelnut, a 15 building data center campus for Amazon Web Services on 1,282 acres north of Humboldt Industrial Park North in Hazle Township, Luzerne County, Pennsylvania, with an estimated municipal water demand of 67,000 gallons per day. Hazle Township supervisors denied the preliminary land development plan in November 2025 and enacted a zoning ordinance amendment in October 2026 while state environmental review remains pending.
Patrinely and Provident Real Estate proposed Project Scott in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
Patrinely and Provident Real Estate proposed Project Scott in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
QTS Data Centers is constructing its QTS SLC DC1 hyperscale data center campus in Eagle Mountain, Utah County, Utah under stormwater permits UTRC08700 and UTRC11607.
QTS Data Centers is constructing its QTS SLC DC1 hyperscale data center campus in Eagle Mountain, Utah County, Utah under stormwater permits UTRC08700 and UTRC11607.
QTS Data Centers acquired approximately 1,700 acres for $580 million in Salem Township, Luzerne County, Pennsylvania and received township approval in July 2026 for road vacations and a 15 building data center master plan, with an Act 537 sewage facilities permit under review at the Pennsylvania Department of Environmental Protection.
QTS Data Centers acquired approximately 1,700 acres for $580 million in Salem Township, Luzerne County, Pennsylvania and received township approval in July 2026 for road vacations and a 15 building data center master plan, with an Act 537 sewage facilities permit under review at the Pennsylvania Department of Environmental Protection.
Slate Belt Holdings LLC, a partnership including Talen Energy and the River Pointe Logistics Center developers, proposed a 23 building data center campus on 754 acres along River Road in Upper Mount Bethel Township, Northampton County, Pennsylvania, with each building pad designed for a 201,000 square foot footprint.
Slate Belt Holdings LLC, a partnership including Talen Energy and the River Pointe Logistics Center developers, proposed a 23 building data center campus on 754 acres along River Road in Upper Mount Bethel Township, Northampton County, Pennsylvania, with each building pad designed for a 201,000 square foot footprint.
Upper Mount Bethel Township, Northampton County, PA
Mudiita Land Venture LLC acquired 528.6 acres in Ransom Township near Old Forge, Lackawanna County, Pennsylvania for the proposed Scranton Materials hyperscale data center campus, listed on the Pennsylvania DEP Data Center Permit Tracker.
Mudiita Land Venture LLC acquired 528.6 acres in Ransom Township near Old Forge, Lackawanna County, Pennsylvania for the proposed Scranton Materials hyperscale data center campus, listed on the Pennsylvania DEP Data Center Permit Tracker.
DEPG Moiser Assoc. LP / DEPG of Shawnee II Assoc. LP
DEPG Moiser Associates LP and DEPG of Shawnee II Associates LP proposed a single 500,000 square foot data center building within the Smithfield Gateway development along Route 209 in Smithfield Township, Monroe County, Pennsylvania.
DEPG Moiser Associates LP and DEPG of Shawnee II Associates LP proposed a single 500,000 square foot data center building within the Smithfield Gateway development along Route 209 in Smithfield Township, Monroe County, Pennsylvania.
NorthPoint Development proposed the Spring Mountain Quakake Tunnel data center project in Packer Township, Carbon County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
NorthPoint Development proposed the Spring Mountain Quakake Tunnel data center project in Packer Township, Carbon County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.
TECfusions operates the Keystone Connect AI data center campus on the 1,395 acre former Alcoa Technical Center property at 780 Burrell Avenue in New Kensington and Upper Burrell Township, Westmoreland County, Pennsylvania.
TECfusions operates the Keystone Connect AI data center campus on the 1,395 acre former Alcoa Technical Center property at 780 Burrell Avenue in New Kensington and Upper Burrell Township, Westmoreland County, Pennsylvania. Building J launched live GPU capacity in August 2026 following Upper Burrell Township land development approval and completion of Pennsylvania DEP review (4 permits issued, 1 pending), with long term plans for up to 3 gigawatts of on site natural gas power.
TierPoint operates the Allentown TekPark colocation data center at 9999 Hamilton Boulevard in Breinigsville (Upper Macungie Township), Lehigh County, Pennsylvania.
TierPoint operates the Allentown TekPark colocation data center at 9999 Hamilton Boulevard in Breinigsville (Upper Macungie Township), Lehigh County, Pennsylvania.
TierPoint operates its Valley Forge colocation data center at 1000 Adams Avenue in Audubon (Lower Providence Township), Montgomery County, Pennsylvania.
TierPoint operates its Valley Forge colocation data center at 1000 Adams Avenue in Audubon (Lower Providence Township), Montgomery County, Pennsylvania.
A Chapter 102 NPDES stormwater permit application is under review at the Pennsylvania Department of Environmental Protection for the Triboro Industrial Park Data Center in Throop Borough, Lackawanna County, Pennsylvania.
A Chapter 102 NPDES stormwater permit application is under review at the Pennsylvania Department of Environmental Protection for the Triboro Industrial Park Data Center in Throop Borough, Lackawanna County, Pennsylvania.
Valar Atomics proposed Project Beehive, a nuclear powered data center campus on Utah Trust Lands Administration industrial land south of Price in Carbon County, Utah.
Valar Atomics proposed Project Beehive, a nuclear powered data center campus on Utah Trust Lands Administration industrial land south of Price in Carbon County, Utah.
Spanish Fork City Council approved a Title 15 zoning amendment creating a Data Center Overlay District on September 21, 2026, while the developer proposed moving the 250 MW project to an unincorporated Utah County site in the Stockman Flats area south of the city.
Spanish Fork City Council approved a Title 15 zoning amendment creating a Data Center Overlay District on September 21, 2026, while the developer proposed moving the 250 MW project to an unincorporated Utah County site in the Stockman Flats area south of the city.
Pine Line Inc proposed the Wildcat Ridge Data Center Campus on 500 acres along Wildcat Road in Archbald Borough, Lackawanna County, Pennsylvania, planned for 14 data center buildings and 588 emergency backup diesel generators alongside adjacent PPL and Blackstone natural gas power generation.
Pine Line Inc proposed the Wildcat Ridge Data Center Campus on 500 acres along Wildcat Road in Archbald Borough, Lackawanna County, Pennsylvania, planned for 14 data center buildings and 588 emergency backup diesel generators alongside adjacent PPL and Blackstone natural gas power generation.
Edged Energy proposed a $93 million data center on Telegraph Road in Prichard, prompting the city council to weigh a 480 day moratorium on new data center permits.
Edged Energy proposed a $93 million data center on Telegraph Road in Prichard, prompting the city council to weigh a 480 day moratorium on new data center permits.
Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records.
Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records.
The EPA facility registry lists 3AY Sabey at Ocean County Business Park (1889 Route 9, Toms River, Ocean County, New Jersey) with no active permit program; Sabey Data Centers operates no commercial colocation facility at this light industrial and medical office park address.
The EPA facility registry lists 3AY Sabey at Ocean County Business Park (1889 Route 9, Toms River, Ocean County, New Jersey) with no active permit program; Sabey Data Centers operates no commercial colocation facility at this light industrial and medical office park address.
The EPA's facility registry lists Adp Rankin Data Hub, LLC, Data Center at State Highway 18, Brandon, MS 39042 in Brandon, Mississippi, with a water permit.
The EPA's facility registry lists Adp Rankin Data Hub, LLC, Data Center at State Highway 18, Brandon, MS 39042 in Brandon, Mississippi, with a water permit.
The EPA facility registry lists the Ameritech (AT&T Wisconsin) regional telecommunications switching and internal operations center at 7737 South Howell Avenue in Oak Creek, Milwaukee County, Wisconsin.
The EPA facility registry lists the Ameritech (AT&T Wisconsin) regional telecommunications switching and internal operations center at 7737 South Howell Avenue in Oak Creek, Milwaukee County, Wisconsin.
The EPA facility registry lists Applied Digital Corp at 214 Flynn Avenue in Moorestown, Burlington County, New Jersey, a legacy electronics and industrial suite rather than a commercial colocation data center.
The EPA facility registry lists Applied Digital Corp at 214 Flynn Avenue in Moorestown, Burlington County, New Jersey, a legacy electronics and industrial suite rather than a commercial colocation data center.
The EPA facility registry lists Applied Digital Data Systems Inc.
The EPA facility registry lists Applied Digital Data Systems Inc. (ADDS) at 100 Marcus Boulevard in Hauppauge, Suffolk County, New York, a legacy computer terminal manufacturing facility rather than a commercial colocation data center.
The EPA's facility registry lists Bitpower Data Center at Along Mill Creek Hwy S Of Ba&p Railroad On E Side, Anaconda, MT 59711 in Anaconda, Montana, with a water permit.
The EPA's facility registry lists Bitpower Data Center at Along Mill Creek Hwy S Of Ba&p Railroad On E Side, Anaconda, MT 59711 in Anaconda, Montana, with a water permit.
The EPA facility registry lists Cellco Irvine Data Center at 2640 Main Street in Irvine, Orange County, California, an internal wireless carrier mobile switching center rather than a commercial colocation data center.
The EPA facility registry lists Cellco Irvine Data Center at 2640 Main Street in Irvine, Orange County, California, an internal wireless carrier mobile switching center rather than a commercial colocation data center.
The EPA facility registry lists DataBank IMX at 840 Riverside Parkway in West Sacramento, Yolo County, California, a document scanning and microfilming bureau with a silver halide hazardous waste record rather than a commercial colocation data center.
The EPA facility registry lists DataBank IMX at 840 Riverside Parkway in West Sacramento, Yolo County, California, a document scanning and microfilming bureau with a silver halide hazardous waste record rather than a commercial colocation data center.
The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit.
The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit.
The EPA facility registry lists Grant Node Data Center (FRS ID 110072196971) with a construction stormwater permit at 7906 Randolph Road NE in Moses Lake, Grant County, Washington; no commercial colocation or hyperscale operator directory entry is confirmed at this parcel.
The EPA facility registry lists Grant Node Data Center (FRS ID 110072196971) with a construction stormwater permit at 7906 Randolph Road NE in Moses Lake, Grant County, Washington; no commercial colocation or hyperscale operator directory entry is confirmed at this parcel.
The EPA facility registry lists the Aegon and Transamerica internal insurance enterprise data center at 6910 Tower Road SW in Cedar Rapids, Linn County, Iowa.
The EPA facility registry lists the Aegon and Transamerica internal insurance enterprise data center at 6910 Tower Road SW in Cedar Rapids, Linn County, Iowa.
The EPA facility registry lists Intel Corporation Data Center at 2151 Mission College Boulevard in Santa Clara, Santa Clara County, California, an internal semiconductor engineering and corporate research data center rather than a commercial colocation facility.
The EPA facility registry lists Intel Corporation Data Center at 2151 Mission College Boulevard in Santa Clara, Santa Clara County, California, an internal semiconductor engineering and corporate research data center rather than a commercial colocation facility.
The EPA facility registry lists IREA Highfield Data Center SSS4275 (FRS ID 110070204729) as an electric utility distribution feeder construction stormwater permit along Highfield Parkway in Parker, Douglas County, Colorado, rather than a standalone data center.
The EPA facility registry lists IREA Highfield Data Center SSS4275 (FRS ID 110070204729) as an electric utility distribution feeder construction stormwater permit along Highfield Parkway in Parker, Douglas County, Colorado, rather than a standalone data center.
The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.
The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.
The EPA facility registry lists Jordan Feeder, Flexential Project (FRS ID 110071178997) as an underground electrical feeder line construction stormwater permit at South Potomac Street and East Broncos Parkway in Arapahoe County, Colorado, rather than a data center building.
The EPA facility registry lists Jordan Feeder, Flexential Project (FRS ID 110071178997) as an underground electrical feeder line construction stormwater permit at South Potomac Street and East Broncos Parkway in Arapahoe County, Colorado, rather than a data center building.
The EPA facility registry lists the Morgan Stanley Data Center at 665 Howard Avenue in Somerset, Somerset County, New Jersey, an internal investment bank enterprise computing center rather than a commercial colocation facility.
The EPA facility registry lists the Morgan Stanley Data Center at 665 Howard Avenue in Somerset, Somerset County, New Jersey, an internal investment bank enterprise computing center rather than a commercial colocation facility.
The EPA facility registry lists NT and SA LA Data Center at 1000 West Temple Street in Los Angeles, Los Angeles County, California, an internal Bank of America National Trust and Savings Association banking operations center rather than a commercial colocation data center.
The EPA facility registry lists NT and SA LA Data Center at 1000 West Temple Street in Los Angeles, Los Angeles County, California, an internal Bank of America National Trust and Savings Association banking operations center rather than a commercial colocation data center.
The EPA's facility registry lists Oppidan Data Center, MGM at 6220 Perimeter Parkway, Montgomery, AL 36116 in Montgomery, Alabama, with a water permit.
The EPA's facility registry lists Oppidan Data Center, MGM at 6220 Perimeter Parkway, Montgomery, AL 36116 in Montgomery, Alabama, with a water permit.
The EPA facility registry lists Sabey Corp Seattle (FRS ID 110005388231) at 101 Elliott Avenue West, Suite 330 in Seattle, King County, Washington, which is a historical commercial office suite RCRA generator registration rather than a Sabey Data Centers Intergate facility.
The EPA facility registry lists Sabey Corp Seattle (FRS ID 110005388231) at 101 Elliott Avenue West, Suite 330 in Seattle, King County, Washington, which is a historical commercial office suite RCRA generator registration rather than a Sabey Data Centers Intergate facility.
The EPA facility registry lists the SCE&G Irmo internal electric utility operations data center at the intersection of Lake Murray Boulevard and Old Bush River Road in Irmo, Lexington County, South Carolina.
The EPA facility registry lists the SCE&G Irmo internal electric utility operations data center at the intersection of Lake Murray Boulevard and Old Bush River Road in Irmo, Lexington County, South Carolina.
The EPA's facility registry lists Solar Data Center White Horse Ranch at 1 Mile South On NM113 From Intersection With I10, Lordsburg, NM 88045 in Lordsburg, New Mexico, with a water permit.
The EPA's facility registry lists Solar Data Center White Horse Ranch at 1 Mile South On NM113 From Intersection With I10, Lordsburg, NM 88045 in Lordsburg, New Mexico, with a water permit.
The EPA facility registry lists T Mobile USA Inc. at 4 Sylvan Way in Parsippany, Morris County, New Jersey, an internal wireless telecommunications switching and regional office facility rather than a commercial colocation data center.
The EPA's facility registry lists U S Bank Coeur D'alene Data Center at 3700 Seltice Way, Coeur D'alene, ID 83814 in Coeur D'alene, Idaho, with an air permit.
The EPA's facility registry lists U S Bank Coeur D'alene Data Center at 3700 Seltice Way, Coeur D'alene, ID 83814 in Coeur D'alene, Idaho, with an air permit.
The EPA facility registry lists Vantage PH2 And Westhaven PH2 (FRS ID 110070892383) as a residential housing subdivision construction stormwater permit in Berthoud, Larimer County, Colorado, matched by the subdivision name Vantage rather than Vantage Data Centers.
The EPA facility registry lists Vantage PH2 And Westhaven PH2 (FRS ID 110070892383) as a residential housing subdivision construction stormwater permit in Berthoud, Larimer County, Colorado, matched by the subdivision name Vantage rather than Vantage Data Centers.
The EPA facility registry lists Verizon Wireless Data Center (FRS ID 110022513485) at 4323 Arrowswest Drive in Colorado Springs, El Paso County, Colorado, which is an internal telecommunications mobile switching center rather than a commercial colocation facility.
The EPA facility registry lists Verizon Wireless Data Center (FRS ID 110022513485) at 4323 Arrowswest Drive in Colorado Springs, El Paso County, Colorado, which is an internal telecommunications mobile switching center rather than a commercial colocation facility.
The EPA facility registry lists Verizon Wireless Shadelands at 2770 Shadelands Drive in Walnut Creek, Contra Costa County, California, an internal regional mobile telephone switching office rather than a commercial colocation data center.
The EPA facility registry lists Verizon Wireless Shadelands at 2770 Shadelands Drive in Walnut Creek, Contra Costa County, California, an internal regional mobile telephone switching office rather than a commercial colocation data center.
The EPA facility registry lists Ybor Data Center (FRS ID 110005600938) at 1898 Nuccio Parkway in Tampa, Hillsborough County, Florida, which is an internal telecommunications central office and network operations center rather than a commercial third party colocation facility.
The EPA facility registry lists Ybor Data Center (FRS ID 110005600938) at 1898 Nuccio Parkway in Tampa, Hillsborough County, Florida, which is an internal telecommunications central office and network operations center rather than a commercial third party colocation facility.
The EPA's facility registry lists Zayo Group, Montana State Data Center Miles City at N Of I-94 From Exit 138 7MI W, Miles City, MT 59301 in Miles City, Montana, with a water permit.
The EPA's facility registry lists Zayo Group, Montana State Data Center Miles City at N Of I-94 From Exit 138 7MI W, Miles City, MT 59301 in Miles City, Montana, with a water permit.
NScale's data center in Mason County, West Virginia received state certification after months of negotiations, and was among two Mason County projects hailed by Governor Morrisey.
NScale's data center in Mason County, West Virginia received state certification after months of negotiations, and was among two Mason County projects hailed by Governor Morrisey.
Oracle's Project Jupiter, proposed for Santa Teresa in Doña Ana County, is one of the largest proposed AI data center complexes in the nation and is stalled in permitting amid New Mexico Supreme Court stays on water and air quality permits and broad community opposition.
Oracle's Project Jupiter, proposed for Santa Teresa in Doña Ana County, is one of the largest proposed AI data center complexes in the nation and is stalled in permitting amid New Mexico Supreme Court stays on water and air quality permits and broad community opposition.
Applied Digital began construction of a 280MW data center in Harwood in September 2025, representing a 3 billion dollar investment; North Dakota Public Service Commission approved a temporary variance for the 110 million dollar power project serving the campus.
Applied Digital began construction of a 280MW data center in Harwood in September 2025, representing a 3 billion dollar investment; North Dakota Public Service Commission approved a temporary variance for the 110 million dollar power project serving the campus.
Applied Digital completed Phase 1 of Building 2 at Polaris Forge 1 near Ellendale, bringing total live campus capacity to 175MW, with 400MW contracted at full build out under an 11 billion dollar, 15 year agreement with CoreWeave.
Applied Digital completed Phase 1 of Building 2 at Polaris Forge 1 near Ellendale, bringing total live campus capacity to 175MW, with 400MW contracted at full build out under an 11 billion dollar, 15 year agreement with CoreWeave.
Quantica has proposed a large AI data center near Broadview spanning approximately 5,000 acres, with debates over water usage, natural gas power sourcing, and self funded energy capacity.
Quantica has proposed a large AI data center near Broadview spanning approximately 5,000 acres, with debates over water usage, natural gas power sourcing, and self funded energy capacity.
Alaska Industrial Development and Export Authority (AIDEA)
The Alaska Department of Natural Resources proposed a noncompetitive sale of over 31 square miles of state land north of Houston to AIDEA for a multi use industrial and energy development district that could include scalable data centers, a logistics hub, and utility corridors.
The Alaska Department of Natural Resources proposed a noncompetitive sale of over 31 square miles of state land north of Houston to AIDEA for a multi use industrial and energy development district that could include scalable data centers, a logistics hub, and utility corridors.
Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.
Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.
Prometheus Hyperscale proposed a 940 acre, gigawatt scale data center campus in Natrona County, Wyoming, requesting the county bypass state environmental review amid divided commissioner opinion.
Prometheus Hyperscale proposed a 940 acre, gigawatt scale data center campus in Natrona County, Wyoming, requesting the county bypass state environmental review amid divided commissioner opinion.
The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.
The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.
The EPA facility registry lists Emerson's internal corporate engineering and enterprise data center at 1704 South Governor Road in Marshalltown, Marshall County, Iowa.
The EPA facility registry lists Emerson's internal corporate engineering and enterprise data center at 1704 South Governor Road in Marshalltown, Marshall County, Iowa.
The EPA facility registry lists H.B. Fuller Company's internal corporate enterprise IT facility at 1275 Grey Fox Road in Arden Hills, Ramsey County, Minnesota.
The EPA facility registry lists IBM Annapolis Data Center at 2500 Riva Road in Annapolis, Anne Arundel County, Maryland, an internal aviation communications and corporate enterprise computing facility rather than a commercial colocation data center.
The EPA facility registry lists IBM Annapolis Data Center at 2500 Riva Road in Annapolis, Anne Arundel County, Maryland, an internal aviation communications and corporate enterprise computing facility rather than a commercial colocation data center.
The EPA facility registry lists Medtronic's internal corporate medical technology enterprise data center at 515 Bielenberg Drive in Woodbury, Washington County, Minnesota.
The EPA facility registry lists Medtronic's internal corporate medical technology enterprise data center at 515 Bielenberg Drive in Woodbury, Washington County, Minnesota.
The EPA's facility registry lists Wal- Mart Stores, INC., East Data Center at 805 Moberly Lane, Bentonville, AR 72712 in Bentonville, Arkansas, with air and water permits.
The EPA's facility registry lists Wal- Mart Stores, INC., East Data Center at 805 Moberly Lane, Bentonville, AR 72712 in Bentonville, Arkansas, with air and water permits.
An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center.
An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center.
A Lincoln data center prompted construction of a $10 million wastewater line to transport cooling water to a recovery site, with construction beginning in June 2026.
A Lincoln data center prompted construction of a $10 million wastewater line to transport cooling water to a recovery site, with construction beginning in June 2026.
Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.
Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.
A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote.
A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote.
A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option.
A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option.
SkyBox Data Center is proposed at the former Cox Ranch near Cheyenne, with developers presenting commitments at a Cheyenne City Council work session amid resident concerns.
SkyBox Data Center is proposed at the former Cox Ranch near Cheyenne, with developers presenting commitments at a Cheyenne City Council work session amid resident concerns.
A citizen group in Butte Silver Bow is pursuing a ballot initiative on data centers and has appealed a local judge's ruling to the Montana Supreme Court.
A citizen group in Butte Silver Bow is pursuing a ballot initiative on data centers and has appealed a local judge's ruling to the Montana Supreme Court.
A gas turbine yard at 2875 Stanton Road South in Southaven, DeSoto County, that powers xAI's Colossus 1 and Colossus 2 data centers across the state line in Memphis, recorded separately there.
A gas turbine yard at 2875 Stanton Road South in Southaven, DeSoto County, that powers xAI's Colossus 1 and Colossus 2 data centers across the state line in Memphis, recorded separately there. Its own record by decision of September 10, 2026. The turbine count is not yet filed in the fact grid; each figure lives on its dated event with its source and the alleged flag.
Monolith is proposing a data center expansion near Hallam, Nebraska, with landowners facing decisions about selling and residents attending a town hall to discuss the project.
Monolith is proposing a data center expansion near Hallam, Nebraska, with landowners facing decisions about selling and residents attending a town hall to discuss the project.
Amazon operates multiple data centers in Canton, Madison County, and is involved in a tax valuation dispute with the county while also planning a $25 billion expansion in Mississippi creating 2,000 jobs.
Amazon operates multiple data centers in Canton, Madison County, and is involved in a tax valuation dispute with the county while also planning a $25 billion expansion in Mississippi creating 2,000 jobs.
Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.
Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.
A data center plan in Clarksville includes 40 natural gas turbines and is associated with a multi billion dollar bond that a community group is petitioning to repeal.
A data center plan in Clarksville includes 40 natural gas turbines and is associated with a multi billion dollar bond that a community group is petitioning to repeal.
Delaware based DeepGreen Cook Inlet SPV LLC filed a FERC preliminary permit application for a 100 megawatt underwater AI data center campus in Cook Inlet west of Nikiski, powered by approximately 350 marine hydrokinetic tidal turbines across roughly 1,650 acres, with FERC identifying deficiencies in the application and state officials and environmental groups raising opposition.
Delaware based DeepGreen Cook Inlet SPV LLC filed a FERC preliminary permit application for a 100 megawatt underwater AI data center campus in Cook Inlet west of Nikiski, powered by approximately 350 marine hydrokinetic tidal turbines across roughly 1,650 acres, with FERC identifying deficiencies in the application and state officials and environmental groups raising opposition.
DeepGreen proposed an underwater AI data center off the coast of Eastport, scaled down to 15 MW and a 27.1 acre active infrastructure footprint with 16 turbines in Phase I, and filed a 48 month preliminary permit application with FERC in February 2026, though Eastport enacted a 180 day moratorium on the project in August 2026.
DeepGreen proposed an underwater AI data center off the coast of Eastport, scaled down to 15 MW and a 27.1 acre active infrastructure footprint with 16 turbines in Phase I, and filed a 48 month preliminary permit application with FERC in February 2026, though Eastport enacted a 180 day moratorium on the project in August 2026.
Google plans a data center in Putnam County, West Virginia and plans to source solar power for it through a partnership with MN8 and Eos Energy on a West Virginia solar and storage project.
Google plans a data center in Putnam County, West Virginia and plans to source solar power for it through a partnership with MN8 and Eos Energy on a West Virginia solar and storage project.
Greensparc proposed converting approximately 1,500 sq ft of the former Ocean Beauty Seafoods canning plant on the Petersburg waterfront into a small scale edge data center using the property's existing 2MW transformer and a closed loop cooling system.
Greensparc proposed converting approximately 1,500 sq ft of the former Ocean Beauty Seafoods canning plant on the Petersburg waterfront into a small scale edge data center using the property's existing 2MW transformer and a closed loop cooling system.
A data center proposed near Lake Hico in Jackson is under judicial scrutiny following a moratorium and controversy over city officials' discussions about the site.
A data center proposed near Lake Hico in Jackson is under judicial scrutiny following a moratorium and controversy over city officials' discussions about the site.
A developer proposed a data center at a former paper mill site in Jay, Maine, which cleared a legislative hurdle in April 2026 but was subsequently put on hold indefinitely after the company withdrew from the project in June 2026.
A developer proposed a data center at a former paper mill site in Jay, Maine, which cleared a legislative hurdle in April 2026 but was subsequently put on hold indefinitely after the company withdrew from the project in June 2026.
Krambu proposed a 29 MW data center in Bonner, Montana, but withdrew its application following public opposition, and the property owner also backed out.
Krambu proposed a 29 MW data center in Bonner, Montana, but withdrew its application following public opposition, and the property owner also backed out.
A data center project in Leola is undergoing permitting, with McPherson County postponing approval of a conditional use permit and state regulators and the county board set to decide its fate, while a potential settlement over powering the facility was reported.
A data center project in Leola is undergoing permitting, with McPherson County postponing approval of a conditional use permit and state regulators and the county board set to decide its fate, while a potential settlement over powering the facility was reported.
Lex Developments proposed a $2.6 billion AI data center in Pocatello; the city council upheld denial of the project and the developer filed a reconsideration request, accused the city of due process violations, and vowed to sue.
Lex Developments proposed a $2.6 billion AI data center in Pocatello; the city council upheld denial of the project and the developer filed a reconsideration request, accused the city of due process violations, and vowed to sue.
Residents sued and a judge halted the expansion of the Markley Group data center in a dense Lowell neighborhood, citing air quality and community impact concerns.
Residents sued and a judge halted the expansion of the Markley Group data center in a dense Lowell neighborhood, citing air quality and community impact concerns.
Meta's 715,000 square foot data center in Cheyenne was linked to rare bacteria contamination in the city's water system, traced to a contractor flushing contaminated water, prompting Wyoming to tighten wastewater rules.
Meta's 715,000 square foot data center in Cheyenne was linked to rare bacteria contamination in the city's water system, traced to a contractor flushing contaminated water, prompting Wyoming to tighten wastewater rules.
Cheyenne City Council approved Microsoft's 3,460 acre annexation for data center development after hours of public debate, with a subsequent referendum petition filed to reverse the vote.
Cheyenne City Council approved Microsoft's 3,460 acre annexation for data center development after hours of public debate, with a subsequent referendum petition filed to reverse the vote.
ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.
ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.
Patmos announced plans for a $150 million data center in Fairfield, Alabama, inside a former Walmart, with residents raising questions and hundreds attending a town hall.
Patmos announced plans for a $150 million data center in Fairfield, Alabama, inside a former Walmart, with residents raising questions and hundreds attending a town hall.
Google revealed it is the developer behind Project Clydesdale, a 506 acre data center campus being built in Tulsa County, Oklahoma, with plans to fund removal of 2,000 acres of trees for water conservation and partnering with Beale Infrastructure.
Google revealed it is the developer behind Project Clydesdale, a 506 acre data center campus being built in Tulsa County, Oklahoma, with plans to fund removal of 2,000 acres of trees for water conservation and partnering with Beale Infrastructure.
Southaven approved a new SpaceXAI data center, described as the fifth location in the area, and separately the operator shut off 11 temporary turbines that had been powering the Southaven facility.
Southaven approved a new SpaceXAI data center, described as the fifth location in the area, and separately the operator shut off 11 temporary turbines that had been powering the Southaven facility.
Stak Energy proposed a $500 million data center campus on approximately 715.4 acres off the Dalton Highway 25-26 miles south of Deadhorse on Alaska's North Slope, with up to 3 gigawatts of power capacity from natural gas generation, targeting initial operations by late 2028.
Stak Energy proposed a $500 million data center campus on approximately 715.4 acres off the Dalton Highway 25-26 miles south of Deadhorse on Alaska's North Slope, with up to 3 gigawatts of power capacity from natural gas generation, targeting initial operations by late 2028.
Starwood Digital Ventures announced a second certified data center for Mason County, to be located in West Columbia, representing a new $12 billion project hailed by Governor Morrisey.
Starwood Digital Ventures announced a second certified data center for Mason County, to be located in West Columbia, representing a new $12 billion project hailed by Governor Morrisey.
Terra Energy Center Corporation (TECC) / Flatlands Energy / Alaska Asia Clean Energy Corporation
TECC proposes a 1.25 GW coal fired power plant on approximately 1,000 acres near Lake Lorraine at Point MacKenzie to serve large power consumers including data centers, with Mat Su Borough Assembly authorizing a two year joint marketing partnership with TECC.
TECC proposes a 1.25 GW coal fired power plant on approximately 1,000 acres near Lake Lorraine at Point MacKenzie to serve large power consumers including data centers, with Mat Su Borough Assembly authorizing a two year joint marketing partnership with TECC.
Vantage held a community open house for a proposed data center south of Cheyenne, and commissioners subsequently approved a zone change for the facility.
Vantage held a community open house for a proposed data center south of Cheyenne, and commissioners subsequently approved a zone change for the facility.
A data center company eyeing Yellowstone County had top employees make matching political donations before announcing plans, while residents are demanding a vote on a moratorium as the county takes no action.
A data center company eyeing Yellowstone County had top employees make matching political donations before announcing plans, while residents are demanding a vote on a moratorium as the county takes no action.
A blank scale cell means the record holds no disclosed figure. Figures are shown as the source stated them, with the basis under each.
Showing 1 to 50 of 1,017
Sources and data
Cite this page
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Every project. Last verified October 28, 2026. https://datacenterrecord.org/projects. Accessed October 30, 2026.
Use this data in your work
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Reporters, researchers and nonprofits: free to use and republish with attribution under CC BY-NC 4.0. If you are working on a story or a study and want the full state or national file, ask and we will send it.
Utilities, law firms, lenders, consultants and AI teams: commercial use, bulk feeds and API access require a commercial license. Revenue from commercial licenses pays for the public record so it stays free for residents and local governments.
States, counties and cities: a public agency can use the record free, link to it, or contact us for an embed or feed of the records in its jurisdiction. Agencies that keep their own permit tracker can send us their rows and we will link each one to the primary document and keep the history. Contact us.
Request data or a license
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Keep the record open
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.