Courtney Lee, senior manager for state and local policy, Amazon Web Services
Amazon representative said company runs diesel generators about 12 hours per year for testing and maintenance
Amazon operates data centers in Morrow County, Oregon that went online beginning in 2011 and have been linked to nitrate groundwater contamination and a cluster of rare health conditions in the surrounding community. It is reported, since March 31, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Amazon | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
(source date; the content gives no date of its own)
Amazon data center project is proceeding in the Boardman area with Oregon Department of Environmental Quality opening public comment period for air quality permit [4]
· In court (content date)
Settlement motion filed in U.S. District Court for the District of Oregon, Pendleton Division [1]
The full Amazon Eastern Oregon Data Centers timeline, in order
· the capacity mw of a projects row
The capacity carried no source url. It came from the state batch extraction of 2026-09-04, which read two entries that are still draft and never approved ("would require a gigawatt of electricity", "consuming up to 1 gigawatt of power"); no published source on the record states it, so the field reads Not disclosed until one does (the editor's word of 2026-10-06). The old and new text.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the effective at of a status history row
Dated from its source: hbsslaw.com (its own cited source) answers 403 and could not be read directly; independent reporting on the same settlement (oregoncapitalchronicle.com/2026/03/31/..., KOIN, The Food and Environment Reporting Network) agrees the motion was filed March 31, 2026. The old and new text.
Every correction on the record is on the corrections page.
Jim Doherty, former Morrow County Commissioner, said opposition to data centers is a unifying moment between rural and urban Oregon
Amazon representative said Amazon data center uses less water than local agriculture industry
Every statement about data centers in Oregon, by speaker
Courtney Lee, senior manager for state and local policy, Amazon Web Services
Amazon representative said company runs diesel generators about 12 hours per year for testing and maintenance
Chair, Morrow County Board of Commissioners
David Sykes, chair of the Morrow County Board of Commissioners, said decisions over data centers on private property are up to local government
Where in Morrow County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Amazon is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is reported, since March 31, 2026. The newest entry, reported September 10, 2026: Amazon data center project is proceeding in the Boardman area with Oregon Department of Environmental Quality opening public comment period for air quality permit [4].
No decision by Boardman or Morrow County about data centers is on the record. The Morrow County page and the Oregon scorecard list every rated row the day a person publishes one.
7 sources on file.
Data Center Record, "Amazon Eastern Oregon Data Centers", https://datacenterrecord.org/projects/amazon-eastern-oregon-data-centers-morrow-or, last verified September 17, 2026.
Data Center Record, "Amazon Eastern Oregon Data Centers", https://datacenterrecord.org/projects/amazon-eastern-oregon-data-centers-morrow-or. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.