Census GEOID: 41067 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 primary and 1 reporting sources

● Running First recorded September 14, 2026 · 1 Building

Aligned PDX-01

Street address 20905 NW Amberwood Dr, Hillsboro, OR 97124, Washington County verified address Exact, at the address [2] Aligned Data Centers: Aligned PDX-01

Overview, regulatory gates and specifications

Aligned Data Centers lists a data center at Hillsboro, Oregon among the sites it operates. [1] Filings on the record specify disclosed capacity of 72 MW (the developer's figure), 1 planned or operational building. [2] Aligned Data Centers lists Aligned PDX-01 at Hillsboro, Oregon on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
43 generators permitted
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
72 MW
the developer's figure

Equivalent to ~59,760 U.S. homes (U.S. EIA 830 homes/MW baseline) · 3.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 20905 NW Amberwood Dr, Hillsboro, OR 97124.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
72 MW developer figure Equivalent to the continuous electricity demand of about 59,800 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.7 percent of New York City's summer peak demand in 2024.
[2] aligneddc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] aligneddc.com
Backup generators
43 generators (127 MW) permitted
[3] deqonline.deq.state.or.us
Capital investment
Not disclosed
Commissioned
Operational since 2024 (2 years)
Who leads it
Aligned Data Centers as stated by the source
Permitted legal entity
Aligned Data Centers (PDX) PropCo, LLC what a permit allows
[3] deqonline.deq.state.or.us [2] aligneddc.com
State air permit registration
34-0336, 34-0336-ST-01 state air permit register
[3] deqonline.deq.state.or.us
Official project website
aligneddc.com (opens in a new tab) verified October 28, 2026
aligneddc.com (opens in a new tab)
Archived promotional websites
aligneddc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Aligned PDX-01, capacity: 72 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 72 ÷ 10,245 = 0.007 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Aligned Data Centers · Applicant / Shell LLC: Aligned Data Centers (PDX) PropCo, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Aligned PDX-01.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 72 MW 72 MW the developer's figure [2] aligneddc.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] aligneddc.com
Cooling & Water System
Backup Diesel / Gas Generators 43 units (127 MW) what a permit allows [3] deqonline.deq.state.or.us
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
July 27, 2026 Hillsboro, OR Hillsboro City Council Special Meeting on Data Center Moratorium Hillsboro City Council 3 clips

Hillsboro City Council convened a special meeting to consider a temporary municipal land use moratorium on new data center and battery energy storage permits while staff updates the Hillsboro Community Development Code.

  1. Hillsboro City Planning Staff Board & Planning Staff transcribed from the official recording
    "in order to then have that hearing. So the state needs 45 days notice. Today is day 46. We did this on purpose because when the governor instituted an a moratorium on enterprise zones, she left time between the time she said we were going to have a moratorum and by the and then when the moratorum was enacted and"
  2. Hillsboro City Planning Staff Board & Planning Staff transcribed from the official recording
    "facilities while drafting potential updates to Hillsboro Community Development Code and to define where to define where and how these facilities operate. The moratorium we will consider today is different, very different and separate from the state's temporary moratorium on enterprise zone agreements. And that's what I was alluding to earlier when I was speaking. That legislation on enterprise zones"
  3. Hillsboro City Council Member Elected Official transcribed from the official recording
    "so welcome to the city council special meeting. and I wanted to explain why we're here today. And I want to explain why we're here today and why it was a special meeting on a Monday at 9:00 a.m. So we were briefed in executive session on legal implications on doing a moratorum. And in that session we learned one of"
2019 to 2024 hearings
March 7, 2023 Hillsboro, OR March 7. 2023: Hillsboro City Council Meeting Hillsboro City Council 1 clip

Hillsboro City Council meeting and Enterprise Zone record on property tax abatements and semiconductor and hyperscale data center industrial zoning (March 7, 2023).

  1. Hillsboro Economic Development and Planning Staff Municipal / Agency Staff transcribed from the official recording
    "In the North Hillsboro Industrial Renewal Area and Enterprise Zone, data center investments have driven significant assessed value growth, while requiring coordinated planning with Portland General Electric and Joint Water Commission supply."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Hillsboro Economic Development and Enterprise Zone Sponsors Hillsboro Enterprise Zone Program Officials
Venue: Hillsboro City Council Enterprise Zone Abatement Proceedings
"Hillsboro Enterprise Zone three to five year property tax abatements attract premier hyperscale data center investment into the Silicon Forest industrial corridor while strengthening our local tax base and utility infrastructure."
City of Hillsboro Oregon
Column B · Subsequent Recorded Position
Hillsboro City Council Ordinance No. 6525 (9 to 0 Vote Enacting 180 Day Emergency Data Center Moratorium)
Hillsboro City Council Ordinance No. 6525 · March 3, 2026 Unanimous Vote
Agency or Venue: Hillsboro City Council
"On March 3, 2026, the Hillsboro City Council voted 9 to 0 to enact a 180 day emergency moratorium on new data centers after city planners documented that hyperscale facilities consumed rampant electricity and industrial land needed for high employment semiconductor manufacturing while generating minimal permanent jobs."
Column A · Dated Statement
Port of Morrow and Columbia River Enterprise Zone Officials Port of Morrow and Enterprise Zone Board Representatives
Venue: Columbia River and Umatilla Enterprise Zone Tax Abatement Approvals
"Enterprise Zone property tax abatements for Amazon Web Services data centers in Morrow and Umatilla Counties drive regional prosperity while industrial cooling water is safely recycled through port wastewater land application systems."
Column B · Primary Government Record
Oregon DEQ Mutual Agreement and Order (Port of Morrow Wastewater Violations) and 2026 Umatilla Data Center Pause
Oregon DEQ Enforcement Penalties (WQ/IWR ER-2022-2024) · Umatilla 2026 Permitting Moratorium
Agency or Venue: Oregon Department of Environmental Quality (DEQ) and City of Umatilla
"Oregon DEQ levied over $2.4 million in repeated environmental fines against the Port of Morrow for dumping hundreds of millions of gallons of nitrogen laden industrial and data center wastewater onto fields above the contaminated Lower Umatilla Basin aquifer, followed by a 2026 municipal permitting pause in Umatilla."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Aligned Data Centers lists Aligned PDX-01 at Hillsboro, Oregon on its own page of data center locations, read September 14, 2026.

    [2] aligneddc.com

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
NTT Global Data Centers Hillsboro Campus (HI1 / HI2 / HI3) Hillsboro, Washington County Less than 1 mi Running NTT Global Data Centers 126 MW
Digital Realty Hillsboro Campus (PDX10 / PDX11 / PDX12) Hillsboro, Washington County Less than 1 mi Running Digital Realty 54 MW
Flexential Hillsboro 1 (PDX01 Brookwood) Hillsboro, Washington County Less than 1 mi Running Flexential 3.6 MW
Infomart Portland (Cascadia Hillsboro Campus) Hillsboro, Washington County Less than 1 mi Running STACK Infrastructure 24 MW
STACK Infrastructure Hillsboro Campus (POR01 / POR02 / POR03) Hillsboro, Washington County Less than 1 mi Running STACK Infrastructure 84 MW
EdgeConneX Portland (POR01 / POR02 Hillsboro) Hillsboro, Washington County 1 mi Running EdgeConneX 30 MW

Blank cell: not disclosed by any source on file.

Common questions about Aligned PDX-01

Answered directly from the verified filings and local actions on this page.

Who is building Aligned PDX-01?

Aligned Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Aligned PDX-01 say it needs?

Power: 72 MW (the developer's figure, aligneddc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Aligned PDX-01 stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Aligned Data Centers: Data center locations (opens in a new tab), Aligned Data Centers, September 14, 2026
  2. Aligned Data Centers: Aligned PDX-01 (opens in a new tab), Aligned Data Centers, September 14, 2026
  3. Oregon DEQ Standard ACDP (OAR 340-216) 34-0336-ST-01 (Aligned Data Centers (PDX) PropCo, LLC - Aligned Data Centers PDX01) (opens in a new tab), Oregon Department of Environmental Quality, July 24, 2024
  4. Oregon DEQ Permit Review Report 34-0336-ST-01 (Aligned Data Centers (PDX) PropCo, LLC - Aligned Data Centers PDX01) (opens in a new tab), Oregon Department of Environmental Quality, July 24, 2024

Reporting

  1. Paradise paved: In Oregon suburb, data center boom spurs protests, lawsuit - Courthouse News (opens in a new tab), Courthouse News, July 25, 2026, national outlet

5 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Aligned PDX-01", https://datacenterrecord.org/projects/aligned-pdx-01-hillsboro-or, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Aligned PDX-01", https://datacenterrecord.org/projects/aligned-pdx-01-hillsboro-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
45.5418, -122.8884
How the location is known
Location from the site's street address.
Location source
https://aligneddc.com/hillsboro-data-centers/
Coordinate source
Aligned Data Centers PDX-01 Hillsboro campus specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
72 MW, the developer's figure
Published
September 14, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Aligned PDX-01 · 5 sources, 1 entry · basis and source tier on every row · verified October 26, 2026

Download CSV JSON