726 projects across 50 states, 36.5 GW of disclosed capacity. Each record is sourced and dated. Most recently verified first. Listed apart from the count: 108 sites not yet verified.

  • running Edged Mesa data center

    Edged operates its 36 MW Edged Phoenix (PHX01) data center at 8927 E Ray Rd in Mesa, Maricopa County, Arizona, using a waterless closed loop cooling system.

    Mesa, Maricopa County, AZ · 36 MW · Last verified October 26, 2026

  • being built Meta Eagle Mountain Data Center

    Meta operates and expands a 5 building, 2.4 million square foot hyperscale data center campus through subsidiary Stadler Pahvant LLC at 2000 N. Pony Express Parkway in Eagle Mountain, Utah County, Utah.

    Eagle Mountain, Utah County, UT · Capacity not disclosed · Last verified October 26, 2026

  • running Vantage Phoenix (Goodyear AZ1)

    Vantage Data Centers lists a data center at Phoenix, Arizona among the sites it operates.

    Goodyear, Maricopa County, AZ · 160 MW · Last verified October 26, 2026

  • running Aligned CMH-02

    Aligned Data Centers lists a data center at Conesville, Ohio among the sites it operates.

    Conesville, Coshocton County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Aligned Data Centers Chandler

    Aligned Data Centers lists 2 data centers at Chandler, Arizona among the sites it operates.

    Chandler, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Aligned Data Centers Phoenix

    Aligned Data Centers lists 2 data centers at Phoenix, Arizona among the sites it operates.

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Aligned NEO-01

    Aligned Data Centers lists a data center at Sandusky, Ohio among the sites it operates.

    Sandusky, Erie County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Aligned PHX-07

    Aligned Data Centers operates its PHX-07 campus at 14522 W Olive Ave in Waddell, Maricopa County, Arizona (EPA FRS ID 110072218617).

    Waddell, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Apple Mesa data center

    Apple operates its global command and data center campus at 3740 S Signal Butte Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110072222421 and 110062853416).

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Ark Data Centers (Akron, OH)

    Ark Data Centers operates a commercial colocation data center at 191 E. Miller Ave. in Akron, Summit County, Ohio (EPA FRS ID 110071941749, Ohio EPA Air ID OH0000001677011602).

    Akron, Summit County, OH · Capacity not disclosed · Last verified October 25, 2026

  • approved Ashville data center project

    The Village of Ashville approved annexation and zoning ordinances for a proposed data center campus in Pickaway County, Ohio; in August 2026, the Supreme Court of Ohio ruled that a citizen referendum on the ordinances could proceed.

    Ashville, Pickaway County, OH · Capacity not disclosed · Last verified October 25, 2026

  • not yet verified Blue Ash Data Center

    The EPA's facility registry lists Blue Ash Data Center at 11515 Grooms RD, Cincinnati, OH 45242 in Cincinnati, Ohio, with a hazardous waste record.

    Cincinnati, Hamilton County, OH · Capacity not disclosed · Last verified October 25, 2026

  • not yet verified Cellco, Dublin 1, RHQ And Data Center

    The EPA's facility registry lists Cellco, Dublin 1, RHQ And Data Center at 5175 Emerald Parkway, Dublin, OH 43017 in Dublin, Ohio, with a water permit.

    Dublin, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Centersquare Columbus data center

    Centersquare lists a data center at Columbus, Ohio among the sites it operates.

    Lewis Center, Delaware County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Centersquare Phoenix data center

    Centersquare lists a data center at Phoenix, Arizona among the sites it operates.

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • not yet verified Citi Midwest Data Center

    The EPA's facility registry lists Citi Midwest Data Center at 310 Greif Pkwy, Delaware, OH 43015 in Delaware, Ohio, with an air permit.

    Delaware, Delaware County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Cologix Columbus

    Cologix lists 7 data centers at Columbus, Ohio among the sites it operates.

    Columbus, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Compass El Mirage campus

    Compass Datacenters lists a data center at El Mirage, Arizona among the sites it operates.

    El Mirage, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Compass Goodyear campus

    Compass Datacenters lists a data center at Goodyear, Arizona among the sites it operates.

    Goodyear, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running CyrusOne Chandler PHX1-PHX8

    CyrusOne operates its Chandler data center campus (PHX1 through PHX8) at 2335 S Ellis St in Chandler, Maricopa County, Arizona (EPA FRS ID 110066858323).

    Chandler, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running CyrusOne Cincinnati CIN2

    CyrusOne lists a data center at Cincinnati, Ohio among the sites it operates.

    Cincinnati, Hamilton County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running CyrusOne Lebanon CIN5

    CyrusOne lists a data center at Lebanon, Ohio among the sites it operates.

    Lebanon, Warren County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running DataBank Cleveland data center

    DataBank lists a data center at Cleveland, Ohio among the sites it operates.

    Cleveland, Cuyahoga County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running DataBank Phoenix - PHX1

    DataBank operates its PHX1 downtown Phoenix colocation data center at 3110 N Central Ave in Phoenix, Maricopa County, Arizona.

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Digital Realty Phoenix

    Digital Realty lists 2 data centers at Phoenix, Arizona among the sites it operates.

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Digital Realty PHX15

    Digital Realty lists a data center at Chandler, Arizona among the sites it operates.

    Chandler, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running EdgeConneX Phoenix (EDCPHX01)

    EdgeConneX operates its PHX01 edge colocation data center at 3011 S 52nd St in Tempe, Maricopa County, Arizona.

    Tempe, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running EdgeConneX Mesa data center campus

    EdgeConneX operates its two building Mesa hyperscale data center campus (PHX02 and PHX03) at 3261 S Hawes Rd in Mesa, Maricopa County, Arizona (EPA FRS IDs 110071988389 and 110071815477).

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • waiting on permits EdgeCore Mesa North Campus

    EdgeCore's Mesa North Campus in Mesa, Arizona, resized and approved by the city in March 2026.

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Edged New Albany data center

    Edged operates its 24 MW, 206,000 square foot Edged Columbus (CMH01) data center at 6526 New Albany Road East in New Albany, Franklin County, Ohio, commissioned in September 2025 with a waterless closed loop cooling system.

    New Albany, Franklin County, OH · 24 MW · Last verified October 25, 2026

  • running Encore Technologies Data Center

    Encore Technologies operates a commercial colocation and cloud data center at 9333 Springboro Pike in Miamisburg, Montgomery County, Ohio (EPA FRS ID 110072072132, Ohio EPA Air ID OH0000000857095002).

    Miamisburg, Montgomery County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Expedient Cleveland

    Expedient operates its two building Cleveland colocation campus at 15166 NEO Parkway in Cleveland, Cuyahoga County, Ohio.

    Cleveland, Cuyahoga County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Expedient Columbus - Dublin

    Expedient operates a commercial cloud and colocation data center at 5700 Innovation Drive in Dublin, Franklin County, Ohio.

    Dublin, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Expedient Columbus - Upper Arlington

    Expedient operates a commercial colocation data center at 5000 Arlington Centre Blvd in Upper Arlington, Franklin County, Ohio.

    Upper Arlington, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Flexential Cincinnati - CIN01/02

    Flexential operates its two building Cincinnati colocation campus (CIN01 and CIN02) at 5307 Muhlhauser Road in West Chester, Butler County, Ohio.

    West Chester, Butler County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Flexential Phoenix - PHX01

    Flexential operates its PHX01 colocation data center at 1850 W Deer Valley Rd in Phoenix, Maricopa County, Arizona.

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Google Columbus data center

    Google lists a data center at Columbus, Ohio among the sites it operates.

    Columbus, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Google Lancaster data center

    Google lists a data center at Lancaster, Ohio among the sites it operates.

    Lancaster, Fairfield County, OH · Capacity not disclosed · Last verified October 25, 2026

  • being built Google Mesa data center

    Google described a recently announced data center in Mesa, Arizona in a December 2023 blog post and said it chose air cooling after finding the local water source at high risk of scarcity and depletion.

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Google New Albany data center

    Google lists a data center at New Albany, Ohio among the sites it operates.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running H5 Cleveland

    H5 Data Centers lists a data center at Cleveland, Ohio among the sites it operates.

    Cleveland, Cuyahoga County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running H5 Data Centers Cincinnati

    H5 Data Centers lists 2 data centers at Cincinnati, Ohio among the sites it operates.

    Cincinnati, Hamilton County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running H5 Phoenix

    H5 Data Centers lists a data center at Phoenix, Arizona among the sites it operates.

    Chandler, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Iron Mountain Data Center

    Iron Mountain Data Centers operates its three building Phoenix colocation campus (AZP-1, AZP-2, and AZP-3) at 615 N 48th St and 5100 E Roosevelt St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110023013736 and 110071725518).

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Iron Mountain Data Center Ohio (OHS-1)

    Iron Mountain Data Centers operates its OHS-1 colocation facility at 3366 S Tech Blvd in Miamisburg, Montgomery County, Ohio.

    Miamisburg, Montgomery County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Iron Mountain Data Center Scottsdale (AZS-1)

    Iron Mountain Data Centers operates its AZS-1 colocation facility at 8521 E Princess Drive in Scottsdale, Maricopa County, Arizona.

    Scottsdale, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Meta Bowling Green Data Center

    Meta lists a data center at Bowling Green, Ohio among the sites it operates.

    Bowling Green, Wood County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Meta New Albany Data Center

    Meta lists a data center at New Albany, Ohio among the sites it operates.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Meta Mesa Data Center

    Meta operates its five building Mesa Data Center campus at the southeast corner of E Elliot Rd and S Ellsworth Rd in Mesa, Maricopa County, Arizona (EPA FRS ID 110071640426).

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Microsoft Goodyear data center campus

    Microsoft operates its three building Goodyear hyperscale data center campus at 3785 N Citrus Rd and W McDowell Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071395846).

    Goodyear, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Microsoft Heath datacenter

    Microsoft lists a data center at Heath, Ohio among the sites it operates.

    Heath, Licking County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Microsoft Hebron datacenter

    Microsoft lists a data center at Hebron, Ohio among the sites it operates.

    Hebron, Licking County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Microsoft New Albany datacenter

    Microsoft lists a data center at New Albany, Ohio among the sites it operates.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Microsoft El Mirage data center campus

    Microsoft operates its two building El Mirage data center campus at 12901 W Olive Ave in El Mirage, Maricopa County, Arizona (EPA FRS ID 110071395844).

    El Mirage, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Novva Mesa data center

    Novva Data Centers lists a data center at Mesa, Arizona among the sites it operates.

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running NTT Global Data Centers Garland (TX1)

    NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).

    Garland, Dallas County, TX · Capacity not disclosed · Last verified October 25, 2026

  • running NTT Mesa data center campus

    A planned NTT Global Data Centers campus off State Route 24 in Mesa, Arizona, on a 173 acre site the company bought in 2025.

    Mesa, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Oracle Phoenix cloud region

    Oracle lists a data center at Phoenix, Arizona among the sites it operates.

    Chandler, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running phoenixNAP

    phoenixNAP operates its flagship commercial colocation and cloud interconnection data center at 3402 E University Dr in Phoenix, Maricopa County, Arizona.

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • being built PORTS-Pike Technology Campus

    SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio.

    Piketon, Pike County, OH · Capacity not disclosed · Last verified October 25, 2026

  • approved Project Baccara

    Project Baccara, a data center campus proposed by Takanock on about 160 acres of unincorporated Maricopa County near Surprise, Arizona.

    Surprise, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • being built QTS Data Centers New Albany

    QTS Data Centers lists 2 data centers at New Albany, Ohio and says they are being built.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running QTS Phoenix 1 & 2

    QTS operates its two building Phoenix 1 and Phoenix 2 data center campus at 1200 N 40th St in Phoenix, Maricopa County, Arizona (EPA FRS IDs 110071274775 and 110071406372).

    Phoenix, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • being built QTS Phoenix 3

    QTS is developing its five building Phoenix 3 (Glendale) hyperscale data center campus along W Camelback Rd near Loop 303 in Glendale, Maricopa County, Arizona (EPA FRS IDs 110071731384 and 110071275109).

    Glendale, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • being built QTS Phoenix 4

    QTS is developing its two building Phoenix 4 data center campus at McDowell Rd and 111th Ave in Avondale, Maricopa County, Arizona.

    Avondale, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • being built QTS Van Wert

    QTS Data Centers lists a data center at Van Wert, Ohio and says it is being built.

    Van Wert, Van Wert County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running STACK NAL01

    STACK Infrastructure lists a data center at New Albany, Ohio among the sites it operates.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running STACK PHX01

    STACK Infrastructure lists a data center at Avondale, Arizona among the sites it operates.

    Avondale, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running Stream Data Center PHX-01

    Stream Data Centers operates its three building Phoenix Goodyear (PHX I) hyperscale campus at 2950 S Litchfield Rd in Goodyear, Maricopa County, Arizona (EPA FRS ID 110071546724).

    Goodyear, Maricopa County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running T5@Cleveland

    T5 Data Centers operates the T5@Cleveland colocation data center at 4150 W 150th Street in Cleveland, Cuyahoga County, Ohio.

    Cleveland, Cuyahoga County, OH · Capacity not disclosed · Last verified October 25, 2026

  • proposed Trenton data center

    Prologis proposed a data center campus in Trenton, Butler County, Ohio; on September 1, 2026, the Supreme Court of Ohio ordered the Trenton City Council to place a charter amendment referendum on a special election ballot.

    Trenton, Butler County, OH · Capacity not disclosed · Last verified October 25, 2026

  • running Vantage New Albany

    Vantage Data Centers lists a data center at New Albany, Ohio among the sites it operates.

    New Albany, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • not yet verified Verizon North INC, Norwalk Data Center

    The EPA's facility registry lists Verizon North INC, Norwalk Data Center at 14 Gibbs RD, Norwalk, OH 44857 in Norwalk, Ohio, with no permit program listed.

    Norwalk, Huron County, OH · Capacity not disclosed · Last verified October 25, 2026

  • not yet verified Verizon Wireless, Data Center Dublin II

    The EPA's facility registry lists Verizon Wireless, Data Center Dublin II at 5165 Emerald Pkwy, Dublin, OH 43017 in Dublin, Ohio, with no permit program listed.

    Dublin, Franklin County, OH · Capacity not disclosed · Last verified October 25, 2026

  • cancelled Vermaland data center

    Vermaland proposed an 11 building data center campus near Eloy in Pinal County, Arizona; the Pinal County Board of Supervisors voted 4 to 1 to reject the rezoning application.

    Eloy, Pinal County, AZ · Capacity not disclosed · Last verified October 25, 2026

  • running 365 Data Centers Reston (Flex Data Center)

    365 Data Centers operates the Reston colocation facility at 11513 Sunset Hills Road in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433709).

    Reston, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Aligned Data Centers Ashburn

    Aligned Data Centers lists 2 data centers at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Aligned Data Centers Plano

    Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates.

    Plano, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Aligned IAD-03

    Aligned Data Centers lists a data center at Sterling, Virginia among the sites it operates.

    Sterling, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Aligned LBB-01

    Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates.

    Abernathy, Hale County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Amazon Data Services, DCA-51

    The EPA's facility registry lists Amazon Data Services, DCA-51 at 7471 Bear Wallow RD, Warrenton, VA 20186 in Warrenton, Virginia, with air and water permits.

    Warrenton, Fauquier County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Amazon Data Services, INC. IAD-1 IAD-9

    The EPA's facility registry lists Amazon Data Services, INC. IAD-1 IAD-9 at 4101 A West Fax Drive, Chantilly, VA 20151 in Chantilly, Virginia, with an air permit.

    Chantilly, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Amazon Data Services, INC. IAD-55 IAD-64 IAD-84

    The EPA's facility registry lists Amazon Data Services, INC. IAD-55 IAD-64 IAD-84 at 15395 John Marshall Hwy, Haymarket, VA 20169 in Haymarket, Virginia, with an air permit.

    Haymarket, Prince William County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Amazon Data Services, Northeast Creek Tech Campus

    The EPA's facility registry lists Amazon Data Services, Northeast Creek Tech Campus at Jefferson Hwy US Route 33, Louisa, VA 23093 in Louisa, Virginia, with a water permit.

    Louisa, Louisa County, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Anthem CDC 3

    The EPA's facility registry lists Anthem CDC 3 at 139 Tyco Street, Harrisonburg, VA 22802 in Harrisonburg, Virginia, with an air permit.

    Harrisonburg, Harrisonburg city, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Carmel Church Data Center

    The EPA's facility registry lists Carmel Church Data Center at Welcome Way DR, Caroline, VA 22546 in Caroline, Virginia, with a water permit.

    Ruther Glen, Caroline County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Centersquare Dallas data center

    Centersquare lists a data center at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Centersquare Fort Worth data center

    Centersquare lists a data center at Fort Worth, Texas among the sites it operates.

    Fort Worth, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CloudHQ Manassas Campus (MCC1)

    CloudHQ operates the Manassas Corporate Center (MCC1) data center campus at 10880 Airman Avenue in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070049664).

    Manassas, Prince William County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Cologix Ashburn

    Cologix lists 2 data centers at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Cologix Dallas

    Cologix lists 3 data centers at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Compass Loudoun County campus

    Compass Datacenters lists a data center at Loudoun County, Virginia among the sites it operates.

    Leesburg, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running CoreSite Reston Campus (VA3)

    CoreSite operates the Reston Campus (VA3) data center at 12369 Sunrise Valley Drive in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070361655).

    Reston, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Allen DFW3-DFW5

    CyrusOne lists a data center at Allen, Texas among the sites it operates.

    Allen, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Austin AUS2-AUS3

    CyrusOne lists a data center at Austin, Texas among the sites it operates.

    Austin, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Carrollton DFW1

    CyrusOne lists a data center at Carrollton, Texas among the sites it operates.

    Carrollton, Denton County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Cyrusone Freestone Campus

    The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit.

    Fairfield, Freestone County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Houston HOU3-HOU4

    CyrusOne lists a data center at Houston, Texas among the sites it operates.

    Houston, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Lewisville DFW2

    CyrusOne lists a data center at Lewisville, Texas among the sites it operates.

    Lewisville, Denton County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne San Antonio

    CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates.

    San Antonio, Bexar County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running CyrusOne Sterling

    CyrusOne lists 5 data centers at Sterling, Virginia among the sites it operates.

    Sterling, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Data Center Vint Hill LLC

    The EPA's facility registry lists Data Center Vint Hill LLC at 6872 Watson Court, Warrenton, VA 20186 in Warrenton, Virginia, with an air permit.

    Warrenton, Fauquier County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running DataBank Austin data center

    DataBank lists a data center at Austin, Texas among the sites it operates.

    Austin, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running DataBank Dallas data center

    DataBank lists a data center at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running DataBank Houston data center

    DataBank lists a data center at Houston, Texas among the sites it operates.

    Houston, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running DataBank Plano DFW3

    DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).

    Plano, Collin County, TX · 9 MW · Last verified October 24, 2026

  • running DataBank Red Oak Campus

    DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).

    Red Oak, Ellis County, TX · 480 MW · Last verified October 24, 2026

  • running DataBank Waco data center

    DataBank lists a data center at Waco, Texas among the sites it operates.

    Waco, McLennan County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Ashburn

    Digital Realty lists 13 data centers at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Austin

    Digital Realty lists 2 data centers at Austin, Texas among the sites it operates.

    Austin, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Carrollton

    Digital Realty lists 2 data centers at Carrollton, Texas among the sites it operates.

    Carrollton, Denton County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Dallas

    Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty DFW26

    Digital Realty lists a data center at Lewisville, Texas among the sites it operates.

    Lewisville, Denton County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Houston

    Digital Realty lists 2 data centers at Houston, Texas among the sites it operates.

    Houston, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty Richardson

    Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates.

    Richardson, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Digital Realty VA3

    Digital Realty lists a data center at Reston, Virginia among the sites it operates.

    Reston, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Edge Connex Data Center

    The EPA's facility registry lists Edge Connex Data Center at 3800 Village Ave, Norfolk, VA 00000 in Norfolk, Virginia, with an air permit.

    Norfolk, Norfolk city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Edgeconnex Houston Holdings, LLC

    The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.

    Katy, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Edgeconnex Richmond Holdings LLC

    The EPA's facility registry lists Edgeconnex Richmond Holdings LLC at 1450 East Parham Road, Richmond, VA 23228 in Richmond, Virginia, with a hazardous waste record.

    Henrico County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Edged Irving Data Center

    Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system.

    Irving, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Element Critical Austin (AUS1)

    Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).

    Austin, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Energy Control And Data Center

    The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.

    Houston, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix Ashburn

    Equinix lists 14 data centers at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix Culpeper

    Equinix lists 4 data centers at Culpeper, Virginia among the sites it operates.

    Culpeper, Culpeper County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix DA7

    Equinix lists a data center at Plano, Texas among the sites it operates.

    Plano, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix DA9

    Equinix lists a data center at Irving, Texas among the sites it operates.

    Irving, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix Dallas

    Equinix lists 6 data centers at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix DC14

    Equinix lists a data center at Manassas, Virginia among the sites it operates.

    Manassas, Manassas city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix HO1

    Equinix lists a data center at Houston, Texas among the sites it operates.

    Houston, Harris County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix DC7 Vienna

    Equinix operates the DC7 data center at 7990 Science Applications Court in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110020674858).

    Vienna, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix DC8 Vienna

    Equinix operates the DC8 data center at 8502A Tyco Road in Vienna, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043433692).

    Vienna, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Equinix, LLC, DC 97

    The EPA's facility registry lists Equinix, LLC, DC 97 at 460 Spring Park PL, Herndon, VA 20170 in Herndon, Virginia, with an air permit.

    Herndon, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running EvoSwitch WDC1 Manassas

    EvoSwitch operates the WDC1 data center at 9651 Hornbaker Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110038456140).

    Manassas, Prince William County, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Experian Mckinney Data Center

    The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.

    McKinney, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Flexential Dallas Plano (DFW01)

    Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).

    Plano, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • cancelled Franklin County data center proposal

    A data center proposal in Franklin County was dropped.

    Franklin County, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Ge Capital Data Center

    The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • being built Google Armstrong County data center

    Google lists a data center at Armstrong County, Texas and says it is being built.

    Claude, Armstrong County, TX · Capacity not disclosed · Last verified October 24, 2026

  • being built Google Chesterfield County data center

    Google lists a data center at Chesterfield County, Virginia and says it is being built.

    Chesterfield County, VA · Capacity not disclosed · Last verified October 24, 2026

  • being built Google Haskell County data center

    Google lists a data center at Haskell County, Texas and says it is being built.

    Haskell, Haskell County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Google Loudoun County data center

    Google lists a data center at Loudoun County, Virginia among the sites it operates.

    Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Google Midlothian data center

    Google lists a data center at Midlothian, Texas among the sites it operates.

    Midlothian, Ellis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • being built Google Pampa data center

    Google lists a data center at Pampa, Texas and says it is being built.

    Pampa, Gray County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Google Pflugerville Data Center

    Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.

    Pflugerville, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Google Prince William County data center

    Google lists a data center at Prince William County, Virginia among the sites it operates.

    Prince William County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Google Red Oak data center

    Google lists a data center at Red Oak, Texas among the sites it operates.

    Red Oak, Ellis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Google Stonewall Business Park data center

    Google operates the Leesburg data center campus at 20491 Goose Landing Lane in Leesburg, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070558483) and reported in the Google 2026 Environmental Report with 238.1 million gallons of annual water withdrawal in 2025.

    Leesburg, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • being built Google Wilbarger County data center

    Google lists a data center at Wilbarger County, Texas and says it is being built.

    Vernon, Wilbarger County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Google Wilmer Data Center

    Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.

    Wilmer, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running H5 Ashburn

    H5 Data Centers lists a data center at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running H5 Herndon

    H5 Data Centers lists a data center at Herndon, Virginia among the sites it operates.

    Herndon, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running H5 San Antonio

    H5 Data Centers lists a data center at San Antonio, Texas among the sites it operates.

    San Antonio, Bexar County, TX · Capacity not disclosed · Last verified October 24, 2026

  • waiting on permits Iron Horse data center campus

    Hanover leaders recommended approval of the Iron Horse data center campus.

    Hanover County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Iron Mountain Manassas Campus (VA-1)

    Iron Mountain Data Centers operates the Manassas (VA-1) data center campus at 11680 Hayden Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070144508).

    Manassas, Prince William County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Lincoln Rackhouse Dallas Plano

    Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).

    Plano, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Loudoun Data Center 1 (LDC1)

    The EPA's facility registry lists Loudoun Data Center 1 (LDC1) at 21955 Loudoun County Parkway, Ashburn, VA 20147 in Ashburn, Virginia, with a hazardous waste record.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • being built Meta El Paso data center

    Meta's El Paso Data Center in El Paso, Texas, which broke ground in 2025.

    El Paso, El Paso County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Meta Fort Worth Data Center

    Meta lists a data center at Fort Worth, Texas among the sites it operates.

    Fort Worth, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Meta Henrico Data Center

    Meta lists a data center at Henrico, Virginia among the sites it operates.

    Sandston, Henrico County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Meta Temple Data Center

    Meta lists a data center at Temple, Texas among the sites it operates.

    Temple, Bell County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Microsoft Blue Ridge (IAD11-12-13) Data Center

    The EPA's facility registry lists Microsoft Blue Ridge (IAD11-12-13) Data Center at 24282 Quail Ridge LN, Aldie, VA 20105 in Aldie, Virginia, with air and water permits.

    Aldie, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Microsoft Corp DCS, AVC09-AVC13 Datacenter

    The EPA's facility registry lists Microsoft Corp DCS, AVC09 AVC13 Datacenter at Roanoke River Regional Business Park, La Crosse, VA 23950 in La Crosse, Virginia, with an air permit.

    La Crosse, Mecklenburg County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Microsoft Corporation, East Coast Data Center

    The EPA's facility registry lists Microsoft Corporation, East Coast Data Center at 101 Herbert Drive, Boydton, VA 23917 in Boydton, Virginia, with air and water permits.

    Boydton, Mecklenburg County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Oracle Ashburn cloud region

    Oracle lists a data center at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Ashburn 3

    QTS Data Centers lists a data center at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Data Centers Sandston

    QTS Data Centers lists 4 data centers at Sandston, Virginia among the sites it operates.

    Sandston, Henrico County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Data Centers Sterling

    QTS Data Centers lists 3 data centers at Sterling, Virginia among the sites it operates.

    Sterling, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Fort Worth

    QTS Data Centers lists a data center at Fort Worth, Texas among the sites it operates.

    Fort Worth, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • being built QTS Hall County

    QTS Data Centers lists a data center at Hall County, Texas and says it is being built.

    Turkey, Hall County, TX · Capacity not disclosed · Last verified October 24, 2026

  • proposed QTS Howard County

    A QTS Data Centers site in Howard County, Texas, which QTS lists as in consideration.

    Big Spring, Howard County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Irving

    QTS Data Centers lists a data center at Irving, Texas among the sites it operates.

    Irving, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running QTS Manassas 1

    QTS Data Centers lists a data center at Manassas, Virginia among the sites it operates.

    Manassas, Manassas city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running QTS San Antonio

    QTS Data Centers lists a data center at San Antonio, Texas among the sites it operates.

    San Antonio, Bexar County, TX · Capacity not disclosed · Last verified October 24, 2026

  • being built QTS South Dallas

    QTS Data Centers lists a data center at Wilmer, Texas and says it is being built.

    Wilmer, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Rackspace Dallas Grapevine (DFW1)

    Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).

    Grapevine, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running NTT Global Data Centers Ashburn (VA1)

    NTT Global Data Centers operates the Ashburn VA1 data center campus at 44664 Guilford Drive in Ashburn, Loudoun County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110043702801).

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Rockingham Memorial Hospital Data Center

    The EPA's facility registry lists Rockingham Memorial Hospital Data Center at 411 Stone Spring Road, Harrisonburg, VA 22801 in Harrisonburg, Virginia, with an air permit.

    Harrisonburg, Harrisonburg city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running STACK DFW01

    STACK Infrastructure lists a data center at Plano, Texas among the sites it operates.

    Plano, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running STACK DFW02

    STACK Infrastructure lists a data center at Lancaster, Texas among the sites it operates.

    Lancaster, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running STACK Infrastructure Manassas

    STACK Infrastructure lists 2 data centers at Manassas, Virginia among the sites it operates.

    Manassas, Manassas city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running STACK Infrastructure Sterling

    STACK Infrastructure lists 2 data centers at Sterling, Virginia among the sites it operates.

    Sterling, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running STACK NVA06

    STACK Infrastructure lists a data center at Leesburg, Virginia among the sites it operates.

    Leesburg, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • waiting on permits Stafford County data center complex

    Stafford County Planning Commission backed a new 590,000 square foot data center complex.

    Stafford County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Stream Data Centers DFW VII Garland

    Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).

    Garland, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Switch Austin campus

    Switch lists a data center at Austin, Texas among the sites it operates.

    Austin, Travis County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running TECfusions Clarksville data center

    TECfusions operates the Clarksville data center at 250 Burlington Drive in Clarksville, Mecklenburg County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110001894040).

    Clarksville, Mecklenburg County, VA · 24 MW · Last verified October 24, 2026

  • running TierPoint Dallas

    TierPoint lists 3 data centers at Dallas, Texas among the sites it operates.

    Dallas, Dallas County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running TierPoint Fort Worth Data Center

    TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).

    Fort Worth, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running TierPoint Allen Data Center

    TierPoint operates the Dallas Allen data center at 820 Allen Commerce Parkway in Allen, Collin County, Texas.

    Allen, Collin County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Turner Construction Wlo SN1 Data Center Project

    The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.

    San Antonio, Bexar County, TX · Capacity not disclosed · Last verified October 24, 2026

  • running Vantage Data Centers Ashburn

    Vantage Data Centers lists 3 data centers at Ashburn, Virginia among the sites it operates.

    Ashburn, Loudoun County, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Vantage Fredericksburg

    Vantage Data Centers lists a data center at Fredericksburg, Virginia among the sites it operates.

    Fredericksburg, Fredericksburg city, VA · Capacity not disclosed · Last verified October 24, 2026

  • running Evocative Reston (VA1)

    Evocative operates the Reston (VA1) data center at 1807 Michael Faraday Court in Reston, Fairfax County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110031222451).

    Reston, Fairfax County, VA · Capacity not disclosed · Last verified October 24, 2026

  • not yet verified Westlake Data CTR

    The EPA's facility registry lists Westlake Data CTR at 8 Campus Cir, Roanoke, TX 76262 in Roanoke, Texas, with no permit program listed.

    Roanoke, Tarrant County, TX · Capacity not disclosed · Last verified October 24, 2026

  • proposed Yondr Group Manassas data center campus

    Yondr Group and Cerberus Capital Management acquired a 40 acre site in Manassas for a planned 72 MW data center campus expected to enter service in 2029.

    Manassas, Manassas city, VA · Capacity not disclosed · Last verified October 24, 2026

  • proposed 1205 Commonwealth Dr. Data Center (Pennhurst)

    Pennhurst Holdings LLC proposed a 1.9 million square foot, 4 building data center campus at 1205 Commonwealth Drive on the former Pennhurst State School and Hospital property in East Vincent Township, Chester County, Pennsylvania. East Vincent Township supervisors unanimously rejected the proposal in May 2026, prompting an appeal to the Chester County Court of Common Pleas.

    East Vincent Township, Chester County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running 365 Data Centers Philadelphia (PH2)

    365 Data Centers operates the PH2 colocation data center at 3701 Market Street in University City, Philadelphia, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · 2.4 MW · Last verified October 23, 2026

  • proposed 4-3 Salem Township Data Center

    The 4-3 Glen Brook Group proposed a 39 building data center campus spanning 4,466 acres across 279 properties in Salem Township, Luzerne County, Pennsylvania, with projected power demand of 3.5 to 4 gigawatts. In August 2026, a Luzerne County Court of Common Pleas judge ordered Salem Township to redo its July 23, 2026 zoning hearing after residents were locked out of the municipal building.

    Salem Township, Luzerne County, PA · 3.5 GW · Last verified October 23, 2026

  • proposed 900 Conshohocken Rd. Data Center

    MLP Ventures proposed a 2 million square foot data center facility at 900 Conshohocken Road in Plymouth Township, Montgomery County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Plymouth Township, Montgomery County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Ace Data Center

    Ace Data Center operates a single building colocation data center at 1950 South 950 East in Provo, Utah County, Utah under Utah Division of Air Quality permit 4904900259.

    Provo, Utah County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03)

    Aligned Data Centers operates a 55 acre, 3 building colocation data center campus at 3333 W. 9000 South in West Jordan, Salt Lake County, Utah (SLC-01, SLC-02, and SLC-03). Aligned acquired the parcel in 2018, placing one building inside a former semiconductor manufacturing plant and constructing two additional data center buildings under West Jordan building permits and Utah Division of Air Quality Approval Order AI Site 15939 (Project N160660003). In August 2026, after four resident complaints about a persistent humming noise, the Salt Lake County Health Department opened an acoustic investigation scheduled to conclude in November 2026.

    West Jordan, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • being built Aligned PIT-01 (Project Phoenix)

    Aligned Data Centers broke ground on September 10, 2026 on Project Phoenix (Aligned PIT-01), a 3 building, 2 gigawatt data center campus spanning 660 acres on the former Bruce Mansfield coal power plant site in Shippingport, Beaver County, Pennsylvania. The campus uses a closed loop cooling system and dedicated on site natural gas generation, with 12 permit applications tracked by the Pennsylvania Department of Environmental Protection (7 issued, 5 pending).

    Shippingport, Beaver County, PA · 2 GW · Last verified October 23, 2026

  • running Aligned SLC-04

    Aligned Data Centers operates SLC-04, a single building hyperscale data center at 6368 West Beagley Road in West Valley City, Salt Lake County, Utah.

    West Valley City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • being built Amazon Luzerne Data Center (Susquehanna Campus)

    Amazon Web Services is constructing a hyperscale data center campus acquired from Talen Energy (Cumulus Data) on 1,200 acres adjacent to the Susquehanna Steam Electric Station at 500 Salem Boulevard in Salem Township, Luzerne County, Pennsylvania. Phase 1 has completed Pennsylvania DEP review with all 4 permits issued, while Phase 2 has 4 permits under review (3 issued, 1 pending).

    Salem Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Amazon Web Services data center, Center Township

    A data center project in Center Township, Indiana County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Center Township, Indiana County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Archbald I LLC and Archbald II LLC Data Centers

    Archbald I LLC and Archbald II LLC proposed a 2 building data center project in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Avison Young data center, Wilkes-Barre

    A data center project in Wilkes-Barre, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Wilkes-Barre, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Breaker Street Data Center

    A data center project in Jessup, Lackawanna County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Jessup, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Brewster Land Company LLC data center, Dorrance Township

    A data center project in Dorrance Township, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Dorrance Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Carbon Node East / Panther Creek

    Keel Infrastructure and Bitfarms (following its acquisition of Stronghold Digital Mining) are developing the Carbon Node East high performance computing and AI data center campus adjacent to the Panther Creek Energy Facility at 402 Dennison Road in Nesquehoning Borough, Carbon County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.

    Nesquehoning, Carbon County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Comcast XSDC Data Center

    Comcast Corporation operates the Comcast XSDC Data Center at 21 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania, permitted for emergency backup power generation with the Pennsylvania Department of Environmental Protection and Allegheny County Health Department.

    North Fayette Township, Allegheny County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Corscale Dauphin data center

    A data center project in Swatara Township, Dauphin County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Swatara Township, Dauphin County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running DataBank Pittsburgh (PIT2)

    DataBank operates the PIT2 colocation data center providing 4 megawatts of critical IT load at 35 Summit Park Drive in North Fayette Township, Allegheny County, Pennsylvania.

    North Fayette Township, Allegheny County, PA · 4 MW · Last verified October 23, 2026

  • running DataBank Salt Lake City Downtown (SLC1)

    DataBank operates its SLC1 downtown colocation and carrier interconnection facility at 220 S. 200 East in Salt Lake City, Salt Lake County, Utah.

    Salt Lake City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running DataBank Philadelphia (PHL1)

    DataBank operates the PHL1 colocation data center providing 3.1 megawatts of critical IT load at 401 N. Broad Street in Philadelphia, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · 3.1 MW · Last verified October 23, 2026

  • running DataBank Pittsburgh Downtown (PIT1)

    DataBank operates the PIT1 colocation data center inside Nova Place at 100 South Commons in Pittsburgh, Allegheny County, Pennsylvania.

    Pittsburgh, Allegheny County, PA · 4.5 MW · Last verified October 23, 2026

  • running DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)

    DataBank operates the 23 acre, 5 building Granite Point colocation campus (SLC2, SLC3, SLC4, SLC5, and SLC6) at 14870 S. Pony Express Road in Bluffdale, Salt Lake County, Utah, with 66 megawatts of critical IT capacity.

    Bluffdale, Salt Lake County, UT · 66 MW · Last verified October 23, 2026

  • proposed Dickson City Data Center

    A data center project in Dickson City, Lackawanna County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Dickson City, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running eBay Topaz Data Center (SLC2)

    eBay Inc. operates its Topaz SLC Data Center at 6614 West Crimson View Drive in South Jordan, Salt Lake County, Utah, regulated under Utah Division of Air Quality Clean Air Act ID 21467111 and EPA FRS 110070397211.

    South Jordan, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed Emaus Ave Warehouse

    A data center project in Allentown, Lehigh County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Allentown, Lehigh County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Equinix PH1 Philadelphia

    Equinix operates the PH1 International Business Exchange colocation data center inside the Terminal Commerce Building at 401 N. Broad Street in Philadelphia, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · 4.8 MW · Last verified October 23, 2026

  • waiting on permits Falls Township Data Center (Keystone Trade Center)

    Amazon Web Services is developing a hyperscale data center campus at the Keystone Trade Center (former U.S. Steel Fairless Works) at 1000 Steel Road South in Falls Township, Bucks County, Pennsylvania. Phase 1 has completed Pennsylvania DEP review with 1 permit issued, while Phase 2 has 4 environmental permits under review (1 issued, 3 pending).

    Falls Township, Bucks County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Fezzik Energy data center, Midland

    A data center project in Midland, Beaver County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Midland, Beaver County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running FIBERSTATE Salt Lake City (SLC1)

    FIBERSTATE operates a single building colocation data center (SLC1) at 106 E. 13200 South in Draper, Salt Lake County, Utah.

    Draper, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Flexential Philadelphia Collegeville (PHL01)

    Flexential operates the 80,000 square foot, 3.6 megawatt PHL01 colocation data center at 1000 Black Rock Road in Upper Providence Township (Collegeville), Montgomery County, Pennsylvania.

    Upper Providence Township, Montgomery County, PA · 3.6 MW · Last verified October 23, 2026

  • running Flexential Salt Lake City Cottonwood (SLC05)

    Flexential operates its single building SLC05 Cottonwood colocation data center at 6340 S. 3000 East in Salt Lake County, Utah.

    Salt Lake City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Flexential Salt Lake City Fairpark (SLC07)

    Flexential operates its single building SLC07 Fairpark colocation data center at 118 S. 1000 West in Salt Lake City, Salt Lake County, Utah.

    Salt Lake City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Flexential Salt Lake City Lindon (SLC03)

    Flexential operates its single building SLC03 Lindon colocation data center at 333 S. 520 West in Lindon, Utah County, Utah.

    Lindon, Utah County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Flexential Salt Lake City Millcreek (SLC10)

    Flexential operates its single building SLC10 Millcreek colocation data center at 3949 S. 200 East in Salt Lake City, Salt Lake County, Utah.

    Salt Lake City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Flexential Salt Lake City South Valley (SLC09)

    Flexential operates its single building SLC09 South Valley colocation data center in West Jordan, Salt Lake County, Utah.

    West Jordan, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed Frackville Data

    A data center project in New Castle Township, Schuylkill County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    New Castle Township, Schuylkill County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Gouldsboro Data Center Project / Project Gold

    Quantm Group LLC and 1778 Rich Pike LLC proposed the Gouldsboro Data Center Project (Project Gold) along Drinker Turnpike in Clifton Township, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Clifton Township, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running H5 Data Centers Philadelphia

    H5 Data Centers operates a colocation facility at 1500 Spring Garden Street in Philadelphia, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running H5 Data Centers Pittsburgh

    H5 Data Centers operates a carrier hotel and colocation facility at 2202 Liberty Avenue in the Strip District of Pittsburgh, Allegheny County, Pennsylvania.

    Pittsburgh, Allegheny County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Digital Realty 833 Chestnut Street Philadelphia Data Center

    Digital Realty and carrier hotel tenants operate a 670,000 square foot, 10 megawatt interconnection and data center facility at 833 Chestnut Street in Center City Philadelphia, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · 10 MW · Last verified October 23, 2026

  • proposed Hendricks data center, Penn Forest Township

    A data center project in Penn Forest Township, Carbon County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Penn Forest Township, Carbon County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Highridge Data Project Nebius

    NorthPoint Development and Nebius proposed the Highridge Data Project on a 600 acre tract in Highridge Business Park in Butler Township, Schuylkill County, Pennsylvania, with a Chapter 102 NPDES stormwater permit application under review at the Pennsylvania Department of Environmental Protection.

    Butler Township, Schuylkill County, PA · Capacity not disclosed · Last verified October 23, 2026

  • being built Homer City Energy Campus Redevelopment

    Homer City Redevelopment LLC is redeveloping the 3,200 acre former Homer City Generating Station at 1750 Power Plant Road in Center and Blacklick Townships near Homer City, Indiana County, Pennsylvania into a natural gas powered AI data center campus with up to 4.5 gigawatts of generation capacity. The Indiana County Conservation District issued a PAG-02 general stormwater construction permit and a draft NPDES industrial waste amendment in 2026 as 1,800 tradespeople work on site.

    Homer City, Indiana County, PA · 4.5 GW · Last verified October 23, 2026

  • proposed Hunlock Data Center

    Castleton Commodities International and UGI Development Company have proposed a data center facility adjacent to the Hunlock Creek Energy Center along US Route 11 in Hunlock Township, Luzerne County, Pennsylvania, where the power station holds Susquehanna River Basin Commission Docket 20090632 for Susquehanna River water withdrawal and consumptive use.

    Hunlock Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Iron Mountain Western Pennsylvania Data Center (WPA-1)

    Iron Mountain Data Centers operates the WPA-1 underground data center facility providing 21 megawatts of capacity inside a former limestone mine at 1137 Branchton Road in Boyers, Cherry Township, Butler County, Pennsylvania.

    Cherry Township, Butler County, PA · 21 MW · Last verified October 23, 2026

  • waiting on permits Kline Township Data Center Development

    A data center project in Kline Township, Schuylkill County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Kline Township, Schuylkill County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed KSR data center, Plains Township

    A data center project in Plains Township, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Plains Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Lancaster AI Hub East

    Chirisa Technology Parks and CoreWeave are developing Lancaster AI Hub East across 2 industrial buildings at the former RR Donnelley East printing complex at 216 Greenfield Road in the City of Lancaster, Lancaster County, Pennsylvania, with 4 Phase 1 environmental permits under review at the Pennsylvania Department of Environmental Protection and a second phase proposed.

    Lancaster, Lancaster County, PA · 200 MW · Last verified October 23, 2026

  • waiting on permits Lancaster AI Hub West

    Chirisa Technology Parks and CoreWeave are redeveloping the former RR Donnelley West printing facility at 1375 Harrisburg Pike in the City of Lancaster, Lancaster County, Pennsylvania into the 2 building, 100 megawatt Lancaster AI Hub West campus. The Pennsylvania Department of Environmental Protection has issued 2 of 3 tracked permits, including an Air Quality Plan Approval for 176 backup diesel generators.

    Lancaster, Lancaster County, PA · 100 MW · Last verified October 23, 2026

  • proposed LBT Investment Group LLC data center, Sugarloaf Township

    A data center project in Sugarloaf Township, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Sugarloaf Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Linde Data Center / Forest City Energy Center LLC

    A data center project in Clinton Township, Wayne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Clinton Township, Wayne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Londonderry Data Center

    A data center campus is proposed in Londonderry Township, Dauphin County, Pennsylvania near the Three Mile Island Unit 1 (Crane Clean Energy Center) nuclear generating station, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Londonderry Township, Dauphin County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Lower Mount Bethel Technology Center

    A data center project in Lower Mount Bethel Township, Northampton County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Lower Mount Bethel Township, Northampton County, PA · Capacity not disclosed · Last verified October 23, 2026

  • cancelled MLP Ventures King of Prussia Data Center Campus

    MLP Ventures proposed a 4.6 million square foot, 7 building data center campus across five properties in Upper Merion Township (King of Prussia), Montgomery County, Pennsylvania. After the Upper Merion Township Board of Supervisors rejected preliminary land development plans in August 2026, the developer withdrew its zoning applications on October 20, 2026.

    King of Prussia, Montgomery County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Mount Carmel Township Data Center

    A data center project in Mount Carmel Township, Northumberland County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Mount Carmel Township, Northumberland County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Nescopeck / Valley View Wood Data Center

    A data center project in Nescopeck Township, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Nescopeck Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Newport Ridge Data Center

    Newport Township issued municipal zoning permits in September 2026 for the Newport Ridge Data Center campus in Luzerne County, Pennsylvania, authorizing 15 closed loop data center buildings powered by three natural gas generation stations across mixed use and industrial zones.

    Newport Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Novva West Jordan Data Center Campus

    Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan, Salt Lake County, where Phase 1 opened in 2023 and Phases 2 and 3 are under construction across three disclosed buildings following a $355 million CIM Group investment in June 2022 and $2 billion in construction financing in March 2025.

    West Jordan, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • running Intelligence Community Comprehensive National Cybersecurity Initiative Data Center

    The National Security Agency operates the Intelligence Community Comprehensive National Cybersecurity Initiative Data Center at Camp Williams in Bluffdale, Utah County and Salt Lake County, Utah (EPA FRS 110043515700).

    Bluffdale, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed Outrigger Data Center

    A data center project in Mifflin Township, Columbia County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Mifflin Township, Columbia County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits PAX-1 Data Center

    PAX-1 Data Center is a proposed data center campus on a 700 acre tract off Country Club Road in Middlesex Township, Cumberland County, Pennsylvania. In August 2026, Governor Josh Shapiro removed PAX-1 from the PA Permit Fast Track program under Executive Order 2026-05, while a Chapter 102 NPDES stormwater permit application remains under review at the Pennsylvania Department of Environmental Protection.

    Middlesex Township, Cumberland County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Pittsburgh International Race Complex Data Center (Switch)

    Wampum I LLC and Switch filed local land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for a 3 building data center campus on the 384 acre former Pittsburgh International Race Complex property at 201 Penndale Road in Big Beaver Borough, Beaver County, Pennsylvania.

    Big Beaver, Beaver County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Pocono Manor Investors data center, Tobyhanna Township

    A data center project in Tobyhanna Township, Monroe County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Tobyhanna Township, Monroe County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Project Atlas

    A data center project in South Whitehall Township, Lehigh County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    South Whitehall Township, Lehigh County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Project Boson / Highway Auto Data Center

    A data center project in Archbald, Lackawanna County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Project Forge Data Center

    Sentinel Green Fig LLC (fifteenfortyseven Critical Systems Realty and Green Fig Land Company) is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Forge, a 2 building, 150 megawatt hyperscale data center campus on 100 acres at 258 Swedesford Road in East Whiteland Township, Chester County, Pennsylvania.

    East Whiteland Township, Chester County, PA · 150 MW · Last verified October 23, 2026

  • waiting on permits Project Gravity

    Archbald 25 Developer LLC is seeking a Pennsylvania DEP Chapter 102 NPDES stormwater permit for Project Gravity, a proposed 7 building AI data center complex in Archbald Borough, Lackawanna County, Pennsylvania that was removed from the PA Permit Fast Track program in May 2026.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Project Green Mountain

    A data center project in Archbald, Lackawanna County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Project Hazelnut

    NorthPoint Development filed land development plans and a Pennsylvania DEP Chapter 102 NPDES stormwater permit application for Project Hazelnut, a 15 building data center campus for Amazon Web Services on 1,282 acres north of Humboldt Industrial Park North in Hazle Township, Luzerne County, Pennsylvania, with an estimated municipal water demand of 67,000 gallons per day. Hazle Township supervisors denied the preliminary land development plan in November 2025 and enacted a zoning ordinance amendment in October 2026 while state environmental review remains pending.

    Hazle Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Project Hummingbird

    A data center project in Monongahela Township, Greene County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Monongahela Township, Greene County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Project Scott

    Patrinely and Provident Real Estate proposed Project Scott in Archbald Borough, Lackawanna County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • being built QTS Eagle Mountain

    QTS Data Centers is constructing its QTS SLC DC1 hyperscale data center campus in Eagle Mountain, Utah County, Utah under stormwater permits UTRC08700 and UTRC11607.

    Eagle Mountain, Utah County, UT · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits QTS Salem Township

    QTS Data Centers acquired approximately 1,700 acres for $580 million in Salem Township, Luzerne County, Pennsylvania and received township approval in July 2026 for road vacations and a 15 building data center master plan, with an Act 537 sewage facilities permit under review at the Pennsylvania Department of Environmental Protection.

    Salem Township, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed River Pointe Data Center

    Slate Belt Holdings LLC, a partnership including Talen Energy and the River Pointe Logistics Center developers, proposed a 23 building data center campus on 754 acres along River Road in Upper Mount Bethel Township, Northampton County, Pennsylvania, with each building pad designed for a 201,000 square foot footprint.

    Upper Mount Bethel Township, Northampton County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Scranton Materials Data Center

    Mudiita Land Venture LLC acquired 528.6 acres in Ransom Township near Old Forge, Lackawanna County, Pennsylvania for the proposed Scranton Materials hyperscale data center campus, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Ransom Township, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Sharon Data Center Project

    A data center project in Sharon, Mercer County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Sharon, Mercer County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Smithfield Gateway Project

    DEPG Moiser Associates LP and DEPG of Shawnee II Associates LP proposed a single 500,000 square foot data center building within the Smithfield Gateway development along Route 209 in Smithfield Township, Monroe County, Pennsylvania.

    Smithfield Township, Monroe County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Spring Mountain Quakake Tunnel

    NorthPoint Development proposed the Spring Mountain Quakake Tunnel data center project in Packer Township, Carbon County, Pennsylvania, listed on the Pennsylvania DEP Data Center Permit Tracker.

    Packer Township, Carbon County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Springdale Data Center

    A data center project in Springdale, Allegheny County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Springdale, Allegheny County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Starpointe Data Center

    A data center project in Hanover Township, Washington County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Hanover Township, Washington County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running STRATA Vernal Data Center

    STRATA Networks operates a single building regional colocation data center at 67 N. Vernal Avenue in Vernal, Uintah County, Utah.

    Vernal, Uintah County, UT · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Stratos Project

    Joule Capital Partners LLC (doing business as Stratos) proposes an 11 cluster data center campus on roughly 2,000 acres in unincorporated Box Elder County, where the County Commission adopted Ordinance 642 on December 17, 2025 to create the AgriTech Inland Port Project Area and faces an active 1st District Court referendum appeal filed by Box Elder County Alliance for Responsible Growth (B.E.A.R.), while Utah Division of Water Rights Change Application a55167 on Water Right 13-2 seeks 1,712 acre feet a year (1,528,767 gallons a day withdrawal).

    Box Elder County, UT · 7.5 GW · Last verified October 23, 2026

  • proposed Sunnyside Road Data Center

    A data center project in Jessup, Lackawanna County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Jessup, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running TECfusions Keystone Connect AI Data Center

    TECfusions operates the Keystone Connect AI data center campus on the 1,395 acre former Alcoa Technical Center property at 780 Burrell Avenue in New Kensington and Upper Burrell Township, Westmoreland County, Pennsylvania. Building J launched live GPU capacity in August 2026 following Upper Burrell Township land development approval and completion of Pennsylvania DEP review (4 permits issued, 1 pending), with long term plans for up to 3 gigawatts of on site natural gas power.

    New Kensington, Westmoreland County, PA · 3 GW · Last verified October 23, 2026

  • running TierPoint Allentown TekPark Data Center

    TierPoint operates the Allentown TekPark colocation data center at 9999 Hamilton Boulevard in Breinigsville (Upper Macungie Township), Lehigh County, Pennsylvania.

    Upper Macungie Township, Lehigh County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running TierPoint Bethlehem Data Center

    TierPoint operates a colocation data center at 3864 Courtney Street in Bethlehem, Northampton County, Pennsylvania.

    Bethlehem, Northampton County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running TierPoint Lehigh Valley Data Center

    TierPoint operates the Lehigh Valley colocation data center at 3949 Schelden Circle in Bethlehem, Northampton County, Pennsylvania.

    Bethlehem, Northampton County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running TierPoint Philadelphia Navy Yard Data Center

    TierPoint operates a colocation data center at 4775 League Island Boulevard in the Philadelphia Navy Yard, Philadelphia County, Pennsylvania.

    Philadelphia, Philadelphia County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running TierPoint Valley Forge Data Center

    TierPoint operates its Valley Forge colocation data center at 1000 Adams Avenue in Audubon (Lower Providence Township), Montgomery County, Pennsylvania.

    Lower Providence Township, Montgomery County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running Tonaquint St. George Data Center

    Tonaquint Data Centers operates a single building regional colocation facility at 1108 W. 1600 South in St. George, Washington County, Utah.

    St. George, Washington County, UT · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Triboro Industrial Park Data Center

    A Chapter 102 NPDES stormwater permit application is under review at the Pennsylvania Department of Environmental Protection for the Triboro Industrial Park Data Center in Throop Borough, Lackawanna County, Pennsylvania.

    Throop, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running United Fiber & Data York Data Center

    United Fiber & Data operates a fiber interconnection and colocation data center at 319 Chestnut Street in the City of York, York County, Pennsylvania.

    York, York County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Project Beehive

    Valar Atomics proposed Project Beehive, a nuclear powered data center campus on Utah Trust Lands Administration industrial land south of Price in Carbon County, Utah.

    Price, Carbon County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed Verdantas and Prologis data center, Allen Township

    A data center project in Allen Township, Northampton County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Allen Township, Northampton County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Volition Industries Spanish Fork

    Spanish Fork City Council approved a Title 15 zoning amendment creating a Data Center Overlay District on September 21, 2026, while the developer proposed moving the 250 MW project to an unincorporated Utah County site in the Stockman Flats area south of the city.

    Spanish Fork, Utah County, UT · 250 MW · Last verified October 23, 2026

  • running Voonami Orem Data Center (SLC1)

    Voonami Inc. operates a single building colocation data center at 510 East Technology Avenue in Orem, Utah County, Utah.

    Orem, Utah County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed West Hazleton Data Center

    A data center project in West Hazleton, Luzerne County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    West Hazleton, Luzerne County, PA · Capacity not disclosed · Last verified October 23, 2026

  • proposed Wildcat Ridge Data Center Campus

    Pine Line Inc proposed the Wildcat Ridge Data Center Campus on 500 acres along Wildcat Road in Archbald Borough, Lackawanna County, Pennsylvania, planned for 14 data center buildings and 588 emergency backup diesel generators alongside adjacent PPL and Blackstone natural gas power generation.

    Archbald, Lackawanna County, PA · Capacity not disclosed · Last verified October 23, 2026

  • waiting on permits Wyalusing Energy Center

    A data center project in Wyalusing Township, Bradford County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    Wyalusing Township, Bradford County, PA · Capacity not disclosed · Last verified October 23, 2026

  • running XMission Salt Lake City Colocation Center

    XMission operates a single building colocation facility at 67 E. 400 South in Salt Lake City, Salt Lake County, Utah.

    Salt Lake City, Salt Lake County, UT · Capacity not disclosed · Last verified October 23, 2026

  • proposed Zediker Station Data Center

    A data center project in South Strabane Township, Washington County, listed on the Pennsylvania DEP's Data Center Permit Tracker.

    South Strabane Township, Washington County, PA · Capacity not disclosed · Last verified October 23, 2026

  • reported Bell Works Data Center

    A data center bid by Bell Works preceded a New Jersey town's move to ban data centers, raising questions about whether the project would be exempt from the ban.

    Holmdel, Monmouth County, NJ · Capacity not disclosed · Last verified October 22, 2026

  • reported NextEra and Brookfield Kentucky Data Center Campus

    NextEra and Brookfield plan a $100 billion data center campus in Kentucky.

    Paducah, McCracken County, KY · Capacity not disclosed · Last verified October 22, 2026

  • reported 3 G Investments, LLC Richmond data center

    3 G Investments, LLC Richmond data center

    Richmond County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported 7-building data center campus metro Atlanta

    A seven building data center campus was proposed in the Atlanta metropolitan area.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Amazon AWS Butts County data center

    Amazon Web Services plans to spend at least $11 billion on new data center capacity in Butts County (and Douglas County) in metro Atlanta.

    Butts County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Apple Reno Data Center

    Apple planned a 137 acre, 18,20 MW solar array adjacent to its Reno data center in partnership with NV Energy, expected to generate approximately 43.5 million kilowatt-hours of clean energy per year.

    Reno, Washoe County, NV · 20 MW · Last verified October 21, 2026

  • reported Burr Computer Environments ATL11 Union City campus

    Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.

    Union City, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported DataBank Project Indo

    DataBank filed a Development of Regional Impact application for Project Indo in Cartersville, Georgia, a 200 MW campus across 69 acres totaling 1.1 million sq ft valued at approximately $2.4 billion, with first phase targeted for 2032.

    Cartersville, Bartow County, GA · 200 MW · Last verified October 21, 2026

  • reported Douglas County Liberty Road data center (700-acre)

    A 700 acre data center is proposed near Liberty Road in Douglas County, with a public hearing pending amid divided resident opinion.

    Douglas County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Edged Energy Prichard Data Center

    Edged Energy proposed a $93 million data center on Telegraph Road in Prichard, prompting the city council to weigh a 480 day moratorium on new data center permits.

    Prichard, Mobile County, AL · Capacity not disclosed · Last verified October 21, 2026

  • reported Edged Project Lola Council Bluffs

    Edged topped out the first building of Project Lola in Council Bluffs, a two building campus totaling approximately 200 MW, with the second building due to top out in September 2026.

    Council Bluffs, Pottawattamie County, IA · 200 MW · Last verified October 21, 2026

  • reported Endeavour Edged Aurora Data Center

    Endeavour Edged is building a $500 million carbon neutral data center project in three buildings at Bilter and Eola roads in Aurora.

    Aurora, Kane County, IL · Capacity not disclosed · Last verified October 21, 2026

  • reported Facebook Social Circle data center

    Facebook announced a data center campus near Social Circle, Georgia with a $750 million investment in the first phase, expected to be operational in 2020.

    Social Circle, Newton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Fulton Jail area data center

    A mixed use project including a data center, office, and residential space was planned near the Fulton jail in Atlanta.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Georgia Largest Data Center

    A Georgia data center project is reported to be among the largest in the United States.

    Fayetteville, Fayette County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Gigawatt-scale Atlanta data center (withdrawn)

    A gigawatt scale data center project in the Atlanta area was withdrawn by its developer.

    Atlanta, Fulton County, GA · 1 GW · Last verified October 21, 2026

  • reported Google Monroe County data center

    Google purchased 950 acres in Monroe County, Georgia for $58.5 million for potential data center expansion with no confirmed development timeline.

    Monroe County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Google Monroe data center

    Google Monroe data center

    Monroe County, GA · Capacity not disclosed · Last verified October 21, 2026

  • being built Google West Memphis Data Center

    Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records.

    West Memphis, Crittenden County, AR · Capacity not disclosed · Last verified October 21, 2026

  • reported LaGrange $9.7B data center

    A $9.7 billion data center has been proposed near LaGrange, Georgia.

    LaGrange, Troup County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Meta Data Center Georgia

    Georgia families filed a lawsuit against Meta accusing its data center of contaminating their water.

    Morgan County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Meta Stanton Springs Data Center

    Meta lists a data center at Stanton Springs, Georgia among the sites it operates.

    Stanton Springs, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Microsoft AI Superfactory Fayetteville (QTS campus)

    Microsoft opened its first AI superfactory data center at the QTS campus in Fayetteville, Georgia, spanning more than 1 million square feet, with operations beginning in October 2025.

    Fayetteville, Fayette County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Microsoft Palmetto data center

    Microsoft acquired nearly 21 acres adjacent to its existing Palmetto data center campus in south Fulton County for $6 million to support ongoing data center construction, and later purchased additional land near Atlanta.

    Palmetto, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Microsoft Union City data center

    Microsoft Union City data center

    Union City, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Novva North Las Vegas data center

    Novva Data Centers plans a 100 MW, 275,000 square foot data center on a 20 acre campus in North Las Vegas, expected to open in late 2023, with state tax abatements approved in summer 2022.

    North Las Vegas, Clark County, NV · 100 MW · Last verified October 21, 2026

  • reported QTS Atlanta 2 (Westside)

    QTS announced plans for a 1.5 million square foot data center campus with 400 residential units on Atlanta's Westside, later filing a BeltLine SAP application for the expansion, while pausing a request for $45 million in tax incentives.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported QTS Augusta (Gordon Highway)

    QTS announced a data center project on Gordon Highway near Augusta, reported to be approximately twice the size of Augusta Mall, with community meetings held and completion projected to take years.

    Augusta, Richmond County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported RSC Investment Management South Fulton data center campus

    RSC Investment Management filed a Development of Regional Impact filing on December 10, 2024 for a 1.9 million square foot data center campus in South Fulton, Georgia.

    South Fulton, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Social Circle data center

    The Social Circle City Council approved a data center on November 11, 2025.

    Social Circle, Walton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Strategic Real Estate Partners Rockdale County data center campus

    Strategic Real Estate Partners filed state paperwork for a three warehouse, 837,500 square foot data center campus on 53 acres near Conyers in Rockdale County, east of Atlanta.

    Conyers, Rockdale County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Switch Bartow County data center

    Switch plans a $772 million data center in Bartow County, Georgia.

    Bartow County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported T5 Data Centers Augusta Campus

    T5 Data Centers announced construction of a 200 MW data center campus in Augusta, Georgia.

    Augusta, Richmond County, GA · 200 MW · Last verified October 21, 2026

  • reported T5 Data Centers Fairburn campus

    T5 Data Centers is planning a data center campus in Fairburn, Georgia.

    Fairburn, Fulton County, GA · Capacity not disclosed · Last verified October 21, 2026

  • reported Trammell Crow Forsyth Data Center Campus

    Trammell Crow Company proposes a $21 billion, 1,632 acre data center campus along I-75 in Forsyth, Georgia, comprising up to 12 million square feet across 21 data center warehouses.

    Forsyth, Monroe County, GA · Capacity not disclosed · Last verified October 21, 2026

  • not yet verified 365 SG Operating, CO1 Data Center

    The EPA's facility registry lists 365 SG Operating, CO1 Data Center at 3431 Windsor DR, Aurora, CO 80011 in Aurora, Colorado, with an air permit.

    Aurora, Adams County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified 3AY Sabey @ Ocean Cnty Business PK

    The EPA's facility registry lists 3AY Sabey @ Ocean Cnty Business PK at 1889 RT 9, Toms River, NJ 08753 in Toms River, New Jersey, with no permit program listed.

    Toms River, Ocean County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • being built 5C Data Centers Memphis (MEM01)

    5C Data Centers is expanding its MEM01 facility at 4300 Getwell Road in the former Fred's corporate headquarters and distribution complex (1.1 million square foot site) from 20 MW to 84 MW using on site Bloom Energy solid oxide fuel cells and liquid cooled NVIDIA GB200 and GB300 NVL72 infrastructure under a $575 million Phase 4 alteration permit.

    Memphis, Shelby County, TN · 84 MW · Last verified October 20, 2026

  • not yet verified Adp Rankin Data Hub, LLC, Data Center

    The EPA's facility registry lists Adp Rankin Data Hub, LLC, Data Center at State Highway 18, Brandon, MS 39042 in Brandon, Mississippi, with a water permit.

    Brandon, Rankin County, MS · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Aiken 5 MW Data Center

    The EPA's facility registry lists Aiken 5 MW Data Center at 1145 Bettis Academy Road And Giant Tire Parkway, Aiken, SC 29847 in Aiken, South Carolina, with a water permit.

    Edgefield County, SC · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Allstate Data Center-rochelle

    The EPA's facility registry lists Allstate Data Center rochelle at Dement RD N Of Il RT 38, Rochelle, IL 61068 in Rochelle, Illinois, with a water permit.

    Rochelle, Ogle County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Ameritech Howell Data Center

    The EPA's facility registry lists Ameritech Howell Data Center at 7737 S Howell Ave, Oak Creek, WI 53154 in Oak Creek, Wisconsin, with a hazardous waste record.

    Oak Creek, Milwaukee County, WI · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Apl Data Center

    The EPA's facility registry lists Apl Data Center at 3555 Grant RD, East Wenatchee, WA 98802 in East Wenatchee, Washington, with a water permit.

    East Wenatchee, Douglas County, WA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Apld Jamestown Datacenter

    The EPA's facility registry lists Apld Jamestown Datacenter at 2671 Hwy 20 SE, Jamestown, ND 58401 in Jamestown, North Dakota, with a water permit.

    Jamestown, Stutsman County, ND · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Applied Digital Corp

    The EPA's facility registry lists Applied Digital Corp at 214 Flynn Ave, Moorestown, NJ 08057 in Moorestown, New Jersey, with no permit program listed.

    Moorestown, Burlington County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Applied Digital Data Corp

    The EPA's facility registry lists Applied Digital Data Corp at 100 Marcus Boulevard, Hauppauge, NY 11788 in Hauppauge, New York, with a hazardous waste record.

    Hauppauge, Suffolk County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Bitpower Data Center

    The EPA's facility registry lists Bitpower Data Center at Along Mill Creek Hwy S Of Ba&p Railroad On E Side, Anaconda, MT 59711 in Anaconda, Montana, with a water permit.

    Deer Lodge County, MT · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cellco -irvine Data Center

    The EPA's facility registry lists Cellco -irvine Data Center at 2640 Main Street, Irvine, CA 92614 in Irvine, California, with a water permit.

    Irvine, Orange County, CA · Capacity not disclosed · Last verified October 20, 2026

  • running Centersquare New York data center

    Centersquare lists a data center at New York, New York among the sites it operates.

    New York, New York County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Citizens Bank Data Center

    The EPA's facility registry lists Citizens Bank Data Center at 1 Citizens DR, East Providence, RI 02915 in East Providence, Rhode Island, with no permit program listed.

    East Providence, Providence County, RI · Capacity not disclosed · Last verified October 20, 2026

  • reported Clean Cloud Energy Mahomet data center

    Clean Cloud Energy Mahomet data center

    Mahomet, Champaign County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cologix NNJ1

    The EPA's facility registry lists Cologix NNJ1 at 1719 RT 10, Parsippany, NJ 07054 in Parsippany, New Jersey, with no permit program listed.

    Parsippany, Morris County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cologix NNJ2

    The EPA's facility registry lists Cologix NNJ2 at 9 Wing DR, Cedar Knolls, NJ 07927 in Cedar Knolls, New Jersey, with no permit program listed.

    Cedar Knolls, Morris County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Compark Data Center

    The EPA's facility registry lists Compark Data Center at Compark And Peoria, Centennial, CO 80112 in Centennial, Colorado, with a water permit.

    Douglas County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Crane Data Center

    The EPA's facility registry lists Crane Data Center at 3993 Heather ST, Forest Grove, OR 97116 in Forest Grove, Oregon, with a water permit.

    Forest Grove, Washington County, OR · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cryptowatt Mining Data Center

    The EPA's facility registry lists Cryptowatt Mining Data Center at 200 Technology Way, Butte, MT 59701 in Butte, Montana, with a water permit.

    Butte, Silver Bow County, MT · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cube Na Data Center Company LLC

    The EPA's facility registry lists Cube Na Data Center Company LLC at 101 Holmes, Kansas City, MO 64108 in Kansas City, Missouri, with an air permit and a hazardous waste record.

    Kansas City, Jackson County, MO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Cyxtera DN2

    The EPA's facility registry lists Cyxtera DN2 at 9110 Commerce Center Cir, Littleton, CO 80129 in Littleton, Colorado, with no permit program listed.

    Littleton, Douglas County, CO · Capacity not disclosed · Last verified October 20, 2026

  • reported Data center near Madison

    A massive data center near Madison, Indiana has unresolved power supply questions about its electricity source.

    Madison, Jefferson County, IN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Databank Imx

    The EPA's facility registry lists Databank Imx at 840 Riverside Parkwa Suite 60, West Sacramento, CA 95605 in West Sacramento, California, with a hazardous waste record.

    West Sacramento, Yolo County, CA · Capacity not disclosed · Last verified October 20, 2026

  • reported DataOne Frankfort data center

    DataOne Frankfort data center

    Frankfort, Clinton County, IN · Capacity not disclosed · Last verified October 20, 2026

  • reported DC Blox Irvington data center campus

    City officials voted on July 15, 2026 to approve a DC Blox data center campus near Irvington despite community opposition.

    Indianapolis, Marion County, IN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Digital Crossroads Of America Data Center & Central Plant

    The EPA's facility registry lists Digital Crossroads Of America Data Center & Central Plant at 701 Casino Center DR, Hammond, IN 46320 in Hammond, Indiana, with a water permit.

    Hammond, Lake County, IN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Digital Data Center

    The EPA's facility registry lists Digital Data Center at 188 Internationale BLVD, Glendale Heights, IL 60139 in Glendale Heights, Illinois, with a hazardous waste record.

    Glendale Heights, Dupage County, IL · Capacity not disclosed · Last verified October 20, 2026

  • running Digital Realty New York

    Digital Realty lists 3 data centers at New York, New York among the sites it operates.

    New York, New York County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Digital Realty SJC22

    The EPA's facility registry lists Digital Realty SJC22 at 6505 Kaiser DR., Fremont, CA 94555 in Fremont, California, with no permit program listed.

    Fremont, Alameda County, CA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Digital Realty Trust

    The EPA's facility registry lists Digital Realty Trust at 210 N Tucker BLVD, ST Louis, MO 63101 in ST Louis, Missouri, with a hazardous waste record.

    ST Louis, ST. Louis city, MO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Dipper Ventures LLC CH3 Data Center

    The EPA's facility registry lists Dipper Ventures LLC CH3 Data Center at 1400 Devon Ave, Elk Grove Village, IL 60007 in Elk Grove Village, Illinois, with an air permit.

    Elk Grove Village, Cook County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified DXC Technology Services LLC / Cherokee Data Center

    The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit.

    Tulsa, Tulsa County, OK · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Emerald Data Center

    The EPA's facility registry lists Emerald Data Center at 9601 Emerald Street, Boise, ID 83704 in Boise, Idaho, with a water permit.

    Boise, Ada County, ID · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Ensono Data Center

    The EPA's facility registry lists Ensono Data Center at 1501 Opus Place, Downers Grove, IL 60515 in Downers Grove, Illinois, with an air permit.

    Downers Grove, Dupage County, IL · Capacity not disclosed · Last verified October 20, 2026

  • running Equinix NY9

    Equinix lists a data center at New York, New York among the sites it operates.

    New York, New York County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Evoque Data Center Solutions, PNJ1

    The EPA's facility registry lists Evoque Data Center Solutions, PNJ1 at 3 Corporate PL, Piscataway, NJ 08854 in Piscataway, New Jersey, with an air permit.

    Piscataway, Middlesex County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Franklin Park (CHI22) Data Center

    The EPA's facility registry lists Franklin Park (CHI22) Data Center at 9401 W Grand Ave, Franklin Park, IL 60131 in Franklin Park, Illinois, with an air permit.

    Franklin Park, Cook County, IL · Capacity not disclosed · Last verified October 20, 2026

  • reported GNM New York PoP at Tribeca

    GNM switched on a New York point of presence at a Tribeca data center.

    New York, New York County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Grafton Data Center

    The EPA's facility registry lists Grafton Data Center at 8 Centennial DR, Grafton, MA 01519 in Grafton, Massachusetts, with an air permit.

    Grafton, Worcester County, MA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Grant Node Data Center

    The EPA's facility registry lists Grant Node Data Center at 7906 Randolph RD NE, Moses Lake, WA 98837 in Moses Lake, Washington, with a water permit.

    Moses Lake, Grant County, WA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified H 5 Data Centers

    The EPA's facility registry lists H 5 Data Centers at 5350 S Valentia Way, Greenwood Village, CO 80111 in Greenwood Village, Colorado, with a hazardous waste record.

    Greenwood Village, Arapahoe County, CO · Capacity not disclosed · Last verified October 20, 2026

  • running H5 New York

    H5 Data Centers lists a data center at New York, New York among the sites it operates.

    New York, New York County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified HSBC Vernon Hills Data Center

    The EPA's facility registry lists HSBC Vernon Hills Data Center at 475 Corporate Woods Parkway, Vernon Hills, IL 60061 in Vernon Hills, Illinois, with a water permit.

    Vernon Hills, Lake County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Iea, SBD, 9403- Aegon Data Center

    The EPA's facility registry lists Iea, SBD, 9403- Aegon Data Center at 6910 Tower RD SW, Cedar Rapids, IA 52404 in Cedar Rapids, Iowa, with no permit program listed.

    Cedar Rapids, Linn County, IA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Inflow Data Center

    The EPA's facility registry lists Inflow Data Center at 4518 S. Miami Boulevard, Durham, NC 27703 in Durham, North Carolina, with an air permit.

    Durham, Durham County, NC · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Infomart Data Center, Cascadia 02

    The EPA's facility registry lists Infomart Data Center, Cascadia 02 at 21515 NW Evergren Parkway, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Intel Corporation Data Center

    The EPA's facility registry lists Intel Corporation Data Center at 2151 Mission College Blvd., Santa Clara, CA 95054 in Santa Clara, California, with a hazardous waste record.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Irea Highfield Data Center SSS4275

    The EPA's facility registry lists Irea Highfield Data Center SSS4275 at Compark Blvd/upland DR And Highfield Pky And Grass, Parker, CO 80134 in Parker, Colorado, with a water permit.

    Parker, Douglas County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Iron Gate Data Centers, Eagan

    The EPA's facility registry lists Iron Gate Data Centers, Eagan at 3199 Pilot Knob RD, Eagan, MN 55121 in Eagan, Minnesota, with an air permit and a hazardous waste record.

    Eagan, Dakota County, MN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Iron Mountain Data Centers, Fortrust

    The EPA's facility registry lists Iron Mountain Data Centers, Fortrust at 4300 Brighton Boulevard, Denver, CO 80216 in Denver, Colorado, with an air permit.

    Denver, Denver County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center

    The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.

    St. Francisville, West Feliciana Parish, LA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Jordan Feeder, Flexential Project (de)

    The EPA's facility registry lists Jordan Feeder, Flexential Project (de) at South Potomac And East Broncos Parkway, Unincorporated Arapahoe County, CO 80012 in Unincorporated Arapahoe County, Colorado, with a water permit.

    Arapahoe County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Kansas City Data Center C

    The EPA's facility registry lists Kansas City Data Center C at 24400 W Valley Parkway, Olathe, KS 66061 in Olathe, Kansas, with an air permit.

    Olathe, Johnson County, KS · Capacity not disclosed · Last verified October 20, 2026

  • reported Lambda Chouteau data center

    Lambda Chouteau data center

    Chouteau, Mayes County, OK · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Liberty Mutual Data Center

    The EPA's facility registry lists Liberty Mutual Data Center at 225 Borthwick Avenue, Portsmouth, NH 03801 in Portsmouth, New Hampshire, with an air permit and a hazardous waste record.

    Portsmouth, Rockingham County, NH · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Lightedge Data Center

    The EPA's facility registry lists Lightedge Data Center at 1148 American Pkwy, Papillion, NE 68046 in Papillion, Nebraska, with an air permit.

    Papillion, Sarpy County, NE · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Meridian Parkway Data Center Owner LLC

    The EPA's facility registry lists Meridian Parkway Data Center Owner LLC at 4267 Meridian Pkwy, Aurora, IL 60504 in Aurora, Illinois, with an air permit.

    Aurora, Dupage County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Microsoft Corp-chicago Data Center

    The EPA's facility registry lists Microsoft Corp chicago Data Center at 601 Northwest Avenue, Northlake, IL 60164 in Northlake, Illinois, with air and water permits and a hazardous waste record.

    Northlake, Cook County, IL · Capacity not disclosed · Last verified October 20, 2026

  • proposed Microsoft Sturtevant Data Center

    Sturtevant residents filed a class action lawsuit against Microsoft over noise from a data center facility.

    Sturtevant, Racine County, WI · Capacity not disclosed · Last verified October 20, 2026

  • reported Montgomery Township Former J&J Site Data Center

    A data center project is proposed at the former Johnson & Johnson site in Montgomery Township, NJ, with developer and timeline unclear.

    Montgomery Township, Somerset County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Morgan Stanley Data Center

    The EPA's facility registry lists Morgan Stanley Data Center at 665 Howard Ave, Somerset, NJ 08873 in Somerset, New Jersey, with an air permit.

    Somerset, Somerset County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • reported Mountain Lake Data Center

    A data center was proposed in Mountain Lake, with community members raising concerns about the public notice process.

    Mountain Lake, Cottonwood County, MN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Netrality Data Centers, KC2 (air)

    The EPA's facility registry lists Netrality Data Centers, KC2 (air) at 7801 Nieman Road, Shawnee, KS 66214 in Shawnee, Kansas, with an air permit.

    Shawnee, Johnson County, KS · Capacity not disclosed · Last verified October 20, 2026

  • reported New York GreenCloud Ione data center

    New York GreenCloud Ione data center

    Ione, Amador County, CA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified NJ-1 Data Center

    The EPA's facility registry lists NJ-1 Data Center at 101 Possumtown RD, Piscataway TWP, NJ 08854 in Piscataway TWP, New Jersey, with air and water permits and a hazardous waste record.

    Piscataway, Middlesex County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified NMRD Data Center III, LLC

    The EPA's facility registry lists NMRD Data Center III, LLC, New Mexico, with no permit program listed.

    Sandoval County, NM · Capacity not disclosed · Last verified October 20, 2026

  • reported North Country Colocation Services Massena data center

    North Country Colocation Services Massena data center

    Massena, St. Lawrence County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Novva Data Centers

    The EPA's facility registry lists Novva Data Centers at 3399 Peru DR, Sparks, NV 89434 in Sparks, Nevada, with no permit program listed.

    Storey County, NV · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified NT & Sa La Data Center

    The EPA's facility registry lists NT & Sa La Data Center at 1000 W Temple ST, Los Angeles, CA 90012 in Los Angeles, California, with a water permit.

    Los Angeles, Los Angeles County, CA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified NTT Global Data Centers CH LLC

    The EPA's facility registry lists NTT Global Data Centers CH LLC at 255 Pierce RD, Itasca, IL 60143 in Itasca, Illinois, with an air permit.

    Itasca, Dupage County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified NTT Global Data Centers Hi, LLC

    The EPA's facility registry lists NTT Global Data Centers Hi, LLC at 4050 NE Evergreen RD, Hillsboro, OR 97124 in Hillsboro, Oregon, with air and water permits and a hazardous waste record.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified One Neck Denver Data Center

    The EPA's facility registry lists One Neck Denver Data Center at 8675 Concord Center DR, Englewood, CO 80112 in Englewood, Colorado, with a water permit.

    Douglas County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Oppidan Data Center, MGM

    The EPA's facility registry lists Oppidan Data Center, MGM at 6220 Perimeter Parkway, Montgomery, AL 36116 in Montgomery, Alabama, with a water permit.

    Montgomery, Montgomery County, AL · Capacity not disclosed · Last verified October 20, 2026

  • proposed PNK Group Wisconsin Rapids Data Center

    PNK Group is proposing a data center at a historic paper mill site in Wisconsin Rapids, facing community opposition and holding public information sessions including an open house on September 13 and a final webinar addressing jobs and community benefits.

    Wisconsin Rapids, Wood County, WI · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Prosperity Drive Data Center, LLC

    The EPA's facility registry lists Prosperity Drive Data Center, LLC at 12401 Prosperity DR, Silver Spring, MD 20904 in Silver Spring, Maryland, with an air permit and a hazardous waste record.

    Silver Spring, Montgomery County, MD · Capacity not disclosed · Last verified October 20, 2026

  • reported Rimland Services Evanston data center

    Rimland Services Evanston data center

    Evanston, Cook County, IL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Sabey Corp Seattle

    The EPA's facility registry lists Sabey Corp Seattle at 101 Elliott Ave W Ste 330, Seattle, WA 98119 in Seattle, Washington, with a hazardous waste record.

    Seattle, King County, WA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Sce&g Irmo Data Center

    The EPA's facility registry lists Sce&g Irmo Data Center at Intersection Of Lake Murray BLVD And Old Bush Rive, SC 00000, South Carolina, with a water permit.

    Williamsburg County, SC · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Solar Data Center White Horse Ranch

    The EPA's facility registry lists Solar Data Center White Horse Ranch at 1 Mile South On NM113 From Intersection With I10, Lordsburg, NM 88045 in Lordsburg, New Mexico, with a water permit.

    Lordsburg, Hidalgo County, NM · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified T Mobile USA INC Parsippany Data Center

    The EPA's facility registry lists T Mobile USA INC Parsippany Data Center at 4 Sylvan Way, Parsippany, NJ 07054 in Parsippany, New Jersey, with no permit program listed.

    Parsippany, Morris County, NJ · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified T5 At Portland IV Data Center

    The EPA's facility registry lists T5 At Portland IV Data Center at 4915 NE Starr Boulevard, Hillsboro, OR 97124 in Hillsboro, Oregon, with a water permit.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified October 20, 2026

  • running TierPoint Kansas City - Lenexa Data Center

    TierPoint lists a data center at Kansas City, Kansas among the sites it operates.

    Lenexa, Johnson County, KS · Capacity not disclosed · Last verified October 20, 2026

  • running TierPoint New York , Hawthorne Data Center

    TierPoint lists a data center at New York, New York among the sites it operates.

    Hawthorne, Westchester County, NY · Capacity not disclosed · Last verified October 20, 2026

  • reported Turin Management Ilion data center

    Turin Management Ilion data center

    Ilion, Herkimer County, NY · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified U S Bank Coeur D'alene Data Center

    The EPA's facility registry lists U S Bank Coeur D'alene Data Center at 3700 Seltice Way, Coeur D'alene, ID 83814 in Coeur D'alene, Idaho, with an air permit.

    Coeur D'alene, Kootenai County, ID · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Vantage PH2 And Westhaven PH2

    The EPA's facility registry lists Vantage PH2 And Westhaven PH2 at Berthoud Pkwy And Lakeview Ave Nec, Berthoud, CO 80018 in Berthoud, Colorado, with a water permit.

    Berthoud, Larimer County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Verizon Wireless, Data Center

    The EPA's facility registry lists Verizon Wireless, Data Center at 4323 Arrowswest Drive, Colorado Springs, CO 80907 in Colorado Springs, Colorado, with air and water permits and a hazardous waste record.

    Colorado Springs, El Paso County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Verizon Wireless:shadelands (walnut Creek Data Center)

    The EPA's facility registry lists Verizon Wireless:shadelands (walnut Creek Data Center) at 2770 Shadelands DR, Walnut Creek, CA 94598 in Walnut Creek, California, with no permit program listed.

    Walnut Creek, Contra Costa County, CA · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Viawest INC, Englewood Data Center

    The EPA's facility registry lists Viawest INC, Englewood Data Center at 8636 South Peoria Street, Parker Area, CO 80112 in Parker Area, Colorado, with an air permit.

    Parker, Douglas County, CO · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Visi Data Center / Oneneck IT Solutions, LLC

    The EPA's facility registry lists Visi Data Center / Oneneck IT Solutions, LLC at 10290 70TH Street West, Eden Prairie, MN 55344 in Eden Prairie, Minnesota, with a water permit.

    Eden Prairie, Hennepin County, MN · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Ybor Data Center

    The EPA's facility registry lists Ybor Data Center at 1898 Nuccio Pkwy, Tampa, FL 33605 in Tampa, Florida, with a hazardous waste record.

    Tampa, Hillsborough County, FL · Capacity not disclosed · Last verified October 20, 2026

  • not yet verified Zayo Group, Montana State Data Center Miles City

    The EPA's facility registry lists Zayo Group, Montana State Data Center Miles City at N Of I-94 From Exit 138 7MI W, Miles City, MT 59301 in Miles City, Montana, with a water permit.

    Miles City, Custer County, MT · Capacity not disclosed · Last verified October 20, 2026

  • running Apple Prineville Campus

    Apple operates a large data center campus in Prineville, Oregon, benefiting from Long Term Rural Enterprise Zone tax exemptions that are nearing expiration.

    Prineville, Crook County, OR · 120 MW · Last verified October 19, 2026

  • running DataBank Eagan Data Center

    DataBank planned to retrofit the former 88,000 square foot Taystee Foods building at 3255 Neil Armstrong Boulevard in Eagan into a data center at a cost of approximately $48 to $49 million.

    Eagan, Dakota County, MN · Capacity not disclosed · Last verified October 19, 2026

  • running Meta Prineville Campus

    Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration.

    Prineville, Crook County, OR · 350 MW · Last verified October 19, 2026

  • approved NScale Mason County Data Center

    NScale's data center in Mason County, West Virginia received state certification after months of negotiations, and was among two Mason County projects hailed by Governor Morrisey.

    Mason County, WV · Capacity not disclosed · Last verified October 19, 2026

  • proposed Project Jupiter

    Oracle's Project Jupiter, proposed for Santa Teresa in Doña Ana County, is one of the largest proposed AI data center complexes in the nation and is stalled in permitting amid New Mexico Supreme Court stays on water and air quality permits and broad community opposition.

    Santa Teresa, Doña Ana County, NM · 2.45 GW · Last verified October 19, 2026

  • being built Applied Digital Polaris Forge 2 (Harwood)

    Applied Digital began construction of a 280MW data center in Harwood in September 2025, representing a 3 billion dollar investment; North Dakota Public Service Commission approved a temporary variance for the 110 million dollar power project serving the campus.

    Harwood, Cass County, ND · 280 MW · Last verified October 16, 2026

  • running Applied Digital Polaris Forge 1 (Ellendale)

    Applied Digital completed Phase 1 of Building 2 at Polaris Forge 1 near Ellendale, bringing total live campus capacity to 175MW, with 400MW contracted at full build out under an 11 billion dollar, 15 year agreement with CoreWeave.

    Ellendale, Dickey County, ND · 400 MW · Last verified October 16, 2026

  • running Equinix DE1

    Equinix lists a data center at Centennial, Colorado among the sites it operates.

    Centennial, Arapahoe County, CO · Capacity not disclosed · Last verified October 16, 2026

  • proposed Quantica Broadview Data Center

    Quantica has proposed a large AI data center near Broadview spanning approximately 5,000 acres, with debates over water usage, natural gas power sourcing, and self funded energy capacity.

    Broadview, Yellowstone County, MT · Capacity not disclosed · Last verified October 16, 2026

  • reported AIDEA Mat-Su Industrial Park (Houston)

    The Alaska Department of Natural Resources proposed a noncompetitive sale of over 31 square miles of state land north of Houston to AIDEA for a multi use industrial and energy development district that could include scalable data centers, a logistics hub, and utility corridors.

    Houston, Matanuska-Susitna County, AK · Capacity not disclosed · Last verified October 7, 2026

  • being built Applied Digital Polaris Forge 3 (Oliver County)

    Applied Digital is expanding in North Dakota and eyeing Oliver County for a third data center.

    Oliver County, ND · 430 MW · Last verified October 7, 2026

  • reported DRFortress

    1547 and Harrison Street acquired DRFortress, described as Hawaii's leading carrier neutral data center.

    Honolulu, Honolulu County, HI · Capacity not disclosed · Last verified October 7, 2026

  • cancelled Jersey Avenue Data Center

    A proposed data center on Jersey Avenue in New Brunswick, New Jersey was removed from the redevelopment plan by city council following public backlash and protests.

    New Brunswick, Middlesex County, NJ · Capacity not disclosed · Last verified October 7, 2026

  • reported Rural Nevada Data Center

    A massive data center project in rural Nevada advanced one step closer to approval.

    Storey County, NV · Capacity not disclosed · Last verified October 7, 2026

  • running TierPoint Nashville Data Center

    TierPoint lists a data center at Nashville, Tennessee among the sites it operates.

    Nashville, Davidson County, TN · Capacity not disclosed · Last verified October 7, 2026

  • reported Treasure Coast Surf Park Data Center

    A scrapped Florida surf park site on the Treasure Coast is being considered for redevelopment as a data center with possible retail components.

    Fort Pierce, St. Lucie County, FL · Capacity not disclosed · Last verified October 7, 2026

  • reported University of Michigan / Los Alamos National Laboratory Hyperscale Data Center

    A 220,000 square foot hyperscale data center backed by the University of Michigan and Los Alamos National Laboratory was proposed in an Ypsilanti Township location, drawing opposition from the township which passed a ban on new electrical infrastructure.

    Ypsilanti Township, Washtenaw County, MI · Capacity not disclosed · Last verified October 7, 2026

  • cancelled Boulder City BLM Land Data Center

    A developer withdrew a data center project in Boulder City and signaled plans to move the project to federal land.

    Boulder City, Clark County, NV · 167 MW · Last verified October 6, 2026

  • reported Brookwood Proposed Data Center

    Brookwood residents voiced concerns over a potential data center project in their area, and a town hall on the topic was held.

    Brookwood, Tuscaloosa County, AL · Capacity not disclosed · Last verified October 6, 2026

  • reported Cedar Rapids Third Data Center (Southwest Side)

    Cedar Rapids confirmed a third data center is planned for the southwest side of the city.

    Cedar Rapids, Linn County, IA · Capacity not disclosed · Last verified October 6, 2026

  • reported Delta Forge 1

    Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.

    Boyce, Rapides Parish, LA · 300 MW · Last verified October 6, 2026

  • running Google Fort Wayne data center

    Google lists a data center at Fort Wayne, Indiana among the sites it operates.

    Fort Wayne, Allen County, IN · Capacity not disclosed · Last verified October 6, 2026

  • reported NorthMark Spartanburg County Data Center

    A $2.8,$3 billion NorthMark data center project in Spartanburg County is under construction and faced legal challenges including an injunction request and lawsuit, but the SC Public Service Commission ruled the project is not subject to public power plant regulations.

    Spartanburg County, SC · 450 MW · Last verified October 6, 2026

  • approved Project Taurus

    Colorado Springs City Council scheduled a final hearing for Project Taurus, a controversial proposed data center, after appeals were denied by the Planning Commission and the project moved ahead.

    Colorado Springs, El Paso County, CO · 50 MW · Last verified October 6, 2026

  • waiting on permits Prometheus Hyperscale Natrona County Data Center

    Prometheus Hyperscale proposed a 940 acre, gigawatt scale data center campus in Natrona County, Wyoming, requesting the county bypass state environmental review amid divided commissioner opinion.

    Natrona County, WY · 1.25 GW · Last verified October 6, 2026

  • cancelled Southeast Raleigh data center

    A proposed southeast Raleigh data center was withdrawn following community opposition, though a developer was still pursuing it as of August 21 before the withdrawal was confirmed.

    Raleigh, Wake County, NC · Capacity not disclosed · Last verified October 6, 2026

  • reported T5 Grayslake data center

    T5 and the village of Grayslake are moving forward with a data center development that has received its first permit in what is described as an $18 billion development, while a resident lawsuit is ongoing.

    Grayslake, Lake County, IL · 1.2 GW · Last verified October 6, 2026

  • reported ValorC3 Boise Data Center

    ValorC3 secured a credit facility to fund a 10 MW data center in Boise, Idaho.

    Boise, Ada County, ID · 14 MW · Last verified October 6, 2026

  • reported Ventura County Fairgrounds Data Center

    A data center has been proposed at the Ventura County fairgrounds, drawing opposition from local residents.

    Ventura, Ventura County, CA · Capacity not disclosed · Last verified October 6, 2026

  • running Aligned ATL-01

    Aligned Data Centers lists a data center at Lithia Springs, Georgia among the sites it operates.

    Lithia Springs, Douglas County, GA · Capacity not disclosed · Last verified October 4, 2026

  • running Aligned Data Centers Northlake

    Aligned Data Centers lists 2 data centers at Northlake, Illinois among the sites it operates.

    Northlake, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Aligned IAD-04

    Aligned Data Centers lists a data center at Frederick, Maryland among the sites it operates.

    Frederick, Frederick County, MD · Capacity not disclosed · Last verified October 4, 2026

  • running Aligned ORD-03

    Aligned Data Centers lists a data center at Elk Grove Village, Illinois among the sites it operates.

    Elk Grove Village, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Centersquare Chicago data center

    Centersquare lists a data center at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Cologix Des Moines

    Cologix lists 2 data centers at Des Moines, Iowa among the sites it operates.

    Des Moines, Polk County, IA · Capacity not disclosed · Last verified October 4, 2026

  • running Compass Hoffman Estates campus

    Compass Datacenters lists a data center at Hoffman Estates, Illinois among the sites it operates.

    Hoffman Estates, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running CyrusOne Council Bluffs OCB1

    CyrusOne lists a data center at Council Bluffs, Iowa among the sites it operates.

    Council Bluffs, Pottawattamie County, IA · Capacity not disclosed · Last verified October 4, 2026

  • running CyrusOne Quincy PNW1

    CyrusOne lists a data center at Quincy, Washington among the sites it operates.

    Quincy, Grant County, WA · Capacity not disclosed · Last verified October 4, 2026

  • running Digital Realty Clifton

    Digital Realty lists 2 data centers at Clifton, New Jersey among the sites it operates.

    Clifton, Passaic County, NJ · Capacity not disclosed · Last verified October 4, 2026

  • running Digital Realty El Segundo

    Digital Realty lists 2 data centers at El Segundo, California among the sites it operates.

    El Segundo, Los Angeles County, CA · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix Atlanta

    Equinix lists 2 data centers at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix CH7

    Equinix lists a data center at Westmont, Illinois among the sites it operates.

    Westmont, DuPage County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix Chicago

    Equinix lists 3 data centers at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix DE2

    Equinix lists a data center at Englewood, Colorado among the sites it operates.

    Englewood, Arapahoe County, CO · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix Elk Grove Village

    Equinix lists 2 data centers at Elk Grove Village, Illinois among the sites it operates.

    Elk Grove Village, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix LA7

    Equinix lists a data center at Torrance, California among the sites it operates.

    Torrance, Los Angeles County, CA · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix NY11

    Equinix lists a data center at Carteret, New Jersey among the sites it operates.

    Carteret, Middlesex County, NJ · Capacity not disclosed · Last verified October 4, 2026

  • running Equinix NY13

    Equinix lists a data center at Elmsford, New York among the sites it operates.

    Elmsford, Westchester County, NY · Capacity not disclosed · Last verified October 4, 2026

  • reported Google Bridgeport data center

    Google's data center campus in Bridgeport, Jackson County, Alabama, operating since 2019 on a site of more than 600 acres.

    Bridgeport, Jackson County, AL · Capacity not disclosed · Last verified October 4, 2026

  • reported Google Data Center Pryor

    Google opened a data center in Pryor, Oklahoma approximately 15 years before 2026, and the project is discussed for lessons learned.

    Pryor, Mayes County, OK · Capacity not disclosed · Last verified October 4, 2026

  • running Google Lenoir data center

    Google lists a data center at Lenoir, North Carolina among the sites it operates.

    Lenoir, Caldwell County, NC · Capacity not disclosed · Last verified October 4, 2026

  • running Google Papillion data center

    Google lists a data center at Papillion, Nebraska among the sites it operates.

    Papillion, Sarpy County, NE · Capacity not disclosed · Last verified October 4, 2026

  • running H5 Data Centers Quincy

    H5 Data Centers lists 3 data centers at Quincy, Washington among the sites it operates.

    Quincy, Grant County, WA · Capacity not disclosed · Last verified October 4, 2026

  • running Meta DeKalb Data Center

    Meta lists a data center at DeKalb, Illinois among the sites it operates.

    DeKalb, DeKalb County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running Meta Forest City Data Center

    Meta lists a data center at Forest City, North Carolina among the sites it operates.

    Forest City, Rutherford County, NC · Capacity not disclosed · Last verified October 4, 2026

  • running Meta Huntsville Data Center

    Meta lists a data center at Huntsville, Alabama among the sites it operates.

    Huntsville, Madison County, AL · Capacity not disclosed · Last verified October 4, 2026

  • running Meta Rosemount Data Center

    Meta lists a data center at Rosemount, Minnesota among the sites it operates.

    Rosemount, Dakota County, MN · Capacity not disclosed · Last verified October 4, 2026

  • running Microsoft Mount Pleasant Data Center Campus

    Microsoft completed construction of its first data center facility in Mount Pleasant, Wisconsin, with the AI data center campus now fully operational and plans for additional facilities.

    Mount Pleasant, Racine County, WI · Capacity not disclosed · Last verified October 4, 2026

  • running Novva Colorado Springs data center

    Novva Data Centers lists a data center at Colorado Springs, Colorado among the sites it operates.

    Colorado Springs, El Paso County, CO · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Chicago

    QTS Data Centers lists a data center at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Miami

    QTS Data Centers lists a data center at Miami, Florida among the sites it operates.

    Miami, Miami-Dade County, FL · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Piscataway

    QTS Data Centers lists a data center at Piscataway, New Jersey among the sites it operates.

    Piscataway, Middlesex County, NJ · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Sacramento

    QTS Data Centers lists a data center at Sacramento, California among the sites it operates.

    Sacramento, Sacramento County, CA · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Santa Clara

    QTS Data Centers lists a data center at Santa Clara, California among the sites it operates.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified October 4, 2026

  • running QTS Suwanee 1

    QTS Data Centers lists a data center at Suwanee, Georgia among the sites it operates.

    Suwanee, Gwinnett County, GA · Capacity not disclosed · Last verified October 4, 2026

  • running STACK ATL02

    STACK Infrastructure lists a data center at Lithia Springs, Georgia among the sites it operates.

    Lithia Springs, Douglas County, GA · Capacity not disclosed · Last verified October 4, 2026

  • running TierPoint Oklahoma City Data Centers

    TierPoint lists a data center at Oklahoma City, Oklahoma among the sites it operates.

    Oklahoma City, Oklahoma County, OK · Capacity not disclosed · Last verified October 4, 2026

  • running Vantage Quincy

    Vantage Data Centers lists a data center at Quincy, Washington among the sites it operates.

    Quincy, Grant County, WA · Capacity not disclosed · Last verified October 4, 2026

  • not yet verified Allstate Data Center

    The EPA's facility registry lists Allstate Data Center at 1425 S Dement RD, Rochelle, IL 61068 in Rochelle, Illinois, with an air permit.

    Rochelle, Ogle County, IL · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Amazon Data Services, INC, SFO11

    The EPA's facility registry lists Amazon Data Services, INC, SFO11 at 26415 Corporate Ave, Hayward, CA 94545 in Hayward, California, with a hazardous waste record.

    Hayward, Alameda County, CA · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Dartmouth College Data Center

    The EPA's facility registry lists Dartmouth College Data Center at 56 Etna RD, Lebanon, NH 03766 in Lebanon, New Hampshire, with an air permit.

    Lebanon, Grafton County, NH · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Databank LTD Mci 3 (air)

    The EPA's facility registry lists Databank LTD Mci 3 (air) at 11200 Lakeview Ave, Lenexa, KS 66219 in Lenexa, Kansas, with air and water permits.

    Lenexa, Johnson County, KS · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Edgeconnex Detroit Holdings LLC

    The EPA's facility registry lists Edgeconnex Detroit Holdings LLC at 21005 Lahser RD, Southfield, MI 48033 in Southfield, Michigan, with a hazardous waste record.

    Southfield, Oakland County, MI · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Edgeconnex New Orleans Holdings LLC

    The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.

    Slidell, St. Tammany Parish, LA · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Edgeconnex Sacramento Holdings LLC

    The EPA's facility registry lists Edgeconnex Sacramento Holdings LLC at 10980 Gold Center DR, Rancho Cordova, CA 95670 in Rancho Cordova, California, with a hazardous waste record.

    Rancho Cordova, Sacramento County, CA · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Edgeconnex Tallahassee Holdings LLC

    The EPA's facility registry lists Edgeconnex Tallahassee Holdings LLC at 1531 Commonwealth Business DR, Tallahassee, FL 32303 in Tallahassee, Florida, with a hazardous waste record.

    Tallahassee, Leon County, FL · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Emerson Global Data Center

    The EPA's facility registry lists Emerson Global Data Center at 1704 S Governor RD, Marshalltown, IA 50158 in Marshalltown, Iowa, with an air permit.

    Marshalltown, Marshall County, IA · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Flexential Atl 4 Data Center

    The EPA's facility registry lists Flexential Atl 4 Data Center at 12655 Edison Drive, Alpharetta, GA 30022 in Alpharetta, Georgia, with a water permit.

    Alpharetta, Fulton County, GA · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified HB Fuller Co, Data Center, Arden Hills

    The EPA's facility registry lists HB Fuller Co, Data Center, Arden Hills at 1275 Grey Fox RD, Arden Hills, MN 55112 in Arden Hills, Minnesota, with an air permit.

    Arden Hills, Ramsey County, MN · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified IBM Annapolis Data Center

    The EPA's facility registry lists IBM Annapolis Data Center at 2500 Riva Road, Annapolis, MD 21401 in Annapolis, Maryland, with an air permit and a hazardous waste record.

    Annapolis, Anne Arundel County, MD · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Iws Anderson Data Center Project Phase 2

    The EPA's facility registry lists Iws Anderson Data Center Project Phase 2 at 1649 Pearman Dairy Road, Anderson, SC 29625 in Anderson, South Carolina, with a water permit.

    Anderson, Anderson County, SC · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Medtronic Data Center

    The EPA's facility registry lists Medtronic Data Center at 515 Bielenberg DR, Woodbury, MN 55125 in Woodbury, Minnesota, with a hazardous waste record.

    Woodbury, Washington County, MN · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Oppidan Data Center

    The EPA's facility registry lists Oppidan Data Center at 5341 N. Hanley Road, Berkeley, MO 63134 in Berkeley, Missouri, with a water permit.

    Berkeley, ST. Louis County, MO · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Sabey Umatilla Data Center

    The EPA's facility registry lists Sabey Umatilla Data Center at 31266 Wanapa RD, Umatilla, OR 97882 in Umatilla, Oregon, with a water permit.

    Umatilla, Umatilla County, OR · Capacity not disclosed · Last verified October 3, 2026

  • not yet verified Wal- Mart Stores, INC., East Data Center

    The EPA's facility registry lists Wal- Mart Stores, INC., East Data Center at 805 Moberly Lane, Bentonville, AR 72712 in Bentonville, Arkansas, with air and water permits.

    Bentonville, Benton County, AR · Capacity not disclosed · Last verified October 3, 2026

  • reported Ypsilanti Township / University of Michigan & Los Alamos Data Center

    Ypsilanti Township residents and officials pushed back on a University of Michigan and Los Alamos National Laboratory data center proposed in the township.

    Ypsilanti Township, Washtenaw County, MI · Capacity not disclosed · Last verified October 1, 2026

  • being built Google Michigan City data center

    Google lists a data center at Michigan City, Indiana and says it is being built.

    Michigan City, LaPorte County, IN · Capacity not disclosed · Last verified September 30, 2026

  • reported Amazon Montgomery County data center

    A data center campus Amazon announced for Montgomery County, Missouri, in June 2026.

    Montgomery County, MO · Capacity not disclosed · Last verified September 25, 2026

  • reported Amazon Walla Walla County Data Center

    Amazon held an open house for a proposed data center in Walla Walla County that drew public debate.

    Walla Walla County, WA · Capacity not disclosed · Last verified September 25, 2026

  • reported AVAIO Pulaski County Data Center

    Data center developer AVAIO had an attorney seek a carve out for its project from Pulaski County's data center moratorium.

    Wrightsville, Pulaski County, AR · 1 GW · Last verified September 25, 2026

  • reported Beacon Falls Data Center

    Beacon Falls is considering a data center project it views as an economic opportunity, holding a public meeting on the possibility.

    Beacon Falls, New Haven County, CT · 32 MW · Last verified September 25, 2026

  • reported Bow Data Center (350 MW)

    An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center.

    Bow, Merrimack County, NH · 350 MW · Last verified September 25, 2026

  • reported CyrusOne Aurora CHI1-CHI3

    CyrusOne lists a data center at Aurora, Illinois among the sites it operates.

    Aurora, Kane County, IL · Capacity not disclosed · Last verified September 25, 2026

  • running DataBank San Diego data center

    DataBank lists a data center at San Diego, California among the sites it operates.

    San Diego, San Diego County, CA · 2 MW · Last verified September 25, 2026

  • reported Delaware City Data Center

    A state board upheld the environmental denial of a data center proposed for Delaware City, confirming rejection of the project on environmental grounds; the project was also exempted from new state data center regulations that took effect in March 2026.

    Delaware City, New Castle County, DE · 1.2 GW · Last verified September 25, 2026

  • running Digital Realty LAX10

    Digital Realty lists a data center at Los Angeles, California among the sites it operates.

    Los Angeles, Los Angeles County, CA · Capacity not disclosed · Last verified September 25, 2026

  • running Equinix Secaucus

    Equinix lists 5 data centers at Secaucus, New Jersey among the sites it operates.

    Secaucus, Hudson County, NJ · Capacity not disclosed · Last verified September 25, 2026

  • being built Google Columbia County data center

    Google lists a data center at Columbia County, Georgia and says it is being built.

    Columbia County, GA · Capacity not disclosed · Last verified September 25, 2026

  • reported Hillsboro data center projects (7 in permitting)

    Seven additional data center sites in Hillsboro are under construction or moving through the permitting phase, with 17 enterprise zone applications approved in March 2026 before a tax break moratorium cutoff.

    Hillsboro, Washington County, OR · 36 MW · Last verified September 25, 2026

  • reported Hoffman Estates Data Center

    A developer withdrew a rezoning request for a controversial data center in Hoffman Estates, ending the permitting effort for the site.

    Hoffman Estates, Cook County, IL · Capacity not disclosed · Last verified September 25, 2026

  • reported Imperial Valley AI Data Center

    California's largest AI data center project filed a lawsuit seeking access to 287 million gallons of Colorado River water annually, representing 0.03% of Imperial Valley's supply, amid opposition over agricultural land and jobs concerns.

    Imperial County, CA · Capacity not disclosed · Last verified September 25, 2026

  • reported Inver Grove Heights Data Center

    A data center project in Inver Grove Heights is subject to a lawsuit that could cost taxpayers millions, and a moratorium on data centers was delayed at a contentious city meeting.

    Inver Grove Heights, Dakota County, MN · Capacity not disclosed · Last verified September 25, 2026

  • reported Las Vegas Data Center Expansion

    Las Vegas approved a data center expansion while officials considered the need for future data center regulations.

    Las Vegas, Clark County, NV · Capacity not disclosed · Last verified September 25, 2026

  • reported Lincoln Data Center

    A Lincoln data center prompted construction of a $10 million wastewater line to transport cooling water to a recovery site, with construction beginning in June 2026.

    Lincoln, Lancaster County, NE · Capacity not disclosed · Last verified September 25, 2026

  • reported Livingston Parish Data Center

    Rumors are circulating about a data center coming to Livingston Parish, with the parish president denying having signed an NDA related to the project.

    Livingston Parish, LA · Capacity not disclosed · Last verified September 25, 2026

  • running Meta Gallatin Data Center

    Meta lists a data center at Gallatin, Tennessee among the sites it operates.

    Gallatin, Sumner County, TN · 300 MW · Last verified September 25, 2026

  • being built Meta Louisiana data center

    Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.

    Richland Parish, LA · 5 GW · Last verified September 25, 2026

  • reported Morris Data Center (opposition group)

    A data center opposition group in Morris plans to hold several community meetings regarding a proposed data center.

    Morris, Grundy County, IL · 1 GW · Last verified September 25, 2026

  • reported Nebius AI Data Center (Vineland)

    Vineland city council approved a DataOne expansion for a Nebius AI data center, and the planning board separately approved an adjustment to Phase 2, though the city also issued a stop work order to parts of the facility and accused it of operating natural gas generators without a permit.

    Vineland, Cumberland County, NJ · 300 MW · Last verified September 25, 2026

  • reported Nottingham Data Center (unnamed developer)

    A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote.

    Nottingham, Rockingham County, NH · Capacity not disclosed · Last verified September 25, 2026

  • reported Piedmont Area Data Center

    A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option.

    Piedmont, Canadian County, OK · Capacity not disclosed · Last verified September 25, 2026

  • reported Rapid City Data Center

    A data center project in Rapid City is moving forward with concerns raised about heat and resource impacts.

    Rapid City, Pennington County, SD · Capacity not disclosed · Last verified September 25, 2026

  • reported SkyBox Data Center at Cox Ranch

    SkyBox Data Center is proposed at the former Cox Ranch near Cheyenne, with developers presenting commitments at a Cheyenne City Council work session amid resident concerns.

    Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified September 25, 2026

  • reported SpaceXAI Memphis data centers

    SpaceXAI is expanding data center operations in Memphis, with Elon Musk confirming a fourth facility and the company adding another center in Whitehaven while removing gas turbines deemed illegal.

    Memphis, Shelby County, TN · Capacity not disclosed · Last verified September 25, 2026

  • reported St. Louis Midtown Data Center

    A proposed Midtown data center in St. Louis prompted residents and organizations to file a lawsuit against the project.

    St. Louis, St. Louis city, MO · 300 MW · Last verified September 25, 2026

  • reported Tucker County Data Center

    Advocates in West Virginia are seeking disclosure of land ownership for a data center development proposed in Tucker County.

    Tucker County, WV · Capacity not disclosed · Last verified September 25, 2026

  • being built Vantage Port Washington Data Center

    A Vantage data center in Port Washington faces disputes over energy cost allocation, a state regulatory rejection of its power line project, and an environmental lawsuit filed against the Wisconsin DNR over the project's environmental review.

    Port Washington, Ozaukee County, WI · 902 MW · Last verified September 25, 2026

  • reported Westover Proposed Data Center

    A proposed data center in Westover prompted a town hall and a 6 month moratorium approved by the city.

    Westover, Shelby County, AL · Capacity not disclosed · Last verified September 25, 2026

  • reported Bow Data Center

    Bow residents are divided over a possible data center, with debate centering on tax relief benefits versus environmental concerns.

    Bow, Merrimack County, NH · Capacity not disclosed · Last verified September 24, 2026

  • reported Butte-Silver Bow Data Center (ballot initiative)

    A citizen group in Butte Silver Bow is pursuing a ballot initiative on data centers and has appealed a local judge's ruling to the Montana Supreme Court.

    Butte, Silver Bow County, MT · Capacity not disclosed · Last verified September 24, 2026

  • being built Hyperscale Data Dowagiac AI Data Center

    Hyperscale Data ceased Bitcoin mining at its 617,000 square foot Dowagiac, Michigan facility on September 1, 2026, and is converting it for a California neocloud customer deploying 20MW in Q4 2026 with potential to scale to 52MW under a 10 year lease.

    Dowagiac, Cass County, MI · 52 MW · Last verified September 23, 2026

  • waiting on permits Oakline at Mill Creek

    Verrus proposes a data center campus of three buildings and a substation on about 75 acres at the Mill Creek Corporate Center in southeast Salem, with a land use application filed on July 31, 2026 and a city moratorium initiated on August 3, 2026.

    Salem, Marion County, OR · Capacity not disclosed · Last verified September 22, 2026

  • reported xAI Southaven turbine site

    A gas turbine yard at 2875 Stanton Road South in Southaven, DeSoto County, that powers xAI's Colossus 1 and Colossus 2 data centers across the state line in Memphis, recorded separately there. Its own record by decision of September 10, 2026. The turbine count is not disclosed in the fact grid; each figure lives on its dated event with its source and the alleged flag.

    Southaven, DeSoto County, MS · Capacity not disclosed · Last verified September 21, 2026

  • running Meta Kuna Data Center

    Meta's Kuna data center, built for AI workloads, is now operational in Idaho.

    Kuna, Ada County, ID · Capacity not disclosed · Last verified September 19, 2026

  • reported Monolith Data Center Expansion (Hallam)

    Monolith is proposing a data center expansion near Hallam, Nebraska, with landowners facing decisions about selling and residents attending a town hall to discuss the project.

    Hallam, Lancaster County, NE · Capacity not disclosed · Last verified September 18, 2026

  • reported Project River

    Project River proposes a $7.3 billion data center investment in Bradley County, Tennessee, projected to create 2,600 jobs.

    Bradley County, TN · Capacity not disclosed · Last verified September 18, 2026

  • reported AI Data Center near Mar-a-Lago

    A large AI data center is planned near Mar-a-Lago in Palm Beach County, with environmental advocates raising concerns about potential impacts to the Everglades.

    Palm Beach County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Aligned PDX-01

    Aligned Data Centers lists a data center at Hillsboro, Oregon among the sites it operates.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified September 17, 2026

  • reported Amazon / AWS Data Center Campus at Calvert Cliffs

    Amazon/AWS planned a data center campus adjacent to the Calvert Cliffs nuclear plant in Calvert County, Maryland, but withdrew from the project amid community and political opposition.

    Calvert County, MD · 500 MW · Last verified September 17, 2026

  • reported Amazon Canton Data Centers

    Amazon operates multiple data centers in Canton, Madison County, and is involved in a tax valuation dispute with the county while also planning a $25 billion expansion in Mississippi creating 2,000 jobs.

    Canton, Madison County, MS · Capacity not disclosed · Last verified September 17, 2026

  • reported Amazon Clinton Data Center

    Amazon held a ribbon cutting ceremony marking the opening of a new data center in Clinton, Mississippi in June 2026.

    Clinton, Hinds County, MS · Capacity not disclosed · Last verified September 17, 2026

  • running Amazon data centers in Lower Umatilla Basin

    Amazon operates 14 hyperscale data centers within a 30 mile stretch along the Columbia River in the Lower Umatilla Basin, raising air quality concerns over backup diesel generator emissions.

    Hermiston, Umatilla County, OR · Capacity not disclosed · Last verified September 17, 2026

  • running Amazon Eastern Oregon Data Centers

    Amazon operates data centers in Morrow County, Oregon that went online beginning in 2011 and have been linked to nitrate groundwater contamination and a cluster of rare health conditions in the surrounding community.

    Boardman, Morrow County, OR · Capacity not disclosed · Last verified September 17, 2026

  • reported Amazon Web Services Louisiana data centers

    Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.

    Shreveport, Caddo Parish, LA · Capacity not disclosed · Last verified September 17, 2026

  • reported Amentum / DC Blox Savannah River AI Data Center

    The Department of Energy selected Amentum and DC Blox to develop a behind the meter AI data center at the Savannah River site in Aiken County, South Carolina.

    Aiken County, SC · Capacity not disclosed · Last verified September 17, 2026

  • reported Andover Data Center

    A community meeting in Andover, New Jersey about a proposed data center turned violent amid public opposition.

    Andover, Sussex County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • reported Ashland AK Steel Property Data Center

    Ashland, Kentucky is considering eminent domain to acquire the AK Steel property for a data center proposal.

    Ashland, Boyd County, KY · Capacity not disclosed · Last verified September 17, 2026

  • reported Aurora largest data center facility

    Colorado's largest data center facility was preparing to open in Aurora as the city considered a moratorium on data center development.

    Aurora, Arapahoe County, CO · Capacity not disclosed · Last verified September 17, 2026

  • reported Baltimore City Data Center (proposed bill)

    A Baltimore City data center bill faced backlash from activists who called it a huge red flag.

    Baltimore, Baltimore city, MD · Capacity not disclosed · Last verified September 17, 2026

  • reported Benton County Data Center

    A data center has been proposed in Benton County, Missouri, facing community opposition and a moratorium dispute being litigated in a Benton County courtroom.

    Benton County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported Boston Neighborhood Data Center

    A data center described by neighbors as a towering dungeon is proposed in a Boston neighborhood, drawing local opposition.

    Boston, Suffolk County, MA · Capacity not disclosed · Last verified September 17, 2026

  • cancelled Boxminer.io La Pine Industrial Park

    Boxminer.io proposed a 20 megawatt data center on approximately 19.5 to 20 acres at the La Pine Industrial Park on Reed Road, which La Pine City Council unanimously voted to reject on May 27, 2026 after strong public opposition.

    La Pine, Deschutes County, OR · 20 MW · Last verified September 17, 2026

  • reported Burgin Data Center

    Residents of Burgin spoke out on a proposed data center development.

    Burgin, Mercer County, KY · Capacity not disclosed · Last verified September 17, 2026

  • reported Caddo Parish Data Center

    A data center project in Caddo Parish is moving forward with construction after parish commissioners rejected a moratorium step.

    Caddo Parish, LA · Capacity not disclosed · Last verified September 17, 2026

  • reported Callaway County Data Center

    A proposed data center in Callaway County hosted an open house to inform the public about the development.

    Callaway County, MO · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Albuquerque data center

    Centersquare lists a data center at Albuquerque, New Mexico among the sites it operates.

    Albuquerque, Bernalillo County, NM · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Atlanta data center

    Centersquare lists a data center at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Boston data center

    Centersquare lists a data center at Boston, Massachusetts among the sites it operates.

    Boston, Suffolk County, MA · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Denver data center

    Centersquare lists a data center at Denver, Colorado among the sites it operates.

    Denver, Denver County, CO · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Los Angeles data center

    Centersquare lists a data center at Los Angeles, California among the sites it operates.

    Los Angeles, Los Angeles County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Minneapolis data center

    Centersquare lists a data center at Minneapolis, Minnesota among the sites it operates.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Seattle data center

    Centersquare lists a data center at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running Centersquare Tampa data center

    Centersquare lists a data center at Tampa, Florida among the sites it operates.

    Tampa, Hillsborough County, FL · Capacity not disclosed · Last verified September 17, 2026

  • reported Cheyenne $1.2 Billion Data Center Campus

    A $1.2 billion data center campus is under construction in Cheyenne, Wyoming.

    Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified September 17, 2026

  • reported Chicago Quantum Park

    Locals rallied against a Chicago quantum park development and the company committed to not including a data center.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • reported Claremore Data Center

    A data center project in Claremore, Oklahoma advanced with major community commitments while also prompting community concerns addressed by the city.

    Claremore, Rogers County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported Clarksville Data Center

    A data center plan in Clarksville includes 40 natural gas turbines and is associated with a multi billion dollar bond that a community group is petitioning to repeal.

    Clarksville, Johnson County, AR · Capacity not disclosed · Last verified September 17, 2026

  • running Cologix Jacksonville

    Cologix lists 2 data centers at Jacksonville, Florida among the sites it operates.

    Jacksonville, Duval County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Cologix LAK1

    Cologix lists a data center at Lakeland, Florida among the sites it operates.

    Lakeland, Polk County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Cologix Minneapolis

    Cologix lists 9 data centers at Minneapolis, Minnesota among the sites it operates.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 17, 2026

  • reported Compass Datacenters Meridian

    Compass Datacenters partnered with Meridian Community College to launch Mississippi's first data center workforce training program.

    Meridian, Lauderdale County, MS · Capacity not disclosed · Last verified September 17, 2026

  • being built Compass Red Oak campus

    Compass Datacenters lists a data center at Red Oak, Texas and says it is being built.

    Red Oak, Ellis County, TX · Capacity not disclosed · Last verified September 17, 2026

  • reported Crusoe Cheyenne Data Center (Project Jade)

    Crusoe paused and subsequently withdrew from Project Jade, a 1.8 GW data center project in Cheyenne, Wyoming, at the request of its customer.

    Cheyenne, Laramie County, WY · 1.8 GW · Last verified September 17, 2026

  • reported CyrusOne Durham DUR1-DUR2

    CyrusOne lists a data center at Durham, North Carolina among the sites it operates.

    Durham, Durham County, NC · Capacity not disclosed · Last verified September 17, 2026

  • running CyrusOne Florence CIN6

    CyrusOne lists a data center at Florence, Kentucky among the sites it operates.

    Florence, Boone County, KY · Capacity not disclosed · Last verified September 17, 2026

  • running CyrusOne Norwalk NYM5

    CyrusOne lists a data center at Norwalk, Connecticut among the sites it operates.

    Norwalk, Western Connecticut Planning Region County, CT · Capacity not disclosed · Last verified September 17, 2026

  • running CyrusOne Somerset NYM1

    CyrusOne lists a data center at Somerset, New Jersey among the sites it operates.

    Somerset, Somerset County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running CyrusOne Totowa NYM2

    CyrusOne lists a data center at Totowa, New Jersey among the sites it operates.

    Totowa, Passaic County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running CyrusOne Wappingers Falls NYM7

    CyrusOne lists a data center at Wappingers Falls, New York among the sites it operates.

    Wappingers Falls, Dutchess County, NY · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center Edgerton

    A proposed data center in Edgerton, Kansas has prompted citizen petitions for a ban and subsequent litigation by the city against petition organizers.

    Edgerton, Johnson County, KS · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center El Dorado

    Citizens in El Dorado, Kansas petitioned to ban data centers and a judge ruled in favor of the petition.

    El Dorado, Butler County, KS · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center in Woods of Smithfield

    An energy intensive data center has been proposed for the wooded area of Smithfield, Rhode Island, with no developer or capacity details named.

    Smithfield, Providence County, RI · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center Leavenworth

    A massive data center proposed in Leavenworth, Kansas has drawn organized community protest.

    Leavenworth, Leavenworth County, KS · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center near Hallam (unnamed developers)

    Unnamed data center developers are eyeing land near Hallam, with landowners facing choices about the proposed project.

    Hallam, Lancaster County, NE · Capacity not disclosed · Last verified September 17, 2026

  • reported Data center near Seneca Lake, Geneva

    An AI data center dispute came to Geneva near Seneca Lake in New York, with a statewide opposition tour also addressing a facility at Seneca Lake in the Finger Lakes region.

    Geneva, Ontario County, NY · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center near Tuscaloosa

    A data center proposed near Tuscaloosa drew organized resident opposition according to AL.com.

    Tuscaloosa, Tuscaloosa County, AL · Capacity not disclosed · Last verified September 17, 2026

  • reported Data Center (South Brunswick / Princeton area)

    South Brunswick neighbors lost an initial court round against a data center in the Princeton area and launched an appeal of the decision.

    South Brunswick, Middlesex County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Atlanta data center

    DataBank lists a data center at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Boston data center

    DataBank lists a data center at Boston, Massachusetts among the sites it operates.

    Boston, Suffolk County, MA · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Chicago data center

    DataBank lists a data center at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Denver data center

    DataBank lists a data center at Denver, Colorado among the sites it operates.

    Denver, Denver County, CO · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Indianapolis data center

    DataBank lists a data center at Indianapolis, Indiana among the sites it operates.

    Indianapolis, Marion County, IN · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Irvine data center

    DataBank lists a data center at Irvine, California among the sites it operates.

    Irvine, Orange County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Kansas City data center

    DataBank lists a data center at Kansas City, Missouri among the sites it operates.

    Kansas City, Jackson County, MO · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Las Vegas data center

    DataBank lists a data center at Las Vegas, Nevada among the sites it operates.

    Las Vegas, Clark County, NV · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Los Angeles data center

    DataBank lists a data center at Los Angeles, California among the sites it operates.

    Los Angeles, Los Angeles County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Memphis data center

    DataBank lists a data center at Memphis, Tennessee among the sites it operates.

    Memphis, Shelby County, TN · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Miami data center

    DataBank lists a data center at Miami, Florida among the sites it operates.

    Miami, Miami-Dade County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Seattle data center

    DataBank lists a data center at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • reported DC Blox Montgomery data center

    A DC Blox data center planned at Interstate Industrial Park in Montgomery, Alabama.

    Montgomery, Montgomery County, AL · Capacity not disclosed · Last verified September 17, 2026

  • reported DC BLOX Nashville Zoo data center

    DC BLOX purchased land next to the Nashville Zoo for a data center, faced a metro permit freeze, sued Metro Nashville, and Metro Council approved eminent domain to acquire the site.

    Nashville, Davidson County, TN · Capacity not disclosed · Last verified September 17, 2026

  • reported Decatur Data Center

    Residents of Decatur raised concerns about a data center project at a town hall meeting.

    Decatur, Macon County, IL · Capacity not disclosed · Last verified September 17, 2026

  • reported DeepGreen Cook Inlet Underwater Data Center

    Delaware based DeepGreen Cook Inlet SPV LLC filed a FERC preliminary permit application for a 100 megawatt underwater AI data center campus in Cook Inlet west of Nikiski, powered by approximately 350 marine hydrokinetic tidal turbines across roughly 1,650 acres, with FERC identifying deficiencies in the application and state officials and environmental groups raising opposition.

    Nikiski, Kenai Peninsula Borough, AK · 100 MW · Last verified September 17, 2026

  • reported DeepGreen Western Passage Underwater AI Data Center

    DeepGreen proposed an underwater AI data center off the coast of Eastport, scaled down to 15 MW and a 27.1 acre active infrastructure footprint with 16 turbines in Phase I, and filed a 48 month preliminary permit application with FERC in February 2026, though Eastport enacted a 180 day moratorium on the project in August 2026.

    Eastport, Washington County, ME · 15 MW · Last verified September 17, 2026

  • reported Digi Power X North Tonawanda

    Digi Power X, formerly Digihost, runs a crypto mining site with a 60 MW gas fired peaker plant at 1070 Erie Avenue in North Tonawanda; residents filed a class action in the Western District of New York in 2026 and the city's crypto mining moratorium blocks a proposed pivot to AI computing.

    North Tonawanda, Niagara County, NY · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Atlanta

    Digital Realty lists 3 data centers at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Burbank

    Digital Realty lists 2 data centers at Burbank, California among the sites it operates.

    Burbank, Los Angeles County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Charlotte

    Digital Realty lists 2 data centers at Charlotte, North Carolina among the sites it operates.

    Charlotte, Mecklenburg County, NC · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Chicago

    Digital Realty lists 2 data centers at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Elk Grove Village

    Digital Realty lists 3 data centers at Elk Grove Village, Illinois among the sites it operates.

    Elk Grove Village, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Franklin Park

    Digital Realty lists 3 data centers at Franklin Park, Illinois among the sites it operates.

    Franklin Park, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Hillsboro

    Digital Realty lists 3 data centers at Hillsboro, Oregon among the sites it operates.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Miami

    Digital Realty lists 2 data centers at Miami, Florida among the sites it operates.

    Miami, Miami-Dade County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Needham

    Digital Realty lists 2 data centers at Needham, Massachusetts among the sites it operates.

    Needham, Norfolk County, MA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Oakland

    Digital Realty lists 2 data centers at Oakland, California among the sites it operates.

    Oakland, Alameda County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty ORD23

    Digital Realty lists a data center at Northlake, Illinois among the sites it operates.

    Northlake, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Piscataway

    Digital Realty lists 3 data centers at Piscataway, New Jersey among the sites it operates.

    Piscataway, Middlesex County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty San Francisco

    Digital Realty lists 2 data centers at San Francisco, California among the sites it operates.

    San Francisco, San Francisco County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Santa Clara

    Digital Realty lists 12 data centers at Santa Clara, California among the sites it operates.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Digital Realty Seattle

    Digital Realty lists 2 data centers at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • reported Downtown Kansas City Data Center

    A downtown Kansas City, Missouri data center proposal sparked concern from neighborhood residents in July 2026.

    Kansas City, Jackson County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported Eastport Underwater Data Center

    Residents are seeking a formal role in the federal review process as Eastport considers a ban on an underwater data center project.

    Eastport, Washington County, ME · Capacity not disclosed · Last verified September 17, 2026

  • reported Eaton Corp. North Little Rock Manufacturing Site

    Eaton Corp. selected North Little Rock for a $242 million data center infrastructure manufacturing site expected to employ 1,200 workers.

    North Little Rock, Pulaski County, AR · Capacity not disclosed · Last verified September 17, 2026

  • reported Eatonville AI Data Center

    An AI data center project in Eatonville, Florida is under local review as the town weighs new penalties and protections related to the development.

    Eatonville, Orange County, FL · Capacity not disclosed · Last verified September 17, 2026

  • reported El Reno Bitcoin Mining Data Center

    A massive water leak in El Reno, Oklahoma was traced to a Bitcoin mining data center facility.

    El Reno, Canadian County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported Elk River Data Center

    A proposed data center in Elk River faced resident opposition and was effectively blocked after the city rejected changing zoning rules to allow data centers.

    Elk River, Sherburne County, MN · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix BO2

    Equinix lists a data center at Billerica, Massachusetts among the sites it operates.

    Billerica, Middlesex County, MA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix El Segundo

    Equinix lists 2 data centers at El Segundo, California among the sites it operates.

    El Segundo, Los Angeles County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix LA1

    Equinix lists a data center at Los Angeles, California among the sites it operates.

    Los Angeles, Los Angeles County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix MI3

    Equinix lists a data center at Boca Raton, Florida among the sites it operates.

    Boca Raton, Palm Beach County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix MI6

    Equinix lists a data center at Doral, Florida among the sites it operates.

    Doral, Miami-Dade County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix Miami

    Equinix lists 2 data centers at Miami, Florida among the sites it operates.

    Miami, Miami-Dade County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix NY1

    Equinix lists a data center at Newark, New Jersey among the sites it operates.

    Newark, Essex County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix NY7

    Equinix lists a data center at North Bergen, New Jersey among the sites it operates.

    North Bergen, Hudson County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix San Jose

    Equinix lists 6 data centers at San Jose, California among the sites it operates.

    San Jose, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix Santa Clara

    Equinix lists 4 data centers at Santa Clara, California among the sites it operates.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix SE4

    Equinix lists a data center at Kent, Washington among the sites it operates.

    Kent, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix Seattle

    Equinix lists 2 data centers at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix SV4

    Equinix lists a data center at Sunnyvale, California among the sites it operates.

    Sunnyvale, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Equinix SV8

    Equinix lists a data center at Palo Alto, California among the sites it operates.

    Palo Alto, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • reported Evanston Ranchland Data Center

    A 1.25 GW data center was approved on ranchland near Evanston, Wyoming.

    Evanston, Uinta County, WY · 1.25 GW · Last verified September 17, 2026

  • reported Falling Waters Data Center

    A tax analysis report on the $10 billion Falling Waters data center project shows the project generates millions in new tax revenue every year.

    Falling Waters, Berkeley County, WV · Capacity not disclosed · Last verified September 17, 2026

  • reported Fluidstack Sullivan County data center

    Fluidstack shared details of a planned data center in Sullivan County, Indiana.

    Sullivan County, IN · Capacity not disclosed · Last verified September 17, 2026

  • cancelled Former Star Tribune Printing Plant Data Center

    Developers proposed a data center at the former Star Tribune printing plant in the North Loop neighborhood of Minneapolis, drawing organized resident opposition at community meetings.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 17, 2026

  • reported Frederick County Data Center Construction Projects

    Frederick County scheduled open houses about data center construction projects under consideration in the county.

    Frederick County, MD · Capacity not disclosed · Last verified September 17, 2026

  • reported Frederick County Data Center Expansion

    A Frederick County data center expansion is the subject of a referendum challenge that was shut down by the Maryland Supreme Court, with residents expressing concern about the county becoming a new data center hub.

    Frederick County, MD · Capacity not disclosed · Last verified September 17, 2026

  • reported Frederick Data Center Campus (community benefits agreement)

    Frederick secured a $110 million community benefits agreement related to the data center campus project.

    Frederick, Frederick County, MD · Capacity not disclosed · Last verified September 17, 2026

  • reported Frederick Data Center Campus

    The city of Frederick secured a $110 million community benefits agreement for a data center campus, though a Maryland Supreme Court ruling blocked a related referendum.

    Frederick, Frederick County, MD · Capacity not disclosed · Last verified September 17, 2026

  • reported Fremont County Data Center

    A data center plan in Fremont County drew attention to the county's lax zoning laws.

    Fremont County, WY · Capacity not disclosed · Last verified September 17, 2026

  • approved Global AI data center (Weld County)

    Weld County Commissioners prepared to vote on a Global AI data center permit, and the county opened an investigation into the facility for three violations.

    Weld County, CO · Capacity not disclosed · Last verified September 17, 2026

  • reported Google Barber County Data Center

    Barber County commissioners approved an agreement with Google for a data center project on August 31, 2026.

    Barber County, KS · Capacity not disclosed · Last verified September 17, 2026

  • running Google Berkeley County data center

    Google lists a data center at Berkeley County, South Carolina among the sites it operates.

    Berkeley County, SC · Capacity not disclosed · Last verified September 17, 2026

  • being built Google Cedar Rapids data center

    Google lists a data center at Cedar Rapids, Iowa and says it is being built.

    Cedar Rapids, Linn County, IA · Capacity not disclosed · Last verified September 17, 2026

  • running Google Council Bluffs data center

    Google lists a data center at Council Bluffs, Iowa among the sites it operates.

    Council Bluffs, Pottawattamie County, IA · Capacity not disclosed · Last verified September 17, 2026

  • being built Google Dorchester County data center

    Google lists a data center at Dorchester County, South Carolina and says it is being built.

    Dorchester County, SC · Capacity not disclosed · Last verified September 17, 2026

  • running Google Douglas County data center

    Google lists a data center at Douglas County, Georgia among the sites it operates.

    Douglas County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running Google Henderson data center

    Google lists a data center at Henderson, Nevada among the sites it operates.

    Henderson, Clark County, NV · Capacity not disclosed · Last verified September 17, 2026

  • proposed Google Hermantown Data Center

    Google proposed a data center in Hermantown, northeast Minnesota, which it subsequently scaled back in scope while conducting community outreach events; the Duluth Chamber of Commerce endorsed the project.

    Hermantown, St. Louis County, MN · Capacity not disclosed · Last verified September 17, 2026

  • not yet verified Google Kansas City data center

    Google lists a data center at Kansas City, Missouri and says it is being built.

    Kansas City, Jackson County, MO · Capacity not disclosed · Last verified September 17, 2026

  • being built Google LaGrange data center

    Google lists a data center at LaGrange, Georgia and says it is being built.

    LaGrange, Troup County, GA · Capacity not disclosed · Last verified September 17, 2026

  • reported Google Lincoln Data Center

    Google shared an update on its data center project in Lincoln, Nebraska.

    Lincoln, Lancaster County, NE · Capacity not disclosed · Last verified September 17, 2026

  • running Google Montgomery County data center

    Google lists a data center at Montgomery County, Tennessee among the sites it operates.

    Montgomery County, TN · Capacity not disclosed · Last verified September 17, 2026

  • not yet verified Google Morgan County data center

    Google lists a data center at Morgan County, Indiana and says it is being built.

    Morgan County, IN · Capacity not disclosed · Last verified September 17, 2026

  • not yet verified Google Muskogee County data center

    Google lists a data center at Muskogee County, Oklahoma and says it is being built.

    Muskogee County, OK · Capacity not disclosed · Last verified September 17, 2026

  • being built Google New Florence data center

    Google lists a data center at New Florence, Missouri and says it is being built.

    New Florence, Montgomery County, MO · Capacity not disclosed · Last verified September 17, 2026

  • running Google Omaha data center

    Google lists a data center at Omaha, Nebraska among the sites it operates.

    Omaha, Douglas County, NE · Capacity not disclosed · Last verified September 17, 2026

  • proposed Google Pine Island Data Center

    Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand.

    Pine Island, Goodhue County, MN · Capacity not disclosed · Last verified September 17, 2026

  • reported Google Putnam Data Center

    Google plans a data center in Putnam County, West Virginia and plans to source solar power for it through a partnership with MN8 and Eos Energy on a West Virginia solar and storage project.

    Putnam County, WV · Capacity not disclosed · Last verified September 17, 2026

  • reported Google Salix Data Center

    Google is considering a data center in Salix, Iowa and created a public website to provide information and updates to the community about the potential project.

    Salix, Woodbury County, IA · Capacity not disclosed · Last verified September 17, 2026

  • being built Google Stillwater data center

    Google lists a data center at Stillwater, Oklahoma and says it is being built.

    Stillwater, Payne County, OK · Capacity not disclosed · Last verified September 17, 2026

  • running Google Storey County data center

    Google lists a data center at Storey County, Nevada among the sites it operates.

    Storey County, NV · Capacity not disclosed · Last verified September 17, 2026

  • running Google The Dalles data center

    Google lists a data center at The Dalles, Oregon among the sites it operates.

    The Dalles, Wasco County, OR · Capacity not disclosed · Last verified September 17, 2026

  • reported Grady County Data Center

    Landowners in Grady County, Oklahoma raised concerns over a proposed data center.

    Grady County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported Grand Island Data Center

    A data center in east Grand Island was nearing completion as of June 2026, with the city utilities director commenting on its impact.

    Grand Island, Hall County, NE · Capacity not disclosed · Last verified September 17, 2026

  • reported Grant County Data Center

    A worldwide company is planning a data center in Grant County, Arkansas, with no developer name confirmed.

    Grant County, AR · Capacity not disclosed · Last verified September 17, 2026

  • reported Greensparc Petersburg Data Center

    Greensparc proposed converting approximately 1,500 sq ft of the former Ocean Beauty Seafoods canning plant on the Petersburg waterfront into a small scale edge data center using the property's existing 2MW transformer and a closed loop cooling system.

    Petersburg, Petersburg Borough, AK · 2 MW · Last verified September 17, 2026

  • running H5 Albuquerque

    H5 Data Centers lists a data center at Albuquerque, New Mexico among the sites it operates.

    Albuquerque, Bernalillo County, NM · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Atlanta

    H5 Data Centers lists a data center at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Charlotte

    H5 Data Centers lists a data center at Charlotte, North Carolina among the sites it operates.

    Charlotte, Mecklenburg County, NC · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Chicago

    H5 Data Centers lists a data center at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Data Centers Buffalo

    H5 Data Centers lists 3 data centers at Buffalo, New York among the sites it operates.

    Buffalo, Erie County, NY · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Denver

    H5 Data Centers lists a data center at Denver, Colorado among the sites it operates.

    Denver, Denver County, CO · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Minneapolis

    H5 Data Centers lists a data center at Minneapolis, Minnesota among the sites it operates.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Omaha

    H5 Data Centers lists a data center at Omaha, Nebraska among the sites it operates.

    Omaha, Douglas County, NE · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Portland

    H5 Data Centers lists a data center at Portland, Oregon among the sites it operates.

    Portland, Multnomah County, OR · Capacity not disclosed · Last verified September 17, 2026

  • running H5 San Luis Obispo

    H5 Data Centers lists a data center at San Luis Obispo, California among the sites it operates.

    San Luis Obispo, San Luis Obispo County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Seattle

    H5 Data Centers lists a data center at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running H5 St. Louis

    H5 Data Centers lists a data center at St. Louis, Missouri among the sites it operates.

    St. Louis, St. Louis city, MO · Capacity not disclosed · Last verified September 17, 2026

  • running H5 Tampa

    H5 Data Centers lists a data center at Tampa, Florida among the sites it operates.

    Tampa, Hillsborough County, FL · Capacity not disclosed · Last verified September 17, 2026

  • reported Hilton Head Area Data Centers

    Two data centers are planned near the Hilton Head area in Beaufort County, South Carolina, with questions raised about potential impacts on local power rates.

    Beaufort County, SC · Capacity not disclosed · Last verified September 17, 2026

  • reported Historic Charlotte building site data center

    A historic Charlotte building was demolished in a day to clear the path for a data center development.

    Charlotte, Mecklenburg County, NC · Capacity not disclosed · Last verified September 17, 2026

  • reported Holyoke Paper Mill Data Center

    A developer plans a $200 million data center at a former Holyoke paper mill, while city councilors are considering a ban on data centers.

    Holyoke, Hampden County, MA · Capacity not disclosed · Last verified September 17, 2026

  • reported Indiantown Data Center

    A data center debate in Indiantown, Florida resulted in the termination of the village manager, reflecting serious local conflict over the project.

    Indiantown, Martin County, FL · Capacity not disclosed · Last verified September 17, 2026

  • reported Jackson Lake Hico Data Center

    A data center proposed near Lake Hico in Jackson is under judicial scrutiny following a moratorium and controversy over city officials' discussions about the site.

    Jackson, Hinds County, MS · Capacity not disclosed · Last verified September 17, 2026

  • reported Janesville AI Data Center

    Janesville has become a battleground over AI data center development, with community conflict over proposed projects in the city.

    Janesville, Rock County, WI · Capacity not disclosed · Last verified September 17, 2026

  • reported Jay Data Center at Former Paper Mill

    A developer proposed a data center at a former paper mill site in Jay, Maine, which cleared a legislative hurdle in April 2026 but was subsequently put on hold indefinitely after the company withdrew from the project in June 2026.

    Jay, Franklin County, ME · 82 MW · Last verified September 17, 2026

  • reported Jay Data Center

    The town of Jay approved a town meeting warrant backing a data center plan.

    Jay, Franklin County, ME · Capacity not disclosed · Last verified September 17, 2026

  • reported Joplin Data Center

    A data center project near Joplin, Missouri prompted opponents to meet with an attorney to discuss available options for opposing the development.

    Joplin, Jasper County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported Kearney Data Center

    Kearney approved the first step to bring a data center to town and its Planning Commission discussed code amendments related to data centers.

    Kearney, Buffalo County, NE · Capacity not disclosed · Last verified September 17, 2026

  • reported Keel Moses Lake Data Center

    Keel is advancing a data center project in Moses Lake while speculation grows about AWS involvement.

    Moses Lake, Grant County, WA · Capacity not disclosed · Last verified September 17, 2026

  • reported Kokomo data center

    The Kokomo city council advanced a data center ordinance despite public opposition.

    Kokomo, Howard County, IN · Capacity not disclosed · Last verified September 17, 2026

  • cancelled Krambu Bonner Data Center

    Krambu proposed a 29 MW data center in Bonner, Montana, but withdrew its application following public opposition, and the property owner also backed out.

    Bonner, Missoula County, MT · 29 MW · Last verified September 17, 2026

  • reported Kuna Data Centers (two projects)

    Two large data centers are planned for Kuna, Idaho, with questions raised about their water usage.

    Kuna, Ada County, ID · Capacity not disclosed · Last verified September 17, 2026

  • reported Laramie County Data Center (Bit-O-Wyo rezoning)

    Laramie County commissioners approved rezoning for a data center project alongside Bit-O-Wyo event operations.

    Laramie County, WY · Capacity not disclosed · Last verified September 17, 2026

  • reported Lee County data center

    Lee County residents demanded a pause on a data center project, claiming deception by the developer.

    Lee County, NC · Capacity not disclosed · Last verified September 17, 2026

  • reported Legacy Investing North Loop Data Center

    Legacy Investing purchased the former Minnesota Star Tribune printing facility in the North Loop neighborhood of Minneapolis for data center development, sparking community debate.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 17, 2026

  • reported Lenox Township Data Center

    A proposed data center in Lenox Township has drawn concerns from residents demanding transparency about the project.

    Macomb County, MI · Capacity not disclosed · Last verified September 17, 2026

  • reported Leola Data Center

    A data center project in Leola is undergoing permitting, with McPherson County postponing approval of a conditional use permit and state regulators and the county board set to decide its fate, while a potential settlement over powering the facility was reported.

    Leola, McPherson County, SD · Capacity not disclosed · Last verified September 17, 2026

  • reported Lex Developments Pocatello AI Data Center

    Lex Developments proposed a $2.6 billion AI data center in Pocatello; the city council upheld denial of the project and the developer filed a reconsideration request, accused the city of due process violations, and vowed to sue.

    Pocatello, Bannock County, ID · Capacity not disclosed · Last verified September 17, 2026

  • reported Lowndes County Hyperscale Data Center

    Lowndes County residents demanded transparency regarding a proposed hyperscale data center development.

    Lowndes County, AL · Capacity not disclosed · Last verified September 17, 2026

  • reported Marietta Data Center

    The Marietta city council voted 5-2 to approve a new data center.

    Marietta, Cobb County, GA · Capacity not disclosed · Last verified September 17, 2026

  • reported Markley Group Lowell Data Center

    Residents sued and a judge halted the expansion of the Markley Group data center in a dense Lowell neighborhood, citing air quality and community impact concerns.

    Lowell, Middlesex County, MA · Capacity not disclosed · Last verified September 17, 2026

  • reported Mason Data Center Proposal

    A data center proposal in Mason prompted the city to schedule a town hall as new details about the project emerged.

    Mason, Ingham County, MI · Capacity not disclosed · Last verified September 17, 2026

  • reported Mercer County Data Center

    A data center project in Mercer County became a point of controversy affecting a Lexington bourbon tourism project.

    Mercer County, KY · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta AI-Optimized Data Center Tulsa

    Meta broke ground on an AI optimized data center in Tulsa, Oklahoma in April 2026.

    Tulsa, Tulsa County, OK · Capacity not disclosed · Last verified September 17, 2026

  • running Meta Aiken Data Center

    Meta lists a data center at Aiken, South Carolina among the sites it operates.

    Aiken, Aiken County, SC · Capacity not disclosed · Last verified September 17, 2026

  • running Meta Altoona Data Center

    Meta lists a data center at Altoona, Iowa among the sites it operates.

    Altoona, Polk County, IA · Capacity not disclosed · Last verified September 17, 2026

  • running Meta Beaver Dam Data Center

    Meta lists a data center at Beaver Dam, Wisconsin among the sites it operates.

    Beaver Dam, Dodge County, WI · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta Data Center Cheyenne

    Meta's 715,000 square foot data center in Cheyenne was linked to rare bacteria contamination in the city's water system, traced to a contractor flushing contaminated water, prompting Wyoming to tighten wastewater rules.

    Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta Indianapolis data center (workforce)

    Meta operates a bootcamp in Indianapolis to train data center technicians, reflecting workforce development for its data center operations.

    Indianapolis, Marion County, IN · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta Jeffersonville data center

    Meta's data center in Jeffersonville received zoning approval, with local media explaining how the project was approved.

    Jeffersonville, Clark County, IN · Capacity not disclosed · Last verified September 17, 2026

  • running Meta Kansas City Data Center

    Meta lists a data center at Kansas City, Missouri among the sites it operates.

    Kansas City, Jackson County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta Lebanon data center

    Meta's data center in Lebanon, Indiana plans a temporary off grid gas facility for power as the project advances.

    Lebanon, Boone County, IN · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta Los Lunas Data Center

    Meta's Los Lunas data center, described as the largest operating data center in New Mexico, opened in 2019.

    Los Lunas, Valencia County, NM · Capacity not disclosed · Last verified September 17, 2026

  • reported Meta plus Moss Bluff

    A headline raises the question of whether a data center is coming to Moss Bluff, Louisiana, with limited confirmed details.

    Moss Bluff, Calcasieu Parish, LA · Capacity not disclosed · Last verified September 17, 2026

  • running Meta Sarpy Data Center

    Meta lists a data center at Sarpy, Nebraska among the sites it operates.

    Papillion, Sarpy County, NE · Capacity not disclosed · Last verified September 17, 2026

  • reported Microsoft Cheyenne Data Center Annexation

    Cheyenne City Council approved Microsoft's 3,460 acre annexation for data center development after hours of public debate, with a subsequent referendum petition filed to reverse the vote.

    Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified September 17, 2026

  • reported Microsoft Quincy Data Center

    Microsoft has been building and operating data centers in Quincy for about 20 years and announced commitments including closed loop water systems and declining tax incentives to address community backlash.

    Quincy, Grant County, WA · Capacity not disclosed · Last verified September 17, 2026

  • reported Miller County Data Center

    Records revealed a planned data center site in Miller County north of Texarkana, Arkansas.

    Miller County, AR · Capacity not disclosed · Last verified September 17, 2026

  • reported Modesto Data Center

    A potential data center in Modesto, California has been proposed and is generating public outcry.

    Modesto, Stanislaus County, CA · Capacity not disclosed · Last verified September 17, 2026

  • reported Munster data center

    A data center was proposed in Munster, Indiana, drawing opposition from local residents.

    Munster, Lake County, IN · Capacity not disclosed · Last verified September 17, 2026

  • reported Nebius AI Data Center Independence

    A multibillion dollar Nebius AI data center was proposed in Independence, Missouri, prompting a tax break vote and subsequent recall of Councilman John Perkins, as well as a lawsuit filed to stop the project.

    Independence, Jackson County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported Nodaway County Data Centers

    Two companies expressed interest in Nodaway County land for data center development, prompting reactions from local residents.

    Nodaway County, MO · Capacity not disclosed · Last verified September 17, 2026

  • running Novva Las Vegas data center

    Novva Data Centers lists a data center at Las Vegas, Nevada among the sites it operates.

    Las Vegas, Clark County, NV · Capacity not disclosed · Last verified September 17, 2026

  • running Novva San Francisco data center

    Novva Data Centers lists a data center at San Francisco, California among the sites it operates.

    San Francisco, San Francisco County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Novva Tahoe Reno data center

    Novva Data Centers lists a data center at Reno, Nevada among the sites it operates.

    Reno, Washoe County, NV · Capacity not disclosed · Last verified September 17, 2026

  • reported Okmulgee Data Center

    Opposition to a data center in Okmulgee, Oklahoma is gaining momentum.

    Okmulgee, Okmulgee County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported One Nuclear / Project Cayman Data Center Campus

    ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.

    Vermilion Parish, LA · 2.88 GW · Last verified September 17, 2026

  • reported Oracle and OpenAI Saline Township Data Center

    Oracle and OpenAI's data center project in Saline Township has reached 1 million work hours and is reported to be going up quickly, with the developer also purchasing a neighboring golf course.

    Saline Township, Washtenaw County, MI · Capacity not disclosed · Last verified September 17, 2026

  • running Oracle Chicago cloud region

    Oracle lists a data center at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running Oracle San Jose cloud region

    Oracle lists a data center at San Jose, California among the sites it operates.

    San Jose, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • reported Parker Data Center

    A large data center project approved for Parker, Colorado has drawn opposition from local residents.

    Parker, Douglas County, CO · Capacity not disclosed · Last verified September 17, 2026

  • reported PathOne Arthur Data Center

    Residents of Arthur, Iowa questioned PathOne's data center plans for their community.

    Arthur, Ida County, IA · Capacity not disclosed · Last verified September 17, 2026

  • reported PathOne Hull Data Center

    PathOne held a public meeting for Hull residents about a potential data center project, following a prior meeting in Ida County.

    Hull, Sioux County, IA · Capacity not disclosed · Last verified September 17, 2026

  • reported Patmos Fairfield Data Center

    Patmos announced plans for a $150 million data center in Fairfield, Alabama, inside a former Walmart, with residents raising questions and hundreds attending a town hall.

    Fairfield, Jefferson County, AL · Capacity not disclosed · Last verified September 17, 2026

  • reported Peosta Data Center

    Peosta is reviewing data center development concept plans in the early stage of evaluating a proposal.

    Peosta, Dubuque County, IA · Capacity not disclosed · Last verified September 17, 2026

  • reported Pittsburg County Data Center

    Pittsburg County committee endorsed a deal for a 2,000 acre, $50 billion data center site in May 2026.

    Pittsburg County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported Point Pleasant Data Center

    A data center project in Point Pleasant comprises 3 buildings with nearly 1,000 natural gas and diesel engines.

    Point Pleasant, Mason County, WV · Capacity not disclosed · Last verified September 17, 2026

  • reported Posey County data center

    Posey County commissioners signed a non disclosure agreement amid data center concerns, indicating confidential negotiations about a data center project.

    Posey County, IN · Capacity not disclosed · Last verified September 17, 2026

  • being built Project Clydesdale (Google Tulsa County)

    Google revealed it is the developer behind Project Clydesdale, a 506 acre data center campus being built in Tulsa County, Oklahoma, with plans to fund removal of 2,000 acres of trees for water conservation and partnering with Beale Infrastructure.

    Tulsa County, OK · Capacity not disclosed · Last verified September 17, 2026

  • reported Proposed data center near Mandan

    An unidentified developer has proposed a data center near Mandan, drawing public concern over proximity to schools.

    Mandan, Morton County, ND · Capacity not disclosed · Last verified September 17, 2026

  • running QTS Atlanta 1

    QTS Data Centers lists a data center at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • not yet verified QTS Augusta

    QTS Data Centers lists a data center at Augusta, Georgia and says it is being built.

    Augusta, Richmond County, GA · Capacity not disclosed · Last verified September 17, 2026

  • being built QTS Bessemer

    QTS Data Centers lists a data center at Bessemer, Alabama and says it is being built.

    Bessemer, Jefferson County, AL · Capacity not disclosed · Last verified September 17, 2026

  • being built QTS Blakely

    QTS Data Centers lists a data center at Blakely, Georgia and says it is being built.

    Blakely, Early County, GA · Capacity not disclosed · Last verified September 17, 2026

  • being built QTS Cedar Rapids

    QTS Data Centers lists a data center at Cedar Rapids, Iowa and says it is being built.

    Cedar Rapids, Linn County, IA · Capacity not disclosed · Last verified September 17, 2026

  • reported QTS Clinton Data Center

    QTS officials offered input on a hyperscale data center project planned for Clinton, Iowa, while Clinton residents requested steep restrictions on the facility.

    Clinton, Clinton County, IA · Capacity not disclosed · Last verified September 17, 2026

  • running QTS Colorado Springs

    QTS Data Centers lists a data center at Colorado Springs, Colorado among the sites it operates.

    Colorado Springs, El Paso County, CO · Capacity not disclosed · Last verified September 17, 2026

  • running QTS Data Centers Hillsboro

    QTS Data Centers lists 3 data centers at Hillsboro, Oregon among the sites it operates.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified September 17, 2026

  • running QTS Denver

    QTS Data Centers lists a data center at Aurora, Colorado among the sites it operates.

    Aurora, Arapahoe County, CO · Capacity not disclosed · Last verified September 17, 2026

  • running QTS East Windsor

    QTS Data Centers lists a data center at East Windsor, New Jersey among the sites it operates.

    East Windsor, Mercer County, NJ · Capacity not disclosed · Last verified September 17, 2026

  • not yet verified QTS Fayetteville

    QTS Data Centers lists a data center at Fayetteville, Georgia and says it is being built.

    Fayetteville, Fayette County, GA · Capacity not disclosed · Last verified September 17, 2026

  • being built QTS York County

    QTS Data Centers lists a data center at York County, South Carolina and says it is being built.

    York County, SC · Capacity not disclosed · Last verified September 17, 2026

  • reported Raeden Gibraltar Data Center

    Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court.

    Gibraltar, Wayne County, MI · Capacity not disclosed · Last verified September 17, 2026

  • reported Ridgeland Data Center

    A data center proposed in Ridgeland faces opposition from Mississippi energy companies.

    Ridgeland, Madison County, MS · Capacity not disclosed · Last verified September 17, 2026

  • reported Rural Michigan Farm Data Center

    A farm in rural Michigan near Ionia is seeking to annex into a city in order to host a data center, and Ionia is planning a proactive public meeting on data centers.

    Ionia, Ionia County, MI · Capacity not disclosed · Last verified September 17, 2026

  • cancelled Sabey Butte Data Center

    Sabey backed out of its proposal to build a data center in Butte, Montana.

    Butte, Silver Bow County, MT · Capacity not disclosed · Last verified September 17, 2026

  • reported Sangamon County Data Center

    Residents sued to stop a data center project in Sangamon County.

    Sangamon County, IL · Capacity not disclosed · Last verified September 17, 2026

  • reported SENS Longmont Facility

    SENS opened a 105,000 square foot data center facility in Longmont amid growing data center demand.

    Longmont, Boulder County, CO · Capacity not disclosed · Last verified September 17, 2026

  • reported South Elgin Data Center

    South Elgin rejected a data center development, becoming the latest Chicagoland village to do so.

    South Elgin, Kane County, IL · Capacity not disclosed · Last verified September 17, 2026

  • reported SpaceX Starbase Louisiana / orbital data center

    SpaceX unveiled a Starbase launch site in coastal Vermilion Parish, Louisiana, and moved up its orbital data center launch timeline.

    Vermilion Parish, LA · Capacity not disclosed · Last verified September 17, 2026

  • reported SpaceXAI Southaven Data Center (Fifth Location)

    Southaven approved a new SpaceXAI data center, described as the fifth location in the area, and separately the operator shut off 11 temporary turbines that had been powering the Southaven facility.

    Southaven, DeSoto County, MS · Capacity not disclosed · Last verified September 17, 2026

  • reported Sphere 3D Hopkinsville Data Center

    Sphere 3D plans a 50MW data center in Hopkinsville, Kentucky.

    Hopkinsville, Christian County, KY · 50 MW · Last verified September 17, 2026

  • reported Springfield Data Center

    A developer expressed interest in building a data center in Springfield, Missouri, and the city subsequently hosted community meetings about the proposed development.

    Springfield, Greene County, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported St. Louis Armory Data Center

    A data center near the Armory in St. Louis was allowed to move forward by the St. Louis board under new rules in July 2026.

    St. Louis, St. Louis city, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported St. Louis data center (controversy)

    St. Louis is debating data center regulations, with the Planning Commission having held a meeting on loosening rules and Mayor Cara Spencer reportedly intervening to oppose relaxed regulations.

    St. Louis, St. Louis city, MO · Capacity not disclosed · Last verified September 17, 2026

  • reported St. Lucie County Data Center (I-95)

    A new data center has been proposed for western St. Lucie County near Interstate 95 in Florida.

    St. Lucie County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running STACK ATL01

    STACK Infrastructure lists a data center at Alpharetta, Georgia among the sites it operates.

    Alpharetta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running STACK Infrastructure Elk Grove Village

    STACK Infrastructure lists 2 data centers at Elk Grove Village, Illinois among the sites it operates.

    Elk Grove Village, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running STACK Infrastructure Hillsboro

    STACK Infrastructure lists 3 data centers at Hillsboro, Oregon among the sites it operates.

    Hillsboro, Washington County, OR · Capacity not disclosed · Last verified September 17, 2026

  • running STACK SVY01

    STACK Infrastructure lists a data center at San Jose, California among the sites it operates.

    San Jose, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running STACK SVY02

    STACK Infrastructure lists a data center at Santa Clara, California among the sites it operates.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • reported Stak Energy North Slope Data Center

    Stak Energy proposed a $500 million data center campus on approximately 715.4 acres off the Dalton Highway 25-26 miles south of Deadhorse on Alaska's North Slope, with up to 3 gigawatts of power capacity from natural gas generation, targeting initial operations by late 2028.

    North Slope County, AK · 3 GW · Last verified September 17, 2026

  • reported Starwood Digital Ventures Mason County Data Center

    Starwood Digital Ventures announced a second certified data center for Mason County, to be located in West Columbia, representing a new $12 billion project hailed by Governor Morrisey.

    Mason County, WV · Capacity not disclosed · Last verified September 17, 2026

  • running Switch Atlanta campus

    Switch lists a data center at Atlanta, Georgia among the sites it operates.

    Atlanta, Fulton County, GA · Capacity not disclosed · Last verified September 17, 2026

  • running Switch Grand Rapids campus

    Switch lists a data center at Grand Rapids, Michigan among the sites it operates.

    Grand Rapids, Kent County, MI · Capacity not disclosed · Last verified September 17, 2026

  • running Switch Las Vegas campus

    Switch lists a data center at Las Vegas, Nevada among the sites it operates.

    Las Vegas, Clark County, NV · Capacity not disclosed · Last verified September 17, 2026

  • running Switch Tahoe Reno campus

    Switch lists a data center at Reno, Nevada among the sites it operates.

    Storey County, NV · Capacity not disclosed · Last verified September 17, 2026

  • reported Terra Energy Center Corporation Coal Plant / Data Center Campus

    TECC proposes a 1.25 GW coal fired power plant on approximately 1,000 acres near Lake Lorraine at Point MacKenzie to serve large power consumers including data centers, with Mat Su Borough Assembly authorizing a two year joint marketing partnership with TECC.

    Skwentna, Matanuska-Susitna County, AK · 1.25 GW · Last verified September 17, 2026

  • running TierPoint Baltimore

    TierPoint lists 2 data centers at Baltimore, Maryland among the sites it operates.

    Baltimore, Baltimore city, MD · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Boston

    TierPoint lists 2 data centers at Boston, Massachusetts among the sites it operates.

    Boston, Suffolk County, MA · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Charlotte

    TierPoint lists 2 data centers at Charlotte, North Carolina among the sites it operates.

    Charlotte, Mecklenburg County, NC · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Chicago

    TierPoint lists 2 data centers at Chicago, Illinois among the sites it operates.

    Chicago, Cook County, IL · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Jacksonville Data Center

    TierPoint lists a data center at Jacksonville, Florida among the sites it operates.

    Jacksonville, Duval County, FL · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Little Rock

    TierPoint lists a data center at Little Rock, Arkansas among the sites it operates.

    Little Rock, Pulaski County, AR · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Milwaukee Data Center

    TierPoint lists a data center at Milwaukee, Wisconsin among the sites it operates.

    Milwaukee, Milwaukee County, WI · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Omaha

    TierPoint lists 2 data centers at Omaha, Nebraska among the sites it operates.

    Omaha, Douglas County, NE · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Raleigh

    TierPoint lists 2 data centers at Raleigh, North Carolina among the sites it operates.

    Raleigh, Wake County, NC · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Seattle Data Center

    TierPoint lists a data center at Seattle, Washington among the sites it operates.

    Seattle, King County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Sioux Falls

    TierPoint lists 2 data centers at Sioux Falls, South Dakota among the sites it operates.

    Sioux Falls, Minnehaha County, SD · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Spokane Data Centers

    TierPoint lists a data center at Spokane, Washington among the sites it operates.

    Spokane, Spokane County, WA · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint St. Louis

    TierPoint lists 2 data centers at St. Louis, Missouri among the sites it operates.

    St. Louis, St. Louis city, MO · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Tulsa

    TierPoint lists 2 data centers at Tulsa, Oklahoma among the sites it operates.

    Tulsa, Tulsa County, OK · Capacity not disclosed · Last verified September 17, 2026

  • running TierPoint Waterbury Data Center

    TierPoint lists a data center at Waterbury, Connecticut among the sites it operates.

    Waterbury, Naugatuck Valley Planning Region County, CT · Capacity not disclosed · Last verified September 17, 2026

  • reported U-M / Los Alamos Data Center (Van Buren Township)

    A proposed data center linked to the University of Michigan and Los Alamos National Laboratory near Ypsilanti and Van Buren Township has been stalled by a 6 month power moratorium imposed by the township, with protesters planning a gathering at the Ypsilanti and Van Buren Township line.

    Wayne County, MI · Capacity not disclosed · Last verified September 17, 2026

  • reported Vantage Data Center south of Cheyenne

    Vantage held a community open house for a proposed data center south of Cheyenne, and commissioners subsequently approved a zone change for the facility.

    Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified September 17, 2026

  • running Vantage Data Centers Santa Clara

    Vantage Data Centers lists 2 data centers at Santa Clara, California among the sites it operates.

    Santa Clara, Santa Clara County, CA · Capacity not disclosed · Last verified September 17, 2026

  • running Vantage Reno

    Vantage Data Centers lists a data center at Reno, Nevada among the sites it operates.

    Reno, Washoe County, NV · Capacity not disclosed · Last verified September 17, 2026

  • running Vantage Shackelford County

    Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates.

    Albany, Shackelford County, TX · 1.4 GW · Last verified September 17, 2026

  • reported Vermont Yankee Site Data Center

    The former Vermont Yankee site in Vernon is being explored for potential redevelopment with options including a data center, nuclear reactor, or battery storage, with the Vernon community and state grappling with the decision.

    Vernon, Windham County, VT · Capacity not disclosed · Last verified September 17, 2026

  • reported West Louisville Data Center

    A proposed data center in west Louisville was placed on hold during a zoning review.

    Louisville, Jefferson County, KY · Capacity not disclosed · Last verified September 17, 2026

  • reported Winnebago Tribe AI Data Center

    The Winnebago Tribe of Nebraska hosted an AI data center teach in and announced opposition to data centers near its lands and citizens.

    Winnebago, Thurston County, NE · Capacity not disclosed · Last verified September 17, 2026

  • reported Yellowstone County data center (eyeing)

    A data center company eyeing Yellowstone County had top employees make matching political donations before announcing plans, while residents are demanding a vote on a moratorium as the county takes no action.

    Yellowstone County, MT · Capacity not disclosed · Last verified September 17, 2026

  • reported Yukon Data Center

    Yukon, Oklahoma city leaders were still deliberating on a proposed data center as of July 28, 2026.

    Yukon, Canadian County, OK · Capacity not disclosed · Last verified September 17, 2026

  • running DataBank Minneapolis data center

    DataBank lists a data center at Minneapolis, Minnesota among the sites it operates.

    Minneapolis, Hennepin County, MN · Capacity not disclosed · Last verified September 14, 2026

  • not yet verified Google Van Buren Township data center

    Google lists a data center at Van Buren, Michigan and says it is being built.

    Van Buren, Wayne County, MI · Capacity not disclosed · Last verified September 14, 2026

  • reported Atmosphere Dickerson data center

    A 300 megawatt data center campus proposed by Atmosphere Data Centers at the former Dickerson coal plant in Montgomery County, Maryland.

    Montgomery County, MD · Capacity not disclosed · Last verified September 8, 2026

  • being built Montgomery Meta Investment

    Meta published content about investing in Montgomery, Alabama.

    Montgomery, Montgomery County, AL · Capacity not disclosed · Last verified September 8, 2026

  • waiting on permits OpenAI Effingham County Data Center

    OpenAI is planning a large data center in Effingham County, Georgia, for which Georgia Power received approval for a 3.2 GW power deal, and which faces a citizen led zoning lawsuit and questions about water and electric bill impacts.

    Effingham County, GA · 3.2 GW · Last verified September 8, 2026

How to read a record

Every record carries its sources, its current status, and the date it was last verified. Status history is append only, so a project's earlier states remain visible rather than being overwritten. Where a value is not in the public record it reads "not disclosed" rather than being estimated.

Filings, dockets, and official disclosures are marked as primary sources and rank above reporting. The full method is on the methodology page.

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data