Data Center Record.
Census GEOID: 48029 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 6 reporting sources

● Running Reported November 22, 2023 · 1 Building

H5 San Antonio

Street address 100 Taylor St, San Antonio, TX 78205, Bexar County verified address Exact, at the address [1] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

H5 Data Centers lists a data center at San Antonio, Texas among the sites it operates. [2] Filings on the record specify 1 planned or operational building. [1] H5 Data Centers lists H5 San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026. [1]

Verified Site & Permit Summary
Verified address
100 Taylor St, San Antonio, TX 78205, Bexar County verified address
Operator / developer
H5 Data Centers
Permit / registry ID
Commercial data center facility specification and local appraisal district property record (100 Taylor St, San Antonio, TX 78205) [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] h5datacenters.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2023 (3 years)
Who leads it
H5 Data Centers attributed via corporate HQ or property filing
[1] h5datacenters.com
Permitted legal entity
H5 Data Centers Texas Operations what a permit allows
[1] h5datacenters.com
State permit status
Commercial data center facility specification and local appraisal district property record (100 Taylor St, San Antonio, TX 78205) the state's permit register, last verified November 9, 2026
[1] h5datacenters.com
Official project website
h5datacenters.com (opens in a new tab) verified October 28, 2026
h5datacenters.com (opens in a new tab)
Archived promotional websites
h5datacenters.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: H5 Data Centers · Applicant / Shell LLC: H5 Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for H5 San Antonio.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] h5datacenters.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (source date; the content gives no date of its own)

    H5 Edge data center in San Antonio plans expansion

    [7] costar.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    H5 Data Centers lists H5 San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.

    [1] h5datacenters.com

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS San Antonio San Antonio, Bexar County 12 mi Running QTS Data Centers 2 buildings
CyrusOne San Antonio San Antonio, Bexar County 12 mi Running CyrusOne 3 buildings
Turner Construction Wlo SN1 Data Center Project San Antonio, Bexar County 13 mi Running Microsoft 1 building

Blank cell: not disclosed by any source on file.

Common questions about H5 San Antonio

Answered directly from the verified filings and local actions on this page.

Who is building H5 San Antonio?

H5 Data Centers is the developer, h5datacenters.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does H5 San Antonio say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does H5 San Antonio stand today?

It is running, as reported November 22, 2023. The newest entry, reported November 22, 2023: H5 Edge data center in San Antonio plans expansion [7].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. H5 Data Centers: Data centers (opens in a new tab), H5 Data Centers, September 14, 2026

Reporting

  1. H5 Data Centers' San Antonio facility gets fiber expansion by FiberLight - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 17, 2020, news outlet
  2. H5 buys San Antonio’s only carrier hotel - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 27, 2018, news outlet
  3. H5 Data Centers Announces Next Phase Expansion at its San Antonio Data Center - Business Wire (opens in a new tab), Business Wire, November 20, 2023, press release
  4. H5 Data Centers Expands Edge Data Center in San Antonio - telecomtalk.info (opens in a new tab), telecomtalk.info, November 20, 2023, news outlet
  5. H5 expands data center in San Antonio, Texas - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 21, 2023, news outlet
  6. News | San Antonio’s H5 Edge Data Center and Colocation Facility Plans for Expansion - CoStar (opens in a new tab), CoStar, November 22, 2023, news outlet

7 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "H5 San Antonio", https://datacenterrecord.org/projects/h5-san-antonio-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "H5 San Antonio", https://datacenterrecord.org/projects/h5-san-antonio-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
29.4295, -98.4885
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · H5 San Antonio · 7 sources, 2 entries · basis and source tier on every row · verified November 9, 2026

Download CSV JSON