Data Center Record.
Timeline

Milestones, month by month.

A milestone is an approval, a denial, a moratorium, a groundbreaking, an opening, an expansion, a cancellation, a lawsuit filed, a court ruling, a law signed or taking effect or a federal roll call, on the day it happened; each line links the record it belongs to, the Daily Record lists every row by the day it entered the record instead, and how a day is read is on the methodology page.

656 milestones on the record as of October 26, 2026.

October 2026

32 milestones in October 2026

1 approval · 1 denial · 16 moratoriums adopted · 1 moratorium extended · 2 moratoriums rejected · 7 moratoriums · 1 cancellation · 1 lawsuit filed · 2 court rulings

Newest: , moratorium adopted, Grant County.

Narrow the milestones
Place
Kind
Developer

Thursday, October 22 1

  1. Moratorium adopted

    Grant County, New Mexico

    Grant County commissioners approved a one year moratorium on data center development.

    santafenewmexican.com (opens in a new tab), local outlet

Wednesday, October 21 2

  1. Moratorium rejected

    Little Rock, Arkansas

    Little Rock Board of Directors rejected a six month moratorium on large data centers in a 4-4 vote

    arkansasonline.com (opens in a new tab), local outlet

  2. Moratorium adopted

    Wisconsin Rapids, Wisconsin

    Wisconsin Rapids enacted 12 month moratorium on data center construction with additional restrictions on future data centers.

    wsaw.com (opens in a new tab), local outlet

Tuesday, October 20 6

  1. Moratorium adopted

    Memphis, Tennessee

    Memphis City Council passed a substitute ordinance halting data center permits and construction for 135 days while the city develops comprehensive zoning and environmental regulations.

    cbsnews.com (opens in a new tab), primary source

    1 more report
    1. Oct 20 Memphis city council rejected a one year data center moratorium on Tuesday and passed a substitute ordinance halting construction for 135 days cbsnews.com (opens in a new tab)
  2. Moratorium rejected

    Memphis, Tennessee

    Memphis City Council voted down a proposed 12 month temporary moratorium on data center permits (Agenda Item 19) sponsored by Councilmembers JB Smiley Jr., Jerri Green, Swearengen Washington, and Michalyn Easter Thomas.

    cbsnews.com (opens in a new tab), primary source

    1 more report
    1. Oct 21 Memphis city council voted against a data center moratorium proposal. wvlt.tv (opens in a new tab)
  3. Court ruling

    Memphis, Tennessee

    U.S. District Court issued a temporary restraining order enjoining the Memphis City Council from enforcing bans against community activists attending public council meetings ahead of the data center vote.

    dailymemphian.com (opens in a new tab), primary source

  4. Moratorium

    Pennsylvania

    Pennsylvania House of Representatives voted 202-1 on House Bill 2674 to prohibit data centers from obtaining public utility status.

    mychesco.com (opens in a new tab), news outlet

  5. Cancellation

    MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    Developer withdrew applications for seven proposed data centers in King of Prussia, canceling scheduled zoning hearing.

    6abc.com (opens in a new tab), local outlet

  6. Denial

    PNK Group Wisconsin Rapids Data Center, Wisconsin Rapids, Wisconsin

    Wisconsin Rapids Common Council voted unanimously to deny PNK Group's conditional use permit for a data center on Fourth Avenue North.

    yahoo.com (opens in a new tab), primary source

Thursday, October 15 1

  1. Moratorium extended

    Johnson County, Iowa

    Johnson County Board of Supervisors unanimously extended the moratorium on rezoning, permits, and construction of a data center in unincorporated Johnson County by nine months until Aug. 8, 2027, in a vote on Oct. 15

    dailyiowan.com (opens in a new tab), local outlet

Wednesday, October 14 3

  1. Moratorium

    Charlotte, North Carolina

    Charlotte City Council held a public hearing on October 14, 2026 ahead of an October 26 vote to extend the city's 150 day data center moratorium by up to 11 months

    bisnow.com (opens in a new tab), trade press

  2. Moratorium

    Oregon

    Oregon Governor Tina Kotek directed the Department of Environmental Quality to pause issuing new air or water quality permits for data center projects until July 2027

    rtoinsider.com (opens in a new tab), trade press

    3 more reports
    1. Oct 11 Gov. Tina Kotek ordered the Oregon Department of Environmental Quality to pause air and water pollution permits for data center projects until July 1, 2027. bankspost.com (opens in a new tab)
    2. Oct 13 Governor Kotek directed Oregon Department of Environmental Quality to pause all air and water pollution permits for new or expanding data centers until July 2027. opb.org (opens in a new tab)
    3. Oct 14 Oregon Governor Tina Kotek has ordered a pause in air and water permitting for new or expanded data centers until July 1, 2027 yahoo.com (opens in a new tab)
  3. Moratorium adopted

    South Berwick, Maine

    South Berwick adopted a 180 day data center moratorium retroactive to July 14, 2026

    pressherald.com (opens in a new tab), local outlet

Tuesday, October 13 5

  1. Moratorium

    Martin County, Florida

    Martin County Commission took its first of two required votes on October 13 for a one year moratorium on data centers.

    tcpalm.com (opens in a new tab), local outlet

  2. Moratorium adopted

    Bellefontaine, Ohio

    Bellefontaine City Council adopted Resolution 26-49 imposing a 12 month moratorium on the establishment, conversion, development and construction of data centers

    peakofohio.com (opens in a new tab), local outlet

  3. Moratorium

    Chatham, New Jersey

    Chatham Borough Council voted unanimously on October 13, 2026 to ban data centers in all zoning districts.

    newjerseyhills.com (opens in a new tab), local outlet

  4. Moratorium adopted

    Dover, Delaware

    Dover City Council unanimously approved an 18 month moratorium on data center construction

    spotlightdelaware.org (opens in a new tab), local outlet

  5. Moratorium adopted

    South Berwick, Maine

    The moratorium was adopted by a 4-0 Town Council vote on Tuesday night

    pressherald.com (opens in a new tab), local outlet (the weekday its sentence names, the last before the report; filed under Oct 14, 2026)

Monday, October 12 1

  1. Moratorium adopted

    Millington, Tennessee

    Millington Board of Mayor and Aldermen unanimously approved Resolution 44-2026 enacting a six month moratorium on data center and industrial computing facilities through April 12, 2027.

    dailymemphian.com (opens in a new tab), primary source

Friday, October 9 2

  1. Moratorium adopted

    Oregon

    Oregon Gov. Tina Kotek ordered the Oregon Department of Environmental Quality to pause all air and water discharge permits for data centers until July 2027

    salemreporter.com (opens in a new tab), local outlet

  2. Moratorium adopted

    Boone County, Iowa

    The Boone County Board of Supervisors adopted a moratorium on new data center projects.

    qctimes.com (opens in a new tab), local outlet

Thursday, October 8 1

  1. Moratorium adopted

    Bucksport, Maine

    Bucksport's town council voted 5-2 on October 8, 2026 to enact a six month moratorium on data centers

    thecooldown.com (opens in a new tab), national outlet

Tuesday, October 6 5

  1. Approval

    Alabama

    Alabama Public Service Commission approved rules requiring the commission to vote on each new data center project exceeding the 150 megawatt threshold within 90 days, with automatic approval if no vote occurs

    streamlinefeed.co.ke (opens in a new tab), international outlet

  2. Moratorium adopted

    Raritan, New Jersey

    Raritan Borough council voted unanimously to introduce a nine month moratorium on data centers on October 6.

    tapinto.net (opens in a new tab), local outlet

  3. Moratorium adopted

    Brighton, Colorado

    The Brighton City Council voted unanimously to adopt a one year moratorium on data center development

    cpr.org (opens in a new tab), local outlet

  4. Moratorium adopted

    San Joaquin County, California

    San Joaquin County Board of Supervisors voted 5-0 Tuesday to adopt an urgency ordinance establishing a 45 day moratorium on new land use approvals for data centers in unincorporated San Joaquin County

    stocktonia.org (opens in a new tab), news outlet

  5. Court ruling

    Nashville, Tennessee

    U.S. District Judge Eli Richardson dismissed DC BLOX's nine claims against Metro Nashville's data center permitting moratorium, noting a perceived raw deal does not make a federal case, while granting 21 days until October 27, 2026 to replead three claims.

    the901report.com (opens in a new tab), trade press

Monday, October 5 4

  1. Lawsuit filed

    Bridgewater Township, New Jersey

    A developer sued Bridgewater on October 5, 2026, challenging the data center ordinance, arguing it conflicts with an approved redevelopment plan that permits data centers at 1200 Route 22

    mycentraljersey.com (opens in a new tab), news outlet

  2. Moratorium adopted

    Anne Arundel County, Maryland

    Anne Arundel County Council approved a 15 month moratorium on new data center construction

    capitalgazette.com (opens in a new tab), local outlet

  3. Moratorium

    New York

    The New York State Public Service Commission issued a draft scope for the Generic Environmental Impact Statement required under the data center moratorium.

    jdsupra.com (opens in a new tab), trade press

  4. Moratorium

    Avery County, North Carolina

    Avery County Commissioners postponed a public hearing on a proposed moratorium on data centers, cryptocurrency mining and similar uses because the county missed advertising requirements

    averyjournal.com (opens in a new tab), news outlet

Thursday, October 1 1

  1. Moratorium adopted

    Raleigh, North Carolina

    Raleigh enacted a data center moratorium just last week

    bisnow.com (opens in a new tab), trade press

Also on the record for October 2026

16 acts dated only by the article that reported them, 47 acts of another kind and 12 lines of background, plans and statements

Not on this page, by the rule at the top: 16 acts dated only by the article that reported them, 47 acts of another kind and 12 lines of background, plans and statements. Each sits on its home record, a project page, a scorecard row on its state, county or city page, a bill page or a laws page, and on each state's own timeline, where every act of the month is listed with the lines under it. The Daily Record lists every row by the day it entered the record.

By year

2026 466 milestones

  1. October 32 milestones 1 approval, 1 denial, 16 moratoriums adopted, 1 moratorium extended, 2 moratoriums rejected, 7 moratoriums, 1 cancellation, 1 lawsuit filed, 2 court rulings
  2. September 119 milestones 18 approvals, 3 denials, 22 moratoriums adopted, 4 moratoriums extended, 3 moratoriums rejected, 30 moratoriums, 2 groundbreakings, 1 expansion, 5 lawsuits filed, 22 court rulings, 1 lawsuit, 6 laws signed, 2 federal roll calls
  3. August 76 milestones 2 approvals, 2 denials, 17 moratoriums adopted, 1 moratorium extended, 3 moratoriums rejected, 30 moratoriums, 1 opening, 1 cancellation, 5 lawsuits filed, 9 court rulings, 2 lawsuits, 3 laws signed
  4. July 75 milestones 3 approvals, 4 denials, 28 moratoriums adopted, 15 moratoriums, 3 groundbreakings, 1 expansion, 11 lawsuits filed, 4 court rulings, 2 lawsuits, 1 law signed, 3 laws in effect
  5. June 37 milestones 5 approvals, 1 denial, 18 moratoriums adopted, 7 moratoriums, 1 groundbreaking, 2 lawsuits filed, 1 lawsuit, 2 laws signed
  6. May 30 milestones 8 approvals, 2 denials, 8 moratoriums adopted, 3 moratoriums, 1 expansion, 1 lawsuit filed, 7 laws signed
  7. April 39 milestones 9 approvals, 4 moratoriums adopted, 2 moratoriums rejected, 4 moratoriums, 1 opening, 1 expansion, 4 lawsuits filed, 14 laws signed
  8. March 21 milestones 1 denial, 11 moratoriums adopted, 2 moratoriums, 1 expansion, 6 laws signed
  9. February 13 milestones 3 approvals, 2 denials, 2 moratoriums adopted, 1 moratorium rejected, 2 moratoriums, 1 groundbreaking, 1 cancellation, 1 lawsuit
  10. January 17 milestones 2 approvals, 1 moratorium adopted, 12 openings, 1 lawsuit filed, 1 law signed

2026, no month given 7

  1. Denial

    New Mexico

    New Mexico state land commissioner denied pipeline project's application for rights of way across state trust lands in spring 2026

    latitudemedia.com (opens in a new tab), trade press (the year its own sentence names; filed under Sep 11, 2026)

  2. Moratorium

    Iron County, Utah

    Iron County put a pause on new data centers earlier this year

    upr.org (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 18, 2026)

  3. Moratorium

    Alabama

    Several Alabama cities placed moratoriums on new data center projects in 2026, including Fort Payne, Cullman, Birmingham, Leeds, and Homewood

    yellowhammernews.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 7, 2026)

  4. Moratorium adopted

    Westfield, Massachusetts

    City councilors in Westfield voted earlier this year to enact a one year moratorium on additional data centers

    bostonglobe.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 8, 2026)

  5. Moratorium adopted

    Holyoke, Massachusetts

    Holyoke approved a ban on data centers earlier this year

    bostonglobe.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 8, 2026)

  6. Moratorium

    Maine

    Governor Janet Mills vetoed statewide bill in spring 2026 that would have placed 18 month moratorium on large scale data centers.

    observer-me.com (opens in a new tab), news outlet (the year its own sentence names; filed under Sep 16, 2026)

  7. Moratorium

    Pennsylvania

    State Sen. Katie Muth introduced a bill this year that would impose a three year moratorium on data center development

    insideclimatenews.org (opens in a new tab), trade press (the year its own sentence names; filed under Sep 22, 2026)

2025 43 milestones

  1. December 7 milestones 2 approvals, 5 groundbreakings
  2. November 3 milestones 1 approval, 1 denial, 1 moratorium adopted
  3. October 4 milestones 3 groundbreakings, 1 law signed
  4. September 3 milestones 1 approval, 1 groundbreaking, 1 expansion
  5. August 5 milestones 3 approvals, 1 expansion, 1 lawsuit
  6. July 1 milestone 1 law signed
  7. June 2 milestones 1 groundbreaking, 1 law signed
  8. May 6 milestones 1 approval, 1 expansion, 4 laws signed
  9. April 2 milestones 2 laws signed
  10. March 1 milestone 1 approval
  11. February 1 milestone 1 lawsuit filed
  12. January 2 milestones 1 approval, 1 opening

2025, no month given 6

  1. Approval

    Richland Parish, Louisiana

    Three gas plants were approved by the PSC last year, and seven more are now up for approval

    wwno.org (opens in a new tab), local outlet (the year its own sentence names; filed under Aug 12, 2026)

  2. Moratorium adopted

    Aurora, Illinois

    Aurora enacted 180 day moratorium on data center and warehouse developments last year and passed ordinance in March requiring council approval for all new data centers

    chicagotribune.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 15, 2026)

  3. Approval

    Kentucky

    House Bill 775 granted 50 year tax breaks for data center developers.

    wlky.com (opens in a new tab), local outlet (the year its source gives; no month or day; filed under Jan 1, 2025)

  4. Lawsuit filed

    Historic Charlotte building site data center, Charlotte, North Carolina

    Digital Realty bought the Court Arcade building in 2025 from Shamrock Management Corporation for 9.5 million dollars

    wbtv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 7, 2026)

  5. Groundbreaking

    Meta El Paso data center, El Paso, Texas

    Meta broke ground on El Paso Data Center last year (2025)

    datacenters.atmeta.com (opens in a new tab), primary source (the year its own sentence names; filed under Mar 26, 2026)

  6. Groundbreaking

    Nebius AI Data Center (Vineland), Vineland, New Jersey

    DataOne Campus construction began in 2025

    communitynews.org (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 12, 2026)

2024 27 milestones

  1. December 1 milestone 1 groundbreaking
  2. November none on the record
  3. October none on the record
  4. September none on the record
  5. August 2 milestones 1 groundbreaking, 1 opening
  6. July 2 milestones 2 laws signed
  7. June 2 milestones 2 laws signed
  8. May 5 milestones 5 laws signed
  9. April 5 milestones 1 opening, 4 laws signed
  10. March none on the record
  11. February none on the record
  12. January 2 milestones 1 expansion, 1 law signed

2024, no month given 8

  1. Moratorium adopted

    Massachusetts

    Massachusetts Legislature approved tax incentive for data center development in 2024; Governor Healey pressed pause in June 2026

    nbcboston.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 8, 2026)

  2. Approval

    Stafford County, Virginia

    In 2024, the Stafford County Board of Supervisors approved the Stafford Technology Campus, the largest data center project in county history.

    youtube.com (opens in a new tab), video (the year its own sentence names; filed under Feb 26, 2026)

  3. Approval

    Google Fort Wayne data center, Fort Wayne, Indiana

    IDEM first approved 34 main diesel generators for the project back in 2024.

    21alivenews.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 21, 2026)

  4. Groundbreaking

    Novva West Jordan Data Center Campus, West Jordan, Utah

    Phase 3 construction started last year, covers 318,000 sq ft and adds 72 MW of capacity

    enr.com (opens in a new tab), trade press (the year its own sentence names; filed under Mar 13, 2025)

  5. Opening

    SpaceXAI Memphis data centers, Memphis, Tennessee

    xAI's hyperscale data center in Memphis opened in 2024

    wsmv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 11, 2026)

  6. Opening

    SpaceXAI Memphis data centers, Memphis, Tennessee

    Colossus I opened in 2024.

    independent.co.uk (opens in a new tab), international outlet (the year its own sentence names; filed under Sep 18, 2026)

  7. Groundbreaking

    xAI Southaven turbine site, Southaven, Mississippi

    Colossus 1 data center construction began in 2024

    cbsnews.com (opens in a new tab), national outlet (the year its own sentence names; filed under Aug 27, 2026)

  8. Approval

    T5 Grayslake data center, Grayslake, Illinois

    T5 @ Chicago IV data center campus was given approvals in 2024 and 2025 by the Grayslake Village Board

    lakemchenryscanner.com (opens in a new tab), news outlet (the year its own sentence names; filed under Aug 30, 2026)

2023 15 milestones

  1. December none on the record
  2. November none on the record
  3. October none on the record
  4. September 1 milestone 1 groundbreaking
  5. August none on the record
  6. July 2 milestones 1 approval, 1 groundbreaking
  7. June 1 milestone 1 law signed
  8. May none on the record
  9. April 3 milestones 3 laws signed
  10. March 3 milestones 3 laws signed
  11. February none on the record
  12. January none on the record

2023, no month given 5

  1. Approval

    Boulder City BLM Land Data Center, Boulder City, Nevada

    Townsite Solar 2 LLC received BLM approval in 2023 for solar power and battery storage facility on 88.5 acre parcel 25 miles southeast of Las Vegas

    nationofchange.org (opens in a new tab), national outlet (the year its own sentence names; filed under Sep 9, 2026)

  2. Opening

    Google Lancaster data center, Lancaster, Ohio

    Google's Lancaster data center opened in 2023

    streamlinefeed.co.ke (opens in a new tab), international outlet (the year its own sentence names; filed under Sep 19, 2026)

  3. Approval

    Leola Data Center, Leola, South Dakota

    In 2023, South Dakota PUC approved Montana Dakota Utilities request to establish new rate available to data center type facilities housing high density computer processing technology

    yahoo.com (opens in a new tab), national outlet (the year its own sentence names; filed under Sep 2, 2026)

  4. Groundbreaking

    Novva West Jordan Data Center Campus, West Jordan, Utah

    Phase 2 construction started in late 2023, covers 318,000 sq ft and adds 72 MW of capacity

    enr.com (opens in a new tab), trade press (the year its own sentence names; filed under Mar 13, 2025)

  5. Opening

    Novva West Jordan Data Center Campus, West Jordan, Utah

    Phase 1 facility began operating in 2023, built by Layton Construction Co.

    enr.com (opens in a new tab), trade press (the year its own sentence names; filed under Mar 13, 2025)

2022 10 milestones

  1. December none on the record
  2. November none on the record
  3. October 1 milestone 1 groundbreaking
  4. September 1 milestone 1 moratorium
  5. August none on the record
  6. July none on the record
  7. June 2 milestones 2 laws signed
  8. May none on the record
  9. April 3 milestones 3 laws signed
  10. March 1 milestone 1 law signed
  11. February none on the record
  12. January none on the record

2022, no month given 2

  1. Lawsuit

    Google Mesa data center, Mesa, Arizona

    SRP issued RFPs in 2022 and 2024 for LDES technology demonstration projects.

    media.srpnet.com (opens in a new tab), news outlet (the year its own sentence names; filed under Sep 8, 2025)

  2. Groundbreaking

    Meta Kuna Data Center, Kuna, Idaho

    Data center broke ground in 2022

    kezj.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 8, 2026)

2021 17 milestones

  1. December none on the record
  2. November none on the record
  3. October none on the record
  4. September none on the record
  5. August 1 milestone 1 law signed
  6. July none on the record
  7. June 2 milestones 2 laws signed
  8. May 3 milestones 1 approval, 2 laws signed
  9. April 2 milestones 2 laws signed
  10. March 6 milestones 6 laws signed
  11. February none on the record
  12. January none on the record

2021, no month given 3

  1. Approval

    Pennsylvania

    Pennsylvania's General Assembly approved a sales tax exemption for data center developments in 2021 under Gov. Tom Wolf

    governing.com (opens in a new tab), national outlet (the year its own sentence names; filed under Aug 14, 2026)

    1 more report
    1. Jan, no day given Pennsylvania's General Assembly first approved a sales tax exemption for data center developments in 2021 under Governor Tom Wolf inquirer.com (opens in a new tab)
  2. Moratorium adopted

    Nevada

    Southern Nevada Water Authority imposed an evaporative cooling moratorium beginning with a board vote in 2021

    ktnv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 8, 2026)

  3. Opening

    Meta Eagle Mountain Data Center, Eagle Mountain, Utah

    Campus opened in 2021 at 1275 N. Community Circle

    kutv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 14, 2026)

2020 3 milestones

1 groundbreaking, 2 laws signed Open 2020.

2019 10 milestones

  1. December 1 milestone 1 law signed
  2. November none on the record
  3. October none on the record
  4. September none on the record
  5. August 1 milestone 1 law signed
  6. July 1 milestone 1 approval
  7. June 3 milestones 3 laws signed
  8. May 2 milestones 2 laws signed
  9. April none on the record
  10. March 1 milestone 1 law signed
  11. February none on the record
  12. January none on the record

2019, no month given 1

  1. Approval

    Google Mesa data center, Mesa, Arizona

    Mesa City Council approved development agreement in 2019

    gilbertsunnews.com (opens in a new tab), news outlet (the year its own sentence names; filed under Jul 1, 2023)

2018 10 milestones

  1. December none on the record
  2. November none on the record
  3. October none on the record
  4. September 1 milestone 1 expansion
  5. August none on the record
  6. July none on the record
  7. June none on the record
  8. May 3 milestones 3 laws signed
  9. April 1 milestone 1 law signed
  10. March 1 milestone 1 law signed
  11. February 1 milestone 1 law signed
  12. January none on the record

2018, no month given 3

  1. Moratorium adopted

    Plattsburgh, New York

    Plattsburgh passed moratorium on Bitcoin mining in 2018 lasting 18 months

    cryptonews.net (opens in a new tab), news outlet (the year its own sentence names; filed under Sep 9, 2026)

  2. Approval

    Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03), West Jordan, Utah

    Utah Division of Air Quality Approval Order AI Site 15939 (Project N160660003) and Salt Lake County Assessor parcel records document the 55 acre, 3 building Aligned campus at 3333 W. 9000 South in West Jordan, with one building inside a former semiconductor plant acquired in 2018.

    daqpermitting.utah.gov (opens in a new tab), primary source (the year its own sentence names; filed under Apr 12, 2022)

  3. Groundbreaking

    Meta Eagle Mountain Data Center, Eagle Mountain, Utah

    Meta first broke ground in 2018

    kutv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 14, 2026)

2017 4 milestones

4 laws signed Open 2017.

2016 10 milestones

  1. December none on the record
  2. November 1 milestone 1 law signed
  3. October none on the record
  4. September none on the record
  5. August none on the record
  6. July none on the record
  7. June 1 milestone 1 law signed
  8. May 2 milestones 2 laws signed
  9. April 3 milestones 3 laws signed
  10. March 3 milestones 3 laws signed
  11. February none on the record
  12. January none on the record

2015 10 milestones

  1. December 2 milestones 2 laws signed
  2. November 1 milestone 1 law signed
  3. October none on the record
  4. September none on the record
  5. August none on the record
  6. July none on the record
  7. June 1 milestone 1 law signed
  8. May none on the record
  9. April 4 milestones 4 laws signed
  10. March 2 milestones 2 laws signed
  11. February none on the record
  12. January none on the record

2014 5 milestones

1 opening, 4 laws signed Open 2014.

2013 6 milestones

1 approval, 5 laws signed Open 2013.

2012 8 milestones

2 openings, 6 laws signed Open 2012.

2011 4 milestones

2 openings, 2 laws signed Open 2011.

2010 6 milestones

6 laws signed Open 2010.

2006 1 milestone

1 opening Open 2006.

2003 1 milestone

1 opening Open 2003.

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data