Historic Charlotte building site data center
A historic Charlotte building was demolished in a day to clear the path for a data center development. It is reported, as reported September 4, 2026. The Court Arcade was demolished this past week to make way for a three story 29,000 square foot data center (reported September 7, 2026).
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Not disclosed
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Not disclosed | |||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Who is behind itA land record, a zoning application or a company's own announcement.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Mecklenburg County and Charlotte about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Charlotte | Charlotte Water imposed a 150 day moratorium on new data center applications in June while officials study infrastructure capacity and environmental concerns | yahoo.com | |
| Charlotte | Data center zoning decision was made off I-85 in Charlotte area | charlotteobserver.com |
What happened
-
(source date; the content gives no date of its own)
The Court Arcade was demolished this past week to make way for a three story 29,000 square foot data center [3]
-
(source date; the content gives no date of its own)
Digital Realty bought the Court Arcade building in 2025 from Shamrock Management Corporation for 9.5 million dollars [3]
-
· Status: rumoredMoratorium (source date; the content gives no date of its own)
The Charlotte Water moratorium on data center applications is scheduled to expire November 5 [2]
The full Historic Charlotte building site data center timeline, in order
1 correction to this record
Every correction, with its reason
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
What was said
Charlotte Water Public Affairs Manager Jennifer Frost said data centers currently operating in Charlotte have not caused residential water or sewer rates to increase
Every statement about data centers in North Carolina, by speaker
The site
Where in Mecklenburg County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 9 other published records in North Carolina
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Charlotte, Mecklenburg County, North Carolina
- How exactly it is located
- County level, the county seat
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at a county seat.
Questions about this project
4 questions answered from the record
Who is building Historic Charlotte building site data center?
-
Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.
How much power and water does Historic Charlotte building site data center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Historic Charlotte building site data center stand today?
-
It is reported, as reported September 4, 2026. The newest entry, reported September 7, 2026: The Court Arcade was demolished this past week to make way for a three story 29,000 square foot data center [3].
What has Charlotte or Mecklenburg County decided about it?
-
Charlotte: Charlotte Water imposed a 150 day moratorium on new data center applications in June while officials study infrastructure capacity and environmental concerns (reported September 4, 2026, source); and Charlotte: Data center zoning decision was made off I-85 in Charlotte area (reported March 24, 2026, source). 2 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- Historic Charlotte building demolished in a day, clears path for data center - Charlotte Observer, Charlotte Observer, September 2, 2026, local outlet
- Will new data centers spike Charlotte water bills? Here’s what officials say - Charlotte Observer, Charlotte Observer, September 4, 2026, local outlet
- Charlotte architect remembers historic building demolished for data center development - WBTV, WBTV, September 7, 2026, local outlet
3 sources on file.
Cite this record
Data Center Record, "Historic Charlotte building site data center", https://datacenterrecord.org/projects/historic-charlotte-building-site-data-center-nc, last verified September 17, 2026.
Cite this page
Data Center Record, "Historic Charlotte building site data center", https://datacenterrecord.org/projects/historic-charlotte-building-site-data-center-nc. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- historic-charlotte-building-site-data-center-nc
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- court, skeleton
- Place id
- us/nc/mecklenburg-county/charlotte
- Coordinates
- 35.22694, -80.84333
- Location precision
- county
- Location source
- County seat (Charlotte), Wikidata, placed at county level
- Coordinate source
- wikidata county seat
- Location source number
- Not disclosed
- Location last verified
- September 16, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-04
- Last verified
- 2026-09-17