Data Center Record.
Map

Where the projects are.

The country by scorecard rating with a count of tracked projects per state. Open a state for the projects as pins, colored by status and sized by disclosed capacity, over the jurisdictions that have a published rating.

Colors show how each state treats data centers, from open to closed, based on the rules its counties and cities have passed. A state takes the color of its strictest rule. Grey means we have records there but no rule yet.

Pins are projects. The color says where each one stands, from rumored to running; the size says how much power it would use, where that has been disclosed. A hollow pin means we know the town but not the exact site.

Tap a state to see its counties and projects. Tap a pin for the quick facts, and tap again to open its full record.

Details
Rating scale
  • Open green
  • Case by case yellow
  • Restrictive orange
  • Closed red
  • No published rating

A state's rating is the most restrictive published jurisdiction rating in the state. Ratings sit on the jurisdictions themselves in the state view. A county or city shaded grey has at least one record.

Status enum
  • rumored rumored
  • proposed proposed
  • waiting on permits permitting
  • approved approved
  • being built under_construction
  • running operational
  • stalled stalled
  • cancelled cancelled
  • approximate location (city or county centroid)

Pin radius is 7 pixels where capacity is not disclosed, and scales from 7 to 18 pixels between 0 and 1,000 MW where it is.

Nothing on this map is estimated. A state with no published scorecard row has no color. A project with no coordinates in the public record is on the list and not on the map. Boundaries are U.S. Census Bureau TIGERweb, public domain; the map draws no third party tiles and sets no cookies.

The same projects, as a list

Every map has a list beside it carrying the same data and the same filters. Crawlers and answer engines cannot read a map, and neither can a screen reader. The list is the version that gets indexed.

All tracked projects

  • proposedVolition Industries Spanish Fork

    Volition Industries proposes to convert the former Fingerhut warehouse at the mouth of Spanish Fork Canyon into a self powered data center running on natural gas fuel cells, pending Spanish Fork City Council amendments to Title 15.

    Spanish Fork, Utah County, UT · 250 MW · Last verified September 5, 2026