Data Center Record.

Cancelled Built from one source

Franklin County data center proposal

A data center proposal in Franklin County was dropped. It is cancelled, since August 16, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Crusoe
as stated by the source [1]
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Crusoe as stated by the source [1] datacenterdynamics.com September 21, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: stalled or cancelled (content date)

    A data center proposal in Franklin County was dropped. [3]

The full Franklin County data center proposal timeline, in order

4 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: wdbj7.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the source url of a status history row

    The source was a news.google.com wrapper url, which names no publisher and does not last. Resolved to the publisher's own page by the monitor's resolver on 2026-09-20 (docs/batch-va-record-fixes-0920.md, item 3). The outlet and the date on the row are unchanged. The old and new text.

Every correction on the record is on the corrections page.

The site

Where in Franklin County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Stalled or cancelled, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 35 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Franklin County, Virginia
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Franklin County data center proposal?

Crusoe is the developer, source. No construction contractor is named on the record yet.

How much power and water does Franklin County data center proposal say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Franklin County data center proposal stand today?

It is cancelled, since August 16, 2026. The newest entry, August 16, 2026: A data center proposal in Franklin County was dropped. [3]

What has Franklin County decided about it?

No decision by Franklin County about data centers is on the record. The Franklin County page and the Virginia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Crusoe linked to potential data center project in Franklin County, Virginia, Data Center Dynamics, July 16, 2026, trade press
  2. Franklin County commissioners voted unanimously to approve rezoning two properties from agricultural to industrial use, clearing the way for data center developments., www.facebook.com, September 16, 2026, local outlet
  3. Data center proposal dropped in Franklin County - WDBJ7, WDBJ7, August 16, 2026, local outlet

3 sources on file.

Cite this record

Data Center Record, "Franklin County data center proposal", https://datacenterrecord.org/projects/franklin-county-data-center-proposal-va, last verified September 21, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Franklin County data center proposal", https://datacenterrecord.org/projects/franklin-county-data-center-proposal-va. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
franklin-county-data-center-proposal-va
Status value
cancelled
Stage
Stalled or cancelled
Tier
skeleton
Tags
skeleton
Place id
us/va/franklin-county
Coordinates
36.9997, -79.8897
Location precision
county
Location source
County seat (Rocky Mount), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-21