Unnamed data center developers are eyeing land near Hallam, with landowners facing choices about the proposed project. It is reported, as reported August 24, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Lancaster County and Hallam about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hallam Village board vote to approve data center scheduled for October 5 at Hallam village board meeting omaha.com
Hallam Hallam planning commission unanimously recommended approval for Monolith's proposed data center omaha.com
Lancaster County case by case Board includes representatives from Nebraska Public Power District, Lincoln Electric System, Lower Platte South Natural Resources District, Lincoln Chamber of Commerce and five members of public omaha.com
Lancaster County case by case Task force will report to Lincoln Lancaster County Planning Commission by end of year omaha.com
Lancaster County case by case Task force will meet approximately six times from October to December 2026 omaha.com
Lancaster County case by case Lancaster County Board approved creation of 15 member task force charged with recommending land use regulations omaha.com
9 earlier decisions on the county's rows
DateWhoDecisionSource
Lancaster County case by case Application for Task Force volunteers is open until September 25, 2026 klkntv.com
Lancaster County case by case Task Force will meet six times over a three month period from October to December 2026 klkntv.com
Lancaster County case by case Lancaster County Board of Commissioners is forming a Data Center Task Force to study guidelines for data center use, potential locations and procedural policies klkntv.com
Lancaster County case by case Lancaster County Board created 13 member task force to review data center proposal and recommend regulations to Planning Commission by end of year starherald.com
Lancaster County case by case Task force charged with reviewing data center proposal and recommending regulations to Planning Commission by end of year omaha.com
Lancaster County case by case Lancaster County board decided to create a 13 member data center task force omaha.com
Lincoln City of Lincoln announced it would not pursue additional large scale data centers outside Google's site near North 35th Street and Interstate 80 journalstar.com
Lancaster County case by case Matt Schulte, Lancaster County Commissioner, proposed moratorium late last month after Israeli company appeared to plan hyperscale data center near Hallam journalstar.com
Lancaster County case by case Lancaster County considering moratorium on data center construction journalstar.com

What happened

  1. (source date; the content gives no date of its own)

    Developers offered Hallam farmer Darin Schwaninger tens of thousands of dollars per acre in February [2]

  2. (source date; the content gives no date of its own)

    The project is located near Nebraska Public Power District's Sheldon Power and Princeton Road stations [2]

  3. (source date; the content gives no date of its own)

    Stark Power, an Israel based company, bought Sagebrush Infrastructure Partners in June [2]

  4. (source date; the content gives no date of its own)

    Sagebrush Infrastructure Partners LLC obtained options on more than 1,500 acres of land worth over 8 million dollars near Hallam [2]

  5. (source date; the content gives no date of its own)

    Nebraska Public Power District's Princeton Road Station in Hallam set to begin operating in 2029 [1]

  6. (source date; the content gives no date of its own)

    Purchase agreements signed anywhere from December 2025 to mid March 2026 [1]

  7. · Status: rumored (source date; the content gives no date of its own)

    Stark Power, based in Tel Aviv, Israel, acquired Sagebrush Infrastructure in June [1]

The full Data Center near Hallam (unnamed developers) timeline, in order

2 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

Farmer Darin Schwaninger declined the option offer citing concerns about community division
Darin Schwaninger, Hallam farmer · August 27, 2026 · paraphrased · 1011now.com local outlet
Scott Novack, vice president of digital infrastructure for Stark, said the company is in early stages of evaluating the site and no final decision has been made
Scott Novack, vice president of digital infrastructure, Stark Power · August 24, 2026 · paraphrased · nebraskapublicmedia.org local outlet

Every statement about data centers in Nebraska, by speaker

The site

Where in Lancaster County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 11 other published records in Nebraska
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Hallam, Lancaster County, Nebraska
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Data Center near Hallam (unnamed developers)?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Data Center near Hallam (unnamed developers) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Data Center near Hallam (unnamed developers) stand today?

It is reported, as reported August 24, 2026. The newest entry, reported August 27, 2026: Developers offered Hallam farmer Darin Schwaninger tens of thousands of dollars per acre in February [2].

What has Hallam or Lancaster County decided about it?

Hallam: Village board vote to approve data center scheduled for October 5 at Hallam village board meeting (reported September 18, 2026, source); and Hallam: Hallam planning commission unanimously recommended approval for Monolith's proposed data center (reported September 18, 2026, source). 15 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Hallam landowners face stark choice on data center - nebraskapublicmedia.org, nebraskapublicmedia.org, August 24, 2026, local outlet
  2. Data center developers eyeing land near Hallam - 1011now.com, 1011now.com, August 27, 2026, local outlet
  3. Hallam landowners face stark choice on data center - nebraskapublicmedia.org, nebraskapublicmedia.org, August 24, 2026, local outlet

3 sources on file.

Cite this record

Data Center Record, "Data Center near Hallam (unnamed developers)", https://datacenterrecord.org/projects/data-center-near-hallam-unnamed-developers-ne, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Data Center near Hallam (unnamed developers)", https://datacenterrecord.org/projects/data-center-near-hallam-unnamed-developers-ne. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
data-center-near-hallam-unnamed-developers-ne
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ne/lancaster-county/hallam
Coordinates
40.80917, -96.67806
Location precision
county
Location source
County seat (Lincoln), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Case by case
Published
2026-09-05
Last verified
2026-09-17