● Proposed Campus Reported September 18, 2026

Monolith Data Center Expansion (Hallam)

Location Hallam, Lancaster County, Nebraska county centroid County level, the county seat

Overview, regulatory gates and specifications

Monolith is proposing a data center expansion near Hallam, Nebraska, with landowners facing decisions about selling and residents attending a town hall to discuss the project. [3] Phase 1 expansion would take about 18 months and increase production to 220,000 tons per year of carbon black [3]

Verified Site & Permit Summary
Verified address
Hallam, Lancaster County, Nebraska county centroid
Operator / developer
Monolith
Permit / registry ID
Omaha World-Herald on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Monolith as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Monolith
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Monolith Data Center Expansion (Hallam).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: rumored (source date; the content gives no date of its own)

    Phase 1 expansion would take about 18 months and increase production to 220,000 tons per year of carbon black

    [3] omaha.com

Every event in order

5 corrections to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Nebraska

Verified data center records in Nebraska within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Lincoln Data Center Lincoln, Lancaster County Less than 1 mi Proposed
Data Center near Hallam (unnamed developers) Hallam, Lancaster County Less than 1 mi Proposed
Google Lincoln Data Center Lincoln, Lancaster County Less than 1 mi Proposed Google
Meta Sarpy Data Center Papillion, Sarpy County ~35 mi Running Meta 6 buildings
Google Papillion data center Papillion, Sarpy County ~40 mi Running Google
H5 Omaha Omaha, Douglas County ~40 mi Running H5 Data Centers 1 building

Blank cell: not disclosed by any source on file.

Common questions about Monolith Data Center Expansion (Hallam)

Answered directly from the verified filings and local actions on this page.

Who is building Monolith Data Center Expansion (Hallam)?

Monolith is the developer. No construction contractor is named on the record yet.

How much power and water does Monolith Data Center Expansion (Hallam) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Monolith Data Center Expansion (Hallam) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. ‘We need to embrace it’: Hallam commission hears data center plans - nebraskapublicmedia.org (opens in a new tab), nebraskapublicmedia.org, July 16, 2026, local outlet
  2. Nebraska carbon black plant set to host data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 13, 2026, news outlet
  3. Monolith data center nears approval (opens in a new tab), Omaha World-Herald, September 18, 2026, local outlet
  4. Hallam landowners face stark choice on data center - nebraskapublicmedia.org (opens in a new tab), nebraskapublicmedia.org, August 24, 2026, local outlet
  5. Data center developers eyeing land near Hallam - 1011now.com (opens in a new tab), 1011now.com, August 27, 2026, local outlet
  6. Hallam residents pack town hall for Monolith's proposed data center expansion - nebraskapublicmedia.org (opens in a new tab), nebraskapublicmedia.org, July 24, 2026, local outlet
  7. Monolith seeks to build data center in Hallam, application to be submitted by mid-July - 1011now.com (opens in a new tab), 1011now.com, July 10, 2026, local outlet
  8. Hallam planning commission delays vote on Monolith’s proposed data center - nebraskapublicmedia.org (opens in a new tab), nebraskapublicmedia.org, August 20, 2026, local outlet

8 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Monolith Data Center Expansion (Hallam)", https://datacenterrecord.org/projects/monolith-data-center-expansion-hallam-ne, last verified September 18, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Monolith Data Center Expansion (Hallam)", https://datacenterrecord.org/projects/monolith-data-center-expansion-hallam-ne. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
40.80917, -96.67806
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Lincoln), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 18, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Monolith Data Center Expansion (Hallam) · 8 sources, 1 entry · basis and source tier on every row · verified September 18, 2026