Data Center Record.

Proposed Built from one source

NextEra and Brookfield Kentucky Data Center Campus

Paducah, McCracken County, KYDeveloper: NextEra / BrookfieldCensus GEOID 21145

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

NextEra and Brookfield plan a $100 billion data center campus in Kentucky. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 6 other published records in Kentucky
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
NextEra / Brookfield as stated by the source
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year Reported by others: 4.6 GW (Daily Energy Insider (opens in a new tab)); 2.6 GW (Daily Energy Insider (opens in a new tab)), and 3 more under Comparisons. Their figure, not the record's.
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it NextEra / Brookfield as stated by the source October 22, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

How much power it needs, also reported: 4.6 GW, 2026 (Daily Energy Insider (opens in a new tab): Project will generate 4.6 gigawatts of newly built generation resources); 2.6 GW, 2026 (Daily Energy Insider (opens in a new tab): Project will include 2.6 gigawatts battery energy storage); 2 GW, 2026 (Daily Energy Insider (opens in a new tab): Project will include 2 gigawatts natural gas generation); 1.8 GW, 2026 (Daily Energy Insider (opens in a new tab): Campus will provide 1.8 gigawatts utility capacity); 1.2 GW, 2026 (Daily Energy Insider (opens in a new tab): Campus will provide 1.2 gigawatts computing capacity) .

Jobs once it runs, also reported: 8,000 jobs, 2026 (WPSD Local 6 (opens in a new tab): The Paducah American Energy Hub data center at the Department of Energy Paducah Site is a historic $100 billion investment that will potentially create 8,000 construction jobs and 600 permanent ones., Daily Energy Insider (opens in a new tab): Project expected to create 8000 construction jobs); 600 jobs, 2026 (Daily Energy Insider (opens in a new tab): Project expected to create 600 permanent operations jobs) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

4 corrections to this record

Every correction, with its reason

Every correction on the record is on the corrections page.

The site

Where in Paducah is not in the public record. The pin marks the center of Paducah, not a building, and the outline is McCracken County.

The site map is at the top of the page.

Where
Paducah, McCracken County, Kentucky
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Comparisons

3 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

5 figures, 1 source
Show each source's words
  • 4.6 GW, Daily Energy Insider: Project will generate 4.6 gigawatts of newly built generation resources
  • 2.6 GW, Daily Energy Insider: Project will include 2.6 gigawatts battery energy storage
  • 2 GW, Daily Energy Insider: Project will include 2 gigawatts natural gas generation
  • 1.8 GW, Daily Energy Insider: Campus will provide 1.8 gigawatts utility capacity
  • 1.2 GW, Daily Energy Insider: Campus will provide 1.2 gigawatts computing capacity

Construction jobs

1 figure, 1 source
Show each source's words
  • 8,000 jobs, Daily Energy Insider: Project expected to create 8000 construction jobs

Permanent jobs

2 figures, 2 sources
Show each source's words
  • 8,000 jobs, WPSD Local 6: The Paducah American Energy Hub data center at the Department of Energy Paducah Site is a historic $100 billion investment that will potentially create 8,000 construction jobs and 600 permanent ones.
  • 600 jobs, Daily Energy Insider: Project expected to create 600 permanent operations jobs

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is NextEra and Brookfield Kentucky Data Center Campus?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building NextEra and Brookfield Kentucky Data Center Campus?

NextEra / Brookfield is the developer. No construction contractor is named on the record yet.

Who will use NextEra and Brookfield Kentucky Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does NextEra and Brookfield Kentucky Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does NextEra and Brookfield Kentucky Data Center Campus stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Paducah or McCracken County decided about it?

No decision by Paducah or McCracken County about data centers is on the record. The McCracken County page and the Kentucky scorecard list every rated row the day a person publishes one.

What is still unknown about NextEra and Brookfield Kentucky Data Center Campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Brookfield, NextEra to Develop $100B Data Center Campus at DOE's Paducah Site, Paired With 4.6 GW of Dedicated Generation (opens in a new tab), www.powermag.com, August 17, 2026, news outlet
  2. NextEra, Brookfield Plan $100 Billion Kentucky Data Center Campus - EnergyNow.com (opens in a new tab), EnergyNow.com, September 4, 2026, news outlet
  3. NextEra, Brookfield lead $100B plan for AI data center campus at former Kentucky nuclear site - Daily Energy Insider (opens in a new tab), Daily Energy Insider, September 6, 2026, news outlet

3 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "NextEra and Brookfield Kentucky Data Center Campus", https://datacenterrecord.org/projects/nextera-and-brookfield-kentucky-data-center-campus-ky, last verified October 22, 2026. CSV · JSON
Cite this page

Data Center Record, "NextEra and Brookfield Kentucky Data Center Campus", https://datacenterrecord.org/projects/nextera-and-brookfield-kentucky-data-center-campus-ky. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
37.07089, -88.64448
How the location is known
Location is the city center; exact site not disclosed.
Published
September 5, 2026
Last verified
October 22, 2026
Undisclosed in public filings
Location source, Coordinate source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · NextEra and Brookfield Kentucky Data Center Campus · 3 sources, 0 entries, 0 decisions nearby · basis and source tier on every row · verified October 22, 2026