● Proposed Campus Reported July 7, 2026 · 1 Building

Marietta Cobb Parkway Data Center

Street address 1295 Cobb Pkwy N, Marietta, GA 30062, Cobb County assessor parcel Exact, on the parcel [1] mariettaga.gov

Overview, regulatory gates and specifications

The Marietta city council voted 5 2 to approve a new data center. [2] Filings on the record specify disclosed capacity of 18 MW (the developer's figure), 1 planned or operational building. [1] The data center utilizes a closed loop cooling system. [5]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
18 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
18 MW
the developer's figure

Equivalent to ~14,940 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.9% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
zoning application

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1295 Cobb Pkwy N, Marietta, GA 30062.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
18 MW developer figure Equivalent to the continuous electricity demand of about 14,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[1] mariettaga.gov
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[1] mariettaga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
echosuite / Cobb Parkway Developer LLC as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Marietta Cobb Parkway Data Center, capacity: 18 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 18 ÷ 10,245 = 0.0018 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Georgia Chamber

Georgia Digital Infrastructure Alliance

DID Recorded statement at Marietta Daily Journal (September 14, 2026)
SAID Georgia Digital Infrastructure Alliance announced a six figure statewide advertising campaign on data center development benefits (September 14, 2026) mdjonline.com (opens in a new tab)

Parks Huff

attorney for developer

DID Recorded statement at 95.5 WSB (July 2, 2026)
SAID Parks Huff, attorney for developer, stated facility is needed and location is ideal for data center due to infrastructure proximity (July 2, 2026) wsbradio.com (opens in a new tab)

Susan C.

Marietta resident

DID Recorded statement at 95.5 WSB (July 2, 2026)
SAID Susan C. requested moratorium on data centers in Marietta pending further study (July 2, 2026) wsbradio.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: echosuite / Cobb Parkway Developer LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Marietta Cobb Parkway Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 18 MW the developer's figure [1] mariettaga.gov
Site Footprint (Acres)
Data Hall Buildings 1 building zoning application [1] mariettaga.gov
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 12, 2026 Marietta, GA Marietta City Council 18 MW Data Center Rezoning and Six Month Moratorium Vote Marietta City Council 3 clips

Marietta City Council voted 5 to 2 to approve an 18 megawatt, 11 acre data center with a 1 million dollar sound mitigation condition while simultaneously imposing a six month moratorium on any new data center applications.

  1. Fox Business Broadcast Report Broadcast Report transcribed from local broadcast report
    "Five back to approving 18 megawatt 11 acre data center. A move some are calling controversial. Now, just weeks ago city council impose a six month moratorium on new data center request. This project was already in the pipeline when the moratorium took effect. My next guest sits on that city council and voted yes for the data center."
  2. Fox Business Broadcast Report Broadcast Report transcribed from local broadcast report
    "One 18 megawatts, it has zero negative impact on the ratepayer it has a closed loop system and we are making sound better for the residents that are kind of f on the other it cited then is now because it's right and sigh 75 required over a million dollars in sound mitigation. This absolutely hurts no one could only help the citizens of Marietta were open for business"
  3. Fox Business Broadcast Report Broadcast Report transcribed from local broadcast report
    "Writing about with the latest ot meetings over this data center, people and I understand reticence from people in the rural south, to these data center projects. But, people have lost their minds. The one you just approved is not even an a.I. Data center. Please tell the audience is going to be used for law enforcement, medical and"
July 8, 2026 Marietta, GA Marietta data center approved despite pushback Marietta City Council 3 clips

Marietta City Council members and residents debated a proposed pause on new data center applications and the creation of a Marietta Data Center Advisory Committee to rewrite municipal zoning standards.

  1. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "pollution a concern when it comes to these data centers. So, silencers going to be installed. They have to conduct independent testing and they have to stay away from the city's municipal water and waste water supply cuz of course there's concern from residents about what this could mean for my water bill. still though that was not enough for some people in the crowd. This is what happened inside Council Chambers right after that vote. Okay, so it was a 5-2 vote came after a"
  2. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "self storage property or at least part of it into an 18 megawatt data center. The property owner says it won't increase water consumption. It will include measures to minimize noise. Meanwhile, council members heard from people on both sides of the debate. It really doesn't generate anything positive for the community. It just extracts well from the community. It's going to make Marietta basically one of the"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "artificial intelligence. He says this data center is all about processing information quickly. So, that project has the green light, although they do have to abide by some of those conditions that I just laid out for you. By the way, if you're asking yourself, Marietta, Marietta, I know you were just talking about a data center moratorium in Marietta. Yes, we were. Just last month that same city council approved a"
Said and filed

Said and filed

Statements and filings, side by side

Statement and primary filing State of Georgia / Georgia Public Service Commission Hearing Record → Project Dossier: marietta-data-center-ga →
Tax Abatements Power & Grid Moratorium
Column A · Dated Statement
Brian P. Kemp Governor of Georgia
Venue: Georgia Governor's Veto Statement on House Bill 1192
"Vetoed House Bill 1192, which would have suspended Georgia's state sales and use tax exemption for high tech data center equipment for two years, claiming that pausing the tax exemption would undermine Georgia's grid planning and business climate."
Fox Business
Column B · Primary Government Record
Georgia Public Service Commission Docket 44280 & Docket 56002 Integrated Resource Plan and 100 MW Large Load Rule Filings
Georgia PSC Docket 44280 (2023 IRP Update) · Docket 56002 (2025 and 2026 IRP) · Rule 515-3-4 (>100 MW Large Load Tariff)
Agency or Venue: Georgia Public Service Commission
"Primary filings in Georgia Public Service Commission Docket 44280 and the 2025 and 2026 Integrated Resource Plan (Docket 56002) document that 80 percent of Georgia Power's projected multi gigawatt load growth comes from hyperscale data centers, requiring emergency fossil fuel and battery capacity additions and prompting the Commission to adopt Rule 515-3-4 imposing special contract and billing terms on any facility exceeding 100 megawatts."
Grady Newsource

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    The data center utilizes a closed loop cooling system.

    · echosuite / Cobb Parkway Developer LLC · Reported August 21, 2026 · Privacy enhanced player · loads on click

    [5] youtube.com

  2. (content date)

    The Marietta city council voted 5 2 to approve a new data center.

    [1] mariettaga.gov

  3. · Status: approved (source date; the content gives no date of its own)

    Self storage facility targeted for 18 MW data center in Marietta

    [2] datacenterdynamics.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
phoenixNAP Atlanta Marietta, Cobb County 4 mi Running phoenixNAP 1 building
Equinix Atlanta (AT4) Atlanta, Cobb County 7 mi Running Equinix 1 building
Edged Atlanta Data Center Campus (ATL01) Atlanta, Fulton County 13 mi Running Edged 180 MW
1611 Ellsworth Data Center and Mixed Use Development (DRI #4506) Atlanta, Fulton County 13 mi Proposed Youngwoo & Associates, LLC 1 building
STACK Infrastructure ATL02 Lithia Springs Lithia Springs, Douglas County 15 mi Running STACK Infrastructure 1 building
DC BLOX Atlanta (ATL1) Atlanta, DeKalb County 15 mi Running DC Blox 1 building

Blank cell: not disclosed by any source on file.

Common questions about Marietta Cobb Parkway Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Marietta Cobb Parkway Data Center?

echosuite / Cobb Parkway Developer LLC is the developer. No construction contractor is named on the record yet.

How much power and water does Marietta Cobb Parkway Data Center say it needs?

Power: 18 MW (the developer's figure, mariettaga.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Marietta Cobb Parkway Data Center stand today?

It is approved, as reported July 7, 2026. The newest entry, reported August 21, 2026: The data center utilizes a closed loop cooling system. [5]

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. City of Marietta City Council: Rezoning Approval for 1295 Cobb Pkwy N Data Center (August 12, 2026) (opens in a new tab), City of Marietta

Reporting

  1. Self storage facility in Marietta, Georgia, targeted for 18MW data center (opens in a new tab), Data Center Dynamics, July 7, 2026, trade press
  2. Marietta data center project approved after hours of heated debate - WSB-TV (opens in a new tab), wsbtv.com, August 13, 2026, local outlet
  3. Marietta council votes 5-2 for new data center - FOX 5 Atlanta (opens in a new tab), FOX 5 Atlanta, August 12, 2026, local outlet
  4. Marietta, GA approves 11 acre data center (opens in a new tab), YouTube, August 21, 2026, video

5 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Marietta Cobb Parkway Data Center", https://datacenterrecord.org/projects/marietta-data-center-ga, last verified August 21, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Marietta Cobb Parkway Data Center", https://datacenterrecord.org/projects/marietta-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.9724, -84.5342
How the location is known
Location from the county parcel record.
Location source
https://www.mariettaga.gov/AgendaCenter
Coordinate source
City of Marietta City Council rezoning approval (August 12, 2026)
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
18 MW, the developer's figure
Published
September 4, 2026
Last verified
August 21, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Marietta Cobb Parkway Data Center · 5 sources, 3 entries · basis and source tier on every row · verified August 21, 2026

Download CSV JSON