Data Center Record.

Reported Built from one source

Marietta Data Center

The Marietta city council voted 5-2 to approve a new data center. It is reported, as reported July 7, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 18 MW (YouTube); 12 MW (95.5 WSB). Their figure, not the record's.
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 18 MW, 2026 (YouTube: The data center project near Interstate 75 and Delk Road will have a capacity of 18 megawatts.); 12 MW, 2026 (95.5 WSB: Data center facility is 12 megawatts) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Cobb County and Marietta about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Marietta The city council required 1 million dollars in sound mitigation for the data center project. youtube.com
Marietta The city council imposed a 6 month moratorium on new data center requests. youtube.com
Marietta Marietta City Council voted 5-2 approving an 18 megawatt, 11 acre data center. youtube.com
Marietta Developers must install silencers and conduct independent testing for the data center. youtube.com
Marietta Marietta City Council approved a six month temporary moratorium on new data center applications. youtube.com
Marietta Marietta City Council approved rezoning for an 18 megawatt data center on a 5-2 vote after hours of debate. youtube.com
3 earlier decisions on the county's rows
DateWhoDecisionSource
Marietta Marietta city council voted 5-2 to approve a new data center fox5atlanta.com
Marietta Marietta City Council expected to consider rezoning matter at July 8 meeting wsbradio.com
Marietta Marietta Planning Commission voted 4-3 in favor of rezoning 10 acres for data center project wsbradio.com

What happened

  1. (source date; the content gives no date of its own)

    The data center utilizes a closed loop cooling system. [4]

  2. · Status: rumored (source date; the content gives no date of its own)

    Self storage facility targeted for 18 MW data center in Marietta [1]

The full Marietta Data Center timeline, in order

1 correction to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

Georgia Digital Infrastructure Alliance announced a six figure statewide advertising campaign on data center development benefits
Georgia Chamber, Georgia Digital Infrastructure Alliance · September 14, 2026 · paraphrased · Marietta Daily Journal local outlet
Parks Huff, attorney for developer, stated facility is needed and location is ideal for data center due to infrastructure proximity
Parks Huff, attorney for developer · July 2, 2026 · paraphrased · 95.5 WSB local outlet

Every statement about data centers in Georgia, by speaker

1 more statement on this page

Marietta resident

Susan Clark requested moratorium on data centers in Marietta pending further study

July 2, 2026, 95.5 WSB · 95.5 WSB local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Cobb County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 19 other published records in Georgia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Marietta, Cobb County, Georgia
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 18 MW, YouTube: The data center project near Interstate 75 and Delk Road will have a capacity of 18 megawatts.
  • 12 MW, 95.5 WSB: Data center facility is 12 megawatts

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Marietta Data Center?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building Marietta Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

Who will use Marietta Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Marietta Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Marietta Data Center stand today?

It is reported, as reported July 7, 2026. The newest entry, reported August 21, 2026: The data center utilizes a closed loop cooling system. [4]

What has Marietta or Cobb County decided about it?

Marietta: The city council required 1 million dollars in sound mitigation for the data center project. (reported August 21, 2026, source); and Marietta: The city council imposed a 6 month moratorium on new data center requests. (reported August 21, 2026, source). 9 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Marietta Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is building it, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Self storage facility in Marietta, Georgia, targeted for 18MW data center, Data Center Dynamics, July 7, 2026, trade press
  2. Marietta data center project approved after hours of heated debate - WSB-TV, wsbtv.com, August 13, 2026, local outlet
  3. Marietta council votes 5-2 for new data center - FOX 5 Atlanta, FOX 5 Atlanta, August 12, 2026, local outlet
  4. Marietta, GA approves 11 acre data center, YouTube, August 21, 2026, video

4 sources on file.

Cite this record

Data Center Record, "Marietta Data Center", https://datacenterrecord.org/projects/marietta-data-center-ga, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Marietta Data Center", https://datacenterrecord.org/projects/marietta-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
marietta-data-center-ga
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ga/cobb-county/marietta
Coordinates
33.95333, -84.54056
Location precision
county
Location source
County seat (Marietta), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-17