Census GEOID: 34031 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 primary sources

● Running First recorded September 14, 2026 · 2 Buildings

Digital Realty Clifton Data Center Campus (EWR20 and EWR21)

Street address 2 Peekay Drive and 100 Delawanna Avenue, Clifton, NJ 07014, Passaic County verified address Exact, at the address [3] Digital Realty: Digital Realty EWR20

Overview, regulatory gates and specifications

Digital Realty operates a 2 building colocation and interconnection campus (EWR20 and EWR21) at 2 Peekay Drive and 100 Delawanna Avenue in Clifton, Passaic County, New Jersey, with 24 MW of critical power capacity. [1] Digital Realty lists Digital Realty EWR20, Digital Realty EWR21 at Clifton, New Jersey on its own page of data center locations, read September 14, 2026. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [3]
24 MW
the developer's figure

Equivalent to ~19,920 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [3]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2 Peekay Drive and 100 Delawanna Avenue, Clifton, NJ 07014.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
24 MW developer figure Equivalent to the continuous electricity demand of about 19,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[3] digitalrealty.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[3] digitalrealty.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2012 (14 years)
Who leads it
Digital Realty as stated by the source
Official project website
digitalrealty.com (opens in a new tab) verified October 28, 2026
digitalrealty.com (opens in a new tab)
Archived promotional websites
digitalrealty.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Digital Realty Clifton Data Center Campus (EWR20 and EWR21), capacity: 24 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 24 ÷ 10,245 = 0.0023 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Digital Realty
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Digital Realty Clifton Data Center Campus (EWR20 and EWR21).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 24 MW 24 MW the developer's figure [3] digitalrealty.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [3] digitalrealty.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Digital Realty lists Digital Realty EWR20, Digital Realty EWR21 at Clifton, New Jersey on its own page of data center locations, read September 14, 2026.

    [3] digitalrealty.com

Nearest data centers in New Jersey

Verified data center records in New Jersey within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Digital Realty Clifton (EWR21 100 Delawanna Avenue) Clifton, Passaic County Less than 1 mi Running Digital Realty 1 building
365 Data Centers Carlstadt (NJ3) Carlstadt, Bergen County 4 mi Running 365 Data Centers 6 MW
H5 Data Centers Secaucus (NJ01) Secaucus, Hudson County 4 mi Running H5 Data Centers 6 MW
Centersquare Secaucus Data Center (EWR5) Secaucus, Hudson County 5 mi Running Centersquare 12 MW
Evocative Secaucus Data Center (EWR1) Secaucus, Hudson County 5 mi Running Evocative 8 MW
Equinix Secaucus International Business Exchange Campus (NY2, NY4, NY5, NY6, and NY3) Secaucus, Hudson County 5 mi Running Equinix 85 MW

Blank cell: not disclosed by any source on file.

Common questions about Digital Realty Clifton Data Center Campus (EWR20 and EWR21)

Answered directly from the verified filings and local actions on this page.

Who is building Digital Realty Clifton Data Center Campus (EWR20 and EWR21)?

Digital Realty is the developer. No construction contractor is named on the record yet.

How much power and water does Digital Realty Clifton Data Center Campus (EWR20 and EWR21) say it needs?

Power: 24 MW (the developer's figure, digitalrealty.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Digital Realty Clifton Data Center Campus (EWR20 and EWR21) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: Digital Realty Trust (opens in a new tab), U.S. Environmental Protection Agency
  2. Digital Realty: Americas data centers (opens in a new tab), Digital Realty, September 14, 2026
  3. Digital Realty: Digital Realty EWR20 (opens in a new tab), Digital Realty, September 14, 2026
  4. Digital Realty: Digital Realty EWR21 (opens in a new tab), Digital Realty, September 14, 2026

4 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Digital Realty Clifton Data Center Campus (EWR20 and EWR21)", https://datacenterrecord.org/projects/digital-realty-clifton-nj, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Digital Realty Clifton Data Center Campus (EWR20 and EWR21)", https://datacenterrecord.org/projects/digital-realty-clifton-nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
40.8315, -74.1342
How the location is known
Location from the site's street address.
Location source
https://www.digitalrealty.com/data-centers/americas/new-york/ewr20
Coordinate source
EPA FRS 110070566426 / Digital Realty EWR20 and EWR21 specifications
Location source number
[1]
Location last verified
October 4, 2026
EPA registry id
110070566426
How capacity was disclosed
the developer's figure
Capacity, if disclosed
24 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Digital Realty Clifton Data Center Campus (EWR20 and EWR21) · 4 sources, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON