Data centers in New Jersey

New Jersey has 16 data center sites, 0 buildings where disclosed on the record: 10 running, 5 proposed and 1 stalled or cancelled. The counties with the most are Middlesex County (5) and Hudson County (2), and records are in 9 of 21 counties. The largest proposal is Nebius AI Data Center (Vineland) in Cumberland County, 300 MW (third party estimate); it is reported, as reported September 12, 2026.

New Jersey decides case by case. From the state's own rule: Governor Mikie Sherrill signed legislation S3379 on August 27, 2026 requiring data centers to self report water and energy usage every six months to the New Jersey Board of Public Utilities.

8 sites the EPA's registry shows and no record has verified are on the map apart from the count. What not yet verified means.

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

Projects and campuses on the record

Facility and countyStageOperatorPower (MW)Latest entry
Bell Works Data Center Holmdel, Monmouth CountyProposed
Montgomery Township Former J&J Site Data Center Montgomery Township, Somerset CountyProposed
Nebius AI Data Center (Vineland) Vineland, Cumberland CountyProposedDataOne for Nebius Group / Microsoft300New Jersey Department of Environmental Protection inspected DataOne facility in Vineland on July 29, 2026 and found 62 stationary natural gas generators operating without required preconstruction permits and operating certificates. timesofindia.indiatimes.com (opens in a new tab) international outlet reported September 24, 2026
Andover Data Center Andover, Sussex CountyProposed
Data Center (South Brunswick / Princeton area) South Brunswick, Middlesex CountyProposed
Digital Realty Clifton Clifton, Passaic CountyRunningDigital Realty
Equinix NY11 Carteret, Middlesex CountyRunningEquinix
QTS Piscataway Piscataway, Middlesex CountyRunningQTS Data Centers
CyrusOne Somerset NYM1 Somerset, Somerset CountyRunningCyrusOne
CyrusOne Totowa NYM2 Totowa, Passaic CountyRunningCyrusOne
Equinix NY7 North Bergen, Hudson CountyRunningEquinix
Equinix Secaucus Secaucus, Hudson CountyRunningEquinixEquinix said the facility has operated since 2001 communitynews.org (opens in a new tab) local outlet reported September 17, 2026
QTS East Windsor East Windsor, Mercer CountyRunningQTS Data Centers
Equinix NY1 Newark, Essex CountyRunningEquinixEquinix has been located in Secaucus since 2001, for 25 years. patch.com (opens in a new tab) local outlet reported September 15, 2026
Jersey Avenue Data Center New Brunswick, Middlesex CountyStalled or cancelledA proposed data center on Jersey Avenue in New Brunswick, New Jersey was removed from the redevelopment plan by city council following public backlash and protests. datacenterdynamics.com (opens in a new tab) query feed February 20, 2026
Digital Realty Piscataway Piscataway, Middlesex CountyRunningDigital RealtyLogicWorks leased space from Digital Realty in New Jersey datacenterknowledge.com (opens in a new tab) trade press reported May 31, 2024

A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record. All 16 New Jersey projects.

Every New Jersey record 16 records, and 8 sites not yet verified listed apart · sort by any column · blank cell: not disclosed

RecordPlaceStageOperatorMWBasisLocatedTierVerified
Bell Works Data CenterHolmdel, MonmouthProposedcentroid42026-10-22
3AY Sabey @ Ocean Cnty Business PKToms River, OceanNot yet verifiedSabey Data CentersEPA registry22026-10-20
Applied Digital CorpMoorestown, BurlingtonNot yet verifiedApplied DigitalEPA registry22026-10-20
Cologix NNJ1Parsippany, MorrisNot yet verifiedCologixEPA registry22026-10-20
Cologix NNJ2Cedar Knolls, MorrisNot yet verifiedCologixEPA registry22026-10-20
Evoque Data Center Solutions, PNJ1Piscataway, MiddlesexNot yet verifiedEPA registry22026-10-20
Montgomery Township Former J&J Site Data CenterMontgomery Township, SomersetProposedcentroid42026-10-20
Morgan Stanley Data CenterSomerset, SomersetNot yet verifiedEPA registry22026-10-20
NJ-1 Data CenterPiscataway, MiddlesexNot yet verifiedEPA registry22026-10-20
T Mobile USA INC Parsippany Data CenterParsippany, MorrisNot yet verifiedT Mobile USA INCEPA registry22026-10-20
Digital Realty CliftonClifton, PassaicRunningDigital RealtyEPA registry22026-10-04
Equinix NY11Carteret, MiddlesexRunningEquinixsite22026-10-04
QTS PiscatawayPiscataway, MiddlesexRunningQTS Data CentersEPA registry22026-10-04
Nebius AI Data Center (Vineland)Vineland, CumberlandProposedDataOne300third party estimatecentroid42026-09-25
Andover Data CenterAndover, SussexProposedcentroid42026-09-17
CyrusOne Somerset NYM1Somerset, SomersetRunningCyrusOnecentroid22026-09-17
CyrusOne Totowa NYM2Totowa, PassaicRunningCyrusOnecentroid22026-09-17
Data Center (South Brunswick / Princeton area)South Brunswick, MiddlesexProposedcentroid12026-09-17
Equinix NY7North Bergen, HudsonRunningEquinixcentroid22026-09-17
Equinix SecaucusSecaucus, HudsonRunningEquinixcentroid12026-09-25
QTS East WindsorEast Windsor, MercerRunningQTS Data Centerscentroid12026-09-17
Equinix NY1Newark, EssexRunningEquinixcentroid22026-09-17
Jersey Avenue Data CenterNew Brunswick, MiddlesexStalled or cancelledcentroid32026-10-07
Digital Realty PiscatawayPiscataway, MiddlesexRunningDigital Realtycentroid22026-09-17

Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.

Every New Jersey county (21)

9 of 21 counties have a record. A county without one is listed, not linked, until its first published record.

CountyCensus GEOIDProjectsRules
Middlesex County3402352
Hudson County3401721
Passaic County3403120
Somerset County3403520
Cumberland County3401111
Essex County3401311
Mercer County3402110
Monmouth County3402510
Sussex County3403710
Bergen County3400301
Hunterdon County3401901
Morris County3402701
Union County3403903
Warren County3404101
Atlantic County3400100
Burlington County3400500
Camden County3400700
Cape May County3400900
Gloucester County3401500
Ocean County3402900
Salem County3403300

A county without a record is listed, not linked.

The rules in New Jersey 19 rows · rating rests only on a binding act in force

What the state and its counties and cities have decided. Each row is rated by what it has decided, open, case by case, restrictive or closed, never by whether that is good or bad.

BodyLevelRatingIn force untilLatest actActsVerified
New Jerseystatecase by case until February 27, 20272027-02-27Governor Mikie Sherrill signed legislation S3379 on August 27, 2026 requiring data centers to self report water and energy usage every six months to the New Jersey Board of Public Utilities. roi-nj.com (opens in a new tab) local outlet Aug 27, 202642 acts on this row
Every act on the New Jersey row
  1. filing

    New Jersey lawmaker introduced a bill to require greater transparency in data center development by barring secret non disclosure agreements and forcing public disclosure of plans.

    tapinto.net (opens in a new tab) local outlet

  2. rate rule

    Gov. Sherrill signed legislation requiring data centers to bring their own clean energy and establishes separate rate class

    roi-nj.com (opens in a new tab) local outlet

  3. event

    DataOne data center fined $1.07 million for violations of the Air Pollution Control Act

    roi-nj.com (opens in a new tab) local outlet

  4. event

    New Jersey Department of Environmental Protection fined DataOne $1.07 million for operating 62 natural gas generators without required air permits on September 22, 2026

    datacenterknowledge.com (opens in a new tab) trade press

    Also reported by 14 sources
  5. moratorium

    New Jersey lawmakers debated a data center moratorium

    cbsnews.com (opens in a new tab) national outlet

  6. event

    Gov. Mikie Sherrill announced a comprehensive data center plan with guardrails requiring data centers to pay their fair share for energy, be accountable for water and energy use, protect the environment, create good paying union jobs, and invest in communities.

    northjersey.com (opens in a new tab) local outlet

  7. event

    New Jersey Department of Environmental Protection issued a fine for violating the Air Pollution Control Act on September 22, 2026, after a July 29 inspection found 62 large natural gas generators operating without required permits.

    northjersey.com (opens in a new tab) local outlet

  8. event

    Record $1.07 million fine issued against DataOne, largest in New Jersey data center enforcement history

    news.bgov.com (opens in a new tab) news outlet

    Also reported by 4 sources
  9. moratorium

    Governor Sherrill took a hands off message that each town is responsible for their own decisions on data centers rather than supporting a statewide moratorium

    foodandwaterwatch.org (opens in a new tab) news outlet

  10. rate rule

    New Jersey legislature passed bill S731/A796 requiring large load customers to pay for all needed grid infrastructure upgrades and at least 85 percent of projected power requirements for 10 years

    dailyenergyinsider.com (opens in a new tab) news outlet

  11. moratorium

    Assemblywoman Annette Quijano introduced a bill in Trenton that would delay approvals, construction, expansion, subsidies and tax incentives for large AI data centers

    longisland.news12.com (opens in a new tab) local outlet

    Also reported by 1 source
  12. denial

    New Jersey town rejected data center project in redevelopment area.

    pix11.com (opens in a new tab) news outlet

  13. event

    State rolled out guidance to help municipalities negotiate community benefit agreements with data center developers

    njbiz.com (opens in a new tab) local outlet

  14. moratorium

    New Jersey introduced AB 5482 for six month moratorium on data center approval and construction.

    mashable.com (opens in a new tab) national outlet

  15. event

    Governor Sherrill announced new data center rules requiring operators to report water and energy use to NJ Board of Public Utilities twice yearly for three years

    thedigestonline.com (opens in a new tab) news outlet

  16. event

    5,000 gallons of Diesel No. 2 spilled from Equinix fuel tank in Secaucus

    northjersey.com (opens in a new tab) local outlet

  17. event

    The fuel entered Anderson Creek, which flows into the Hackensack River

    newjersey.news12.com (opens in a new tab) local outlet

  18. event

    More than 5,000 gallons of diesel fuel leaked into Anderson Creek near Hackensack River from Equinix fuel tank in Secaucus

    yahoo.com (opens in a new tab) national outlet

  19. event

    New Jersey Department of Environmental Protection confirmed it issued no permits for any power generators at DataOne Campus

    communitynews.org (opens in a new tab) local outlet

  20. moratorium

    Lacey Township officials discussed a resolution supporting a temporary statewide moratorium on approval and development of large scale data centers

    patch.com (opens in a new tab) local outlet

  21. event

    New Jersey made $500 million in tax credits available for data centers before eliminating remaining $250 million in August

    dailycaller.com (opens in a new tab) national outlet

  22. event

    New Jersey Governor Mikie Sherrill signed binding executive order mandating energy usage and transparency and disclosure requirements

    news.bgov.com (opens in a new tab) news outlet

  23. event

    New Jersey enacted law requiring data center energy and water disclosure

    pro.stateaffairs.com (opens in a new tab) national outlet

  24. event

    Governor Sherrill issued guidance to New Jersey municipalities for data center development

    re-nj.com (opens in a new tab) news outlet

  25. event

    Governor Sherrill signed a bill establishing guardrails for data center development

    re-nj.com (opens in a new tab) news outlet

  26. event

    New Jersey passed a new law targeting AI data centers

    nj.com (opens in a new tab) local outlet

  27. event

    The bill secures fair wages for data center workers

    c-span.org (opens in a new tab) national outlet

  28. event

    Gov. Sherrill signed legislation on August 27 requiring data centers to self report water and energy use every six months

    roi-nj.com (opens in a new tab) local outlet

    Also reported by 1 source
  29. event

    New Jersey Governor signed bill holding data center developers accountable to communities through community benefit agreements covering water, power, noise, and wages

    c-span.org (opens in a new tab) national outlet

  30. event

    New Jersey Governor Mikie Sherrill signed legislation ending a $500 million tax credit program for data center development

    news.bloombergtax.com (opens in a new tab) news outlet

  31. event

    Governor Sherrill announced new state guidance to help municipalities negotiate community benefits agreements with data center developers

    westchester.news12.com (opens in a new tab) local outlet

    Also reported by 1 source
  32. event

    Governor Mikie Sherrill signed bill S-3379 requiring data center operators to submit semiannual water and energy usage reports to the Board of Public Utilities for 3 years

    njsendems.org (opens in a new tab) news outlet

    Also reported by 6 sources
  33. event

    Gov. Mikie Sherrill signed into law in August 2026 rules requiring more transparency from data center developers on energy and water use and establishing protections for surrounding communities.

    app.com (opens in a new tab) news outlet

  34. event

    Gov. Sherrill signed legislation in August requiring data centers to report energy and water use to the state every six months

    njbiz.com (opens in a new tab) local outlet

  35. event

    New Jersey enacted the End Data Center Tax Credits Act in August 2026 eliminating remaining $250 million available for AI and data center projects.

    newsweek.com (opens in a new tab) national outlet

  36. event

    New Jersey passed a law in July requiring large scale data centers to pay a different electricity rate than homeowners

    patch.com (opens in a new tab) local outlet

  37. rate rule

    Gov. Sherrill signed legislation in July creating a separate utility rate class for large data centers

    njbiz.com (opens in a new tab) local outlet

  38. rate rule

    Governor Sherrill in July approved a state law requiring data centers to pay for their own electricity needs and cover the cost of connecting to the state's electric grid

    news.bgov.com (opens in a new tab) news outlet

  39. event

    The bill passed the Assembly 76-3 and the Senate 39-0 on June 30, 2026

    roi-nj.com (opens in a new tab) local outlet

  40. event

    Governor Mikie Sherrill took office in January and campaigned on maintaining a close watch of data centers; she signed legislation to make data centers pay their fair share for energy and be accountable for water and energy use.

    njspotlightnews.org (opens in a new tab) local outlet

  41. event

    The tax credit program was created in 2024 under then Governor Phil Murphy

    news.bloombergtax.com (opens in a new tab) news outlet

  42. event

    Hackensack River section added to federal Superfund list in 2022

    streamlinefeed.co.ke (opens in a new tab) international outlet

Last verified October 5, 2026.

422026-10-05
Raritancitynot ratedRaritan Borough council voted unanimously to introduce a nine month moratorium on data centers on October 6. tapinto.net (opens in a new tab) local outlet Oct 61 act on this row
Every act on the Raritan row
  1. moratorium adopted

    Raritan Borough council voted unanimously to introduce a nine month moratorium on data centers on October 6.

    tapinto.net (opens in a new tab) local outlet

Last verified October 6, 2026.

12026-10-06
New Brunswickcitynot ratedNo dated act on this row yet.2026-09-17
Montvillecitynot ratedMontville Township Committee approved Resolution 2026-350 on September 23, 2026 authorizing a master plan reexamination on data centers. patch.com (opens in a new tab) local outlet Sep 232 acts on this row
Every act on the Montville row
  1. approval

    Montville Township Committee approved Resolution 2026-350 on September 23, 2026 authorizing a master plan reexamination on data centers

    patch.com (opens in a new tab) local outlet

  2. event

    Planning Board discussed data center zoning on August 27

    patch.com (opens in a new tab) local outlet

Last verified September 23, 2026.

22026-09-23
Manchestercitynot ratedManchester approved a measure restricting data centers. longisland.news12.com (opens in a new tab) local outlet Reported Sep 151 act on this row
Every act on the Manchester row
  1. approval

    Manchester approved a measure restricting data centers

    longisland.news12.com (opens in a new tab) local outlet

Last verified September 15, 2026.

12026-09-15
Jacksoncitynot ratedNo dated act on this row yet.2026-08-29
Bridgewater Townshipcitycase by caseThe ordinance amends Chapter 126 of the township code and follows the township's September 30, 2025 Comprehensive Master Plan. patch.com (opens in a new tab) local outlet Aug 25, 20269 acts on this row
Every act on the Bridgewater Township row
  1. litigation

    A developer sued Bridgewater on October 5, 2026, challenging the data center ordinance, arguing it conflicts with an approved redevelopment plan that permits data centers at 1200 Route 22

    mycentraljersey.com (opens in a new tab) news outlet

  2. statement

    Bridgewater Planning Board reviewed ordinance prior to Council approval and found it not inconsistent with township Master Plan

    patch.com (opens in a new tab) local outlet

  3. litigation

    Bridgewater approved regulations on data centers at its September 8 council meeting; the township's zoning does not include data centers as a permitted use in any part of the town but officials have not outright banned them over concerns about potential lawsuits

    patch.com (opens in a new tab) local outlet

  4. ordinance

    Bridgewater adopted a data center ordinance on September 3, 2026, requiring closed loop cooling systems and heat recovery technology and mandating use variances instead of automatic Planning Board approval

    mycentraljersey.com (opens in a new tab) news outlet

  5. ordinance

    Bridgewater Township Planning Board backed a data center ordinance

    patch.com (opens in a new tab) local outlet

  6. ordinance

    Bridgewater Township Council approved Ordinance 26-15 on September 2, 2026 establishing supplemental requirements for data centers

    patch.com (opens in a new tab) local outlet

    Also reported by 1 source
  7. ordinance

    The ordinance amends Chapter 126 of the township code and follows the township's September 30, 2025 Comprehensive Master Plan

    patch.com (opens in a new tab) local outlet

  8. ordinance

    Bridgewater Township Council unanimously introduced an ordinance on August 20, 2026 to set new land use requirements for data centers and hyperscale data centers, with public hearing and final action scheduled for September 3

    patch.com (opens in a new tab) local outlet

  9. event

    Township adopted redevelopment plan in 2025 for 1200 Route 22 property allowing data center as possible use for rear portion

    patch.com (opens in a new tab) local outlet

Last verified October 5, 2026.

92026-10-05
Chathamcitynot ratedChatham Borough Council voted unanimously on October 13, 2026 to ban data centers in all zoning districts. newjerseyhills.com (opens in a new tab) local outlet Oct 131 act on this row
Every act on the Chatham row
  1. moratorium

    Chatham Borough Council voted unanimously on October 13, 2026 to ban data centers in all zoning districts.

    newjerseyhills.com (opens in a new tab) local outlet

Last verified October 13, 2026.

12026-10-13
Hunterdon Countycountynot ratedHunterdon County Department of Planning and Land Use hosts data center informational meeting for municipal officials on Tuesday. tapinto.net (opens in a new tab) local outlet Sep 151 act on this row
Every act on the Hunterdon County row
  1. event

    Hunterdon County Department of Planning and Land Use hosts data center informational meeting for municipal officials on Tuesday

    tapinto.net (opens in a new tab) local outlet

Last verified September 19, 2026.

12026-09-19
Jersey Citycitynot ratedResidents in a New Jersey city rejected a data center proposal from Big Tech. businessinsider.com (opens in a new tab) national outlet Reported Feb 211 act on this row
Every act on the Jersey City row
  1. denial

    Residents in a New Jersey city rejected a data center proposal from Big Tech

    businessinsider.com (opens in a new tab) national outlet

Last verified February 21, 2026.

12026-02-21
Kenilworthcitynot ratedKenilworth planning board unanimously approved a data center. newjersey.news12.com (opens in a new tab) local outlet Reported Aug 291 act on this row
Every act on the Kenilworth row
  1. approval

    Kenilworth planning board unanimously approved a data center

    newjersey.news12.com (opens in a new tab) local outlet

Last verified August 29, 2026.

12026-08-29
Lindencitynot ratedLinden introduced an ordinance at Monday night's City Council meeting to restrict AI data centers. longisland.news12.com (opens in a new tab) local outlet Sep 141 act on this row
Every act on the Linden row
  1. ordinance

    Linden introduced an ordinance at Monday night's City Council meeting to restrict AI data centers

    longisland.news12.com (opens in a new tab) local outlet

Last verified September 19, 2026.

12026-09-19
Newarkcitynot ratedNewark City Council voted on September 9 2026 to approve a resolution supporting a 12 month moratorium on data center development and expansion in the city. patch.com (opens in a new tab) local outlet Sep 91 act on this row
Every act on the Newark row
  1. moratorium

    Newark City Council voted on September 9 2026 to approve a resolution supporting a 12 month moratorium on data center development and expansion in the city

    patch.com (opens in a new tab) local outlet

    Also reported by 1 source

Last verified September 21, 2026.

12026-09-21
Phillipsburgcitynot ratedPhillipsburg Land Use Board approved a master plan update supporting a townwide data center ban. tapinto.net (opens in a new tab) local outlet Sep 291 act on this row
Every act on the Phillipsburg row
  1. moratorium adopted

    Phillipsburg Land Use Board approved a master plan update supporting a townwide data center ban.

    tapinto.net (opens in a new tab) local outlet

Last verified September 29, 2026.

12026-09-29
South Brunswickcitynot ratedSouth Brunswick neighbors lost initial court case against data center but appealed. tapinto.net (opens in a new tab) local outlet Reported Sep 31 act on this row
Every act on the South Brunswick row
  1. litigation

    South Brunswick neighbors lost initial court case against data center but appealed

    tapinto.net (opens in a new tab) local outlet

Last verified September 3, 2026.

12026-09-03
Spotswoodcitynot ratedSpotswood city council sent a data center zoning proposal to the planning board. tapinto.net (opens in a new tab) local outlet Reported Sep 101 act on this row
Every act on the Spotswood row
  1. event

    Spotswood city council sent a data center zoning proposal to the planning board

    tapinto.net (opens in a new tab) local outlet

Last verified September 10, 2026.

12026-09-10
Springfield Townshipcitynot ratedSpringfield Township Committee voted 3-2 to table Resolution 2026-253 on September 8, 2026. tapinto.net (opens in a new tab) local outlet Sep 81 act on this row
Every act on the Springfield Township row
  1. event

    Springfield Township Committee voted 3-2 to table Resolution 2026-253 on September 8, 2026

    tapinto.net (opens in a new tab) local outlet

Last verified September 22, 2026.

12026-09-22
Vinelandcitycase by caseNo permits issued nor any permit applications under review for power generators at DataOne. latitudemedia.com (opens in a new tab) news outlet Aug 28, 20264 acts on this row
Every act on the Vineland row
  1. event

    DataOne installed 62 gas generators without required air pollution permits

    nbcphiladelphia.com (opens in a new tab) local outlet

  2. event

    New Jersey Department of Environmental Protection fined DataOne more than 1 million dollars for operating 62 natural gas powered generators without a permit at the Vineland data center.

    whyy.org (opens in a new tab) local outlet

    Also reported by 6 sources
  3. approval

    Vineland Planning Board voted 8-1 to approve the project's second phase

    nj1015.com (opens in a new tab) local outlet

  4. litigation

    Local residents filed lawsuit in New Jersey state court over noise pollution from data center

    latitudemedia.com (opens in a new tab) news outlet

Last verified September 24, 2026.

42026-09-24
Wallingtoncitynot ratedWallington borough removed all references to data centers from a redevelopment plan for 33 acres of former dairy land after weeks of resident opposition. newsweek.com (opens in a new tab) national outlet Reported Oct 191 act on this row
Every act on the Wallington row
  1. event

    Wallington borough removed all references to data centers from a redevelopment plan for 33 acres of former dairy land after weeks of resident opposition.

    newsweek.com (opens in a new tab) national outlet

Last verified October 19, 2026.

12026-10-19

Reported: the source's date; the item names no day of its own. A month with no day: the source names the month and not the day. A rating rests only on a binding act in force; "not rated" means no person has set one. A blank cell means the record holds nothing for it.

New Jersey laws and the full scorecard

Bills and laws in New Jersey

6 signed into law, 50 bills tracked

50 bills tracked in the New Jersey legislature, 6 of them signed into law, grouped by where each stands. A row opens its own page; the New Jersey laws page has what each law requires.

No official summary on file for any of these 13 measures; each row links to the legislature's page for the text.

Signed into law 6, 5 shown here

1 more signed into law on the New Jersey laws page.

50 bills tracked, 6 signed · LegiScan, CC BY 4.0

NumberSessionStatusDateTitle
S. 4304 2026-2027 Regular Session In committee 2026-10-01 Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.
S. 4657 2026-2027 Regular Session In committee 2026-10-01 Modifies certain DEP permit application requirements for data centers.
S. 4658 2026-2027 Regular Session In committee 2026-10-01 Requires data centers to submit annual report to DEP; requires DEP to establish Data Center Transparency Dashboard.
S. 4659 2026-2027 Regular Session In committee 2026-10-01 Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete.
A. 4801 2026-2027 Regular Session In committee 2026-09-28 Establishes certain protections against demand by large-load addition customers in State.
A. 5482 2026-2027 Regular Session In committee 2026-09-14 Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers; creates Artificial Intelligence Data Center Impact Commission.
A. 5373 2026-2027 Regular Session In committee 2026-09-10 Concerns noise abatement of data centers.
A. 5396 2026-2027 Regular Session In committee 2026-09-10 Requires data centers to submit water supply emergency contingency plan to DEP.
A. 5397 2026-2027 Regular Session In committee 2026-09-10 Requires data centers to submit construction phase water usage plan to DEP.
S3379 2026-2027 Regular Session Signed 2026-08-27 Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
S4390 2026-2027 Regular Session Signed 2026-08-27 "End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.
A796 2026-2027 Regular Session Signed 2026-07-07 Requires electric public utilities to develop and apply special rules for certain data centers to protect non-data center customers from increased costs.
A. 5165 2026-2027 Regular Session In committee 2026-06-28 "End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.
A. 5294 2026-2027 Regular Session In committee 2026-06-18 "Responsible Data Center Development and Resource Protection Act"; establishes Statewide framework concerning siting, land use approval, energy sourcing, water use, and environmental impacts of large load data center development.
A. 5224 2026-2027 Regular Session In committee 2026-06-08 Requires data center developers to disclose certain information to public and elected officials before preliminary site plan consideration under MLUL.
A. 4096 2026-2027 Regular Session In committee 2026-06-04 Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
S. 4400 2026-2027 Regular Session In committee 2026-06-04 Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
S. 4401 2026-2027 Regular Session In committee 2026-06-04 Requires BPU to conduct study on environmental, infrastructural, and financial impacts of data center development in State.
S. 4402 2026-2027 Regular Session In committee 2026-06-04 "Responsible Data Center Development and Resource Protection Act"; establishes Statewide framework concerning siting, land use approval, energy sourcing, water use, and environmental impacts of large load data center development.
A. 4945 2026-2027 Regular Session In committee 2026-05-07 Requires BPU to conduct study on environmental, infrastructural, and financial impacts of data center development in State.
S. 4062 2026-2027 Regular Session In committee 2026-03-23 Establishes certain protections against demand by large-load addition customers in State.
A. 4769 2026-2027 Regular Session In committee 2026-03-19 Requires certain State agencies to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
A. 3966 2026-2027 Regular Session In committee 2026-03-16 Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
A. 4696 2026-2027 Regular Session In committee 2026-03-16 Requires owner or operator of data center to submit water and energy usage report to BPU.
S. 680 2026-2027 Regular Session In committee 2026-03-16 Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.
S. 3639 2026-2027 Regular Session In committee 2026-02-24 Requires BPU, DCA, and DEP to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
S. 3611 2026-2027 Regular Session In committee 2026-02-19 Directs planning boards to submit certain data center development plans to BPU and State Planning Commission and requires State Planning Commission approval for data center development under MLUL; excludes data centers from economic development subsidies.
S. 731 2026-2027 Regular Session In committee 2026-02-12 Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.
A. 5462 2024-2025 Regular Session Vetoed 2026-01-20 Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.
S4928 2024-2025 Regular Session Signed 2026-01-20 Requires payment of prevailing wage for certain data center construction.
A. 1170 2026-2027 Regular Session In committee 2026-01-13 Requires submission of energy usage plan to BPU for proposed artificial intelligence data centers; requires all electricity for artificial intelligence data centers to be derived from new clean energy sources.
A. 2770 2026-2027 Regular Session In committee 2026-01-13 Establishes surcharge for electric public utility service to certain data centers during certain periods; establishes "Grid Modernization Fund" in BPU.
A. 2774 2026-2027 Regular Session In committee 2026-01-13 Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.
A. 3611 2026-2027 Regular Session Failed 2026-01-13 Requires payment of prevailing wage for certain data center construction.
S. 2274 2026-2027 Regular Session In committee 2026-01-13 Requires owner or operator of data center to submit water and energy usage report to BPU.
S. 4307 2024-2025 Regular Session In committee 2026-01-08 Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increasaed costs.
A. 6237 2024-2025 Regular Session In committee 2026-01-05 Requires payment of prevailing wage for certain data center construction.
S. 5003 2024-2025 Regular Session In committee 2025-12-15 Prohibits agreements intended to conceal certain information concerning the development of data centers under MLUL.
A. 6181 2024-2025 Regular Session In committee 2025-12-08 Prohibits agreements intended to conceal certain information concerning the development of data centers under MLUL.
A. 6040 2024-2025 Regular Session In committee 2025-11-17 Establishes surcharge for electric public utility service to certain data centers during certain periods; establishes "Grid Modernization Fund" in BPU.
S. 4811 2024-2025 Regular Session In committee 2025-11-06 Requires BPU, DCA, and DEP to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
S. 4827 2024-2025 Regular Session In committee 2025-11-06 Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
S. 4293 2024-2025 Regular Session Vetoed 2025-10-20 Requires owner or operator of data center to submit water and energy usage report to BPU.
A5466 2024-2025 Regular Session Signed 2025-07-08 Requires BPU to study effects of data centers on electricity costs.
A. 5892 2024-2025 Regular Session In committee 2025-06-27 Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
A. 5548 2024-2025 Regular Session In committee 2025-06-26 Requires owner or operator of data center to submit water and energy usage report to BPU.
S. 4318 2024-2025 Regular Session In committee 2025-05-22 Requires BPU to study effects of data centers on electricity costs.
A. 5564 2024-2025 Regular Session In committee 2025-04-10 Requires submission of energy usage plan to BPU for proposed artificial intelligence data centers; requires all electricity for artificial intelligence data centers to be derived from new clean energy sources.
S. 4143 2024-2025 Regular Session In committee 2025-03-17 Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.
S. 3432 2024-2025 Regular Session Signed 2024-07-25 An Act concerning the development of artificial intelligence innovations, ventures, and facilities, and amending and supplementing P.L.2020, c.156.

50 bills tracked in New Jersey; 2026-2027 Regular Session, legislature in session; last checked October 26, 2026. The last check found no bill not already tracked; the 50 tracked bills stand. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.

How this state's members voted

H.R. 9340, Ratepayer Protection Act: U.S. House of Representatives, roll call 312, September 16, 2026. On Motion to Suspend the Rules and Pass, as Amended. Passed, 417 to 3. New Jersey's members: 12 yea, 0 nay. How each member voted

MemberPartyPosition
ConawayDYea
GottheimerDYea
KeanRYea
McIverDYea
MejiaDYea
MenendezDYea
NorcrossDYea
PalloneDYea
PouDYea
Smith (NJ)RYea
Van DrewRYea
Watson ColemanDYea

A blank party cell means the clerk's roll gives none.

H.R. 9340, Ratepayer Protection Act: U.S. Senate, roll call 254, September 30, 2026. On Cloture on the Motion to Proceed H.R. 9340. Cloture on the Motion to Proceed Rejected, 57 to 43. New Jersey's members: 0 yea, 2 nay. How each member voted

MemberPartyPosition
Booker (D-NJ)DNay
Kim (D-NJ)DNay

A blank party cell means the clerk's roll gives none.

Positions as the clerk records them. How bills and votes are recorded.

What was said

These facilities can require tremendous amounts of electricity and water, yet they don't necessarily create the number of permanent jobs you would expect from a project of that size. For a city like Linden, the potential benefits simply do not outweigh the concerns.
Derek Armstead, Mayor, Linden · October 22, 2026 · quoted · News12 | New Jersey (opens in a new tab) local outlet · also reported by 1 more source
Anne Sofie Bäckar, ChemSec executive director, stated that top ten global producers of forever chemicals (PFAS) plan to ramp up production quotas on the back of the data center boom
Anne-Sofie Bäckar, ChemSec executive director · September 16, 2026 · paraphrased · Futurism (opens in a new tab) national outlet

Every New Jersey statement, by speaker (94)

87 more on this page, one per speaker and claim; 94 statements in all
"Linden knows industry better than most places in New Jersey, and they see that data centers just aren't worth it. That should send a powerful message to the rest of the state"
Ben Dziobek, Executive Director, Climate Revolution Action Network Statement to NJ.com NJ.com (opens in a new tab) national outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Statement to NJ.com.

Primary source: NJ.com (opens in a new tab).

"I'm asking you to take a look at what's proposed, sit with us and talk about it"
Mike Gonnelli, Mayor, Secaucus New Jersey Sports and Exposition Authority Board meeting Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: New Jersey Sports and Exposition Authority Board meeting.

Primary source: Patch (opens in a new tab).

"I want to commend him (Gonnelli) for trying to seek limits, but the word that frightens me is 'future data centers,' Since 6.5-square-mile Secaucus is already inundated with data centers, I have to question how many future data centers are proposed for this town?"
Kathy McFarlande, Local resident, Secaucus New Jersey Sports and Exposition Authority Board meeting Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: New Jersey Sports and Exposition Authority Board meeting.

Primary source: Patch (opens in a new tab).

"He wants any new data center that opens in town to be no taller than two stories, if it's located near a residential part of town."
Mike Gonnelli, Mayor, Secaucus NJSEA meeting Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: NJSEA meeting.

Primary source: Patch (opens in a new tab).

Matt Moench, Bridgewater mayor, stated he has instructed township attorneys to reactivate a lawsuit and will spend four years preventing any shovel from being put in the ground at 1200 Route 22 for a warehouse or data center

Central New Jersey News (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Central New Jersey News (opens in a new tab).

Frank Pallone, U.S. Rep., D-6th Dist., ranking Democrat on the House Energy and Commerce Committee, said large AI data centers are going to be a problem in densely populated areas.

NJ.com (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NJ.com (opens in a new tab).

Congressman Pallone wrote to FERC on September 28, 2026, urging it to strengthen PJM's data center proposals

Frank Pallone Jr., Energy and Commerce Committee Ranking Member ROI-NJ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: ROI-NJ (opens in a new tab).

Matt Smith, New Jersey State Director at Food & Water Watch, called for Governor Sherrill to enforce a statewide moratorium on data centers

New Jersey State Director, Food & Water Watch Food & Water Watch (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Food & Water Watch (opens in a new tab).

AI data centers cited as posing risks to overburdened communities through electricity and water consumption, air and noise pollution, and limited transparency

South Ward Environmental Alliance and Ironbound Community Corporation Patch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

South Ward Environmental Alliance and Ironbound Community Corporation calling for one year moratorium on AI data center development in Newark

Patch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Secaucus Mayor Mike Gonnelli says the NJ Sports and Exposition Authority authorizes data centers to be built in Secaucus

Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Gonnelli said 88% of Secaucus is in the Meadowlands and the NJSEA approves the data centers there

Secaucus Mayor Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Daikin plans to triple its PFAS capacity in response to semiconductor demand

ChemSec Fortune (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fortune (opens in a new tab).

Chemours produces or uses more PFAS substances than any other company and between half and two thirds of its $5.8 billion revenue comes from PFAS production

ChemSec Fortune (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fortune (opens in a new tab).

Chemours developing products for data center cooling with new PFAS refrigerants launched in August

ChemSec Fortune (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fortune (opens in a new tab).

PFAS producers expanding capacity for AI data center cooling, semiconductor manufacturing and lithium ion battery materials

ChemSec Fortune (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fortune (opens in a new tab).

Anibal Ramos Jr North Ward Councilman sponsored resolution requiring closed loop chillers and water efficient cooling technology for data centers

Anibal Ramos Jr. Patch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Ben Dziobek, Climate Revolution Action Network executive director, stated that data centers create problems that extend beyond municipal boundaries including pollution and strain on electrical grid

Futurism (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Futurism (opens in a new tab).

New Jersey Department of Environmental Protection and U.S. Coast Guard monitoring found no observed impacts to the Hackensack River or wildlife from the diesel spill.

Lawrence Hajna, New Jersey Department of Environmental Protection spokesman Patch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Secaucus Mayor Michael Gonnelli stated the spill was caused by a computer glitch

Bisnow (opens in a new tab) trade press project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Bisnow (opens in a new tab).

Also reported by: Metro.co.uk (opens in a new tab) international outlet , NBC New York (opens in a new tab) local outlet , Daily Mail (opens in a new tab) news outlet , streamlinefeed.co.ke (opens in a new tab) international outlet .

New Jersey residents have largely been left to municipalities to decide on new data centre proposals

Ben Dziobek, Climate Revolution Action Network executive director Yahoo (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Yahoo (opens in a new tab).

Mount Arlington Mayor Mike Stanzilis addressed concerns about electric bills, water use, local taxes, and community benefits from data center investment

onnj.com (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: onnj.com (opens in a new tab).

James Barrood says global spending on data centers may reach 7 trillion dollars by 2030 per McKinsey

entrepreneur and technology advocate NJBIZ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NJBIZ (opens in a new tab).

Ben Dziobek of Climate Revolution Action Network called for statewide moratorium on data centers

cbsnews.com (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: cbsnews.com (opens in a new tab).

Also reported by: Yahoo (opens in a new tab) national outlet , Patch (opens in a new tab) local outlet , Attack of the Fanboy (opens in a new tab) news outlet , njtoday.news (opens in a new tab) news outlet .

Said again: September 15, 2026 ( Patch (opens in a new tab) local outlet ), September 15, 2026 ( Attack of the Fanboy (opens in a new tab) news outlet ), September 16, 2026 ( njtoday.news (opens in a new tab) news outlet ).

Barrood says Google and Meta are investing 165 million dollars nationwide toward skilled trades training programs

entrepreneur and technology advocate NJBIZ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NJBIZ (opens in a new tab).

Barrood argues New Jersey data centers should use closed loop recycled water to limit freshwater overuse during droughts

entrepreneur and technology advocate NJBIZ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NJBIZ (opens in a new tab).

Young people in Union County, New Jersey marched on August 13 to protest Rep. Tom Kean Jr. for accepting thousands of dollars from Big Tech AI firms.

Young people protesters In These Times (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: In These Times (opens in a new tab).

The report outlined how data centers and other large electricity customers could help finance and scale distributed capacity.

RMI RMI (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: RMI (opens in a new tab).

RMI published a report in November 2025 making the case that off site demand flexibility, energy efficiency, and distributed generation can help meet rapidly growing data center electricity demand.

RMI (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: RMI (opens in a new tab).

Since the report's publication, new laws, commission decisions, and utility proposals have begun creating pathways for large customers to fund distributed capacity.

RMI RMI (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: RMI (opens in a new tab).

Anibal Ramos Jr. led the resolution sponsored for temporary moratorium on data center development

Newark Municipal Council member Insider NJ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Insider NJ (opens in a new tab).

Officials may consider middle ground options such as restricting data centers to industrial zones, requiring larger setbacks from homes, adding noise limits, and mandating traffic and utility reviews.

Manchester officials The Cool Down (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Cool Down (opens in a new tab).

Demonstrators held anti data center signs stretching from outside the meeting to Route 37, with passing drivers cheering them on.

Manchester residents The Cool Down (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Cool Down (opens in a new tab).

Data center development is becoming less of a business issue and more of a democratic issue

Chris Gale, Gale Strategies LLC (op-ed author) HackerNoon (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: HackerNoon (opens in a new tab).

Data center construction is becoming a central campaign issue in the 2026 midterm elections in New Jersey

Micah Rasmussen, director of the Rebovich Institute for New Jersey Politics WHYY (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WHYY (opens in a new tab).

Montville Township Planner Joseph Burgis warned officials against outright bans and proposed smart zoning policies for data centers

TAPinto (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: TAPinto (opens in a new tab).

Assemblyman Michael Venezia said requiring consistent reporting will give a clearer picture of data center impact and allow the state to better understand demands and plan accordingly

New Jersey Assembly member ROI-NJ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ROI-NJ (opens in a new tab).

Governor Sherrill's data center plan includes four pillars: requiring data centers to bring own clean energy, creating separate ratepayer class for data centers, mandating transparency through energy and water reporting, and establishing labor standards with prevailing wage requirements

New Jersey Governor Patch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Senate Majority Leader M. Teresa Ruiz said the bill is a commonsense measure to give policymakers tools to protect consumers and manage resources responsibly

New Jersey Senate Majority Leader ROI-NJ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ROI-NJ (opens in a new tab).

Ben Dziobek, executive director of Climate Revolution Action Network New Jersey, said the bill is toothless legislation that does nothing to stop data centers from draining local water or driving up residents' utility bills

ROI-NJ (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ROI-NJ (opens in a new tab).

Also reported by: Bergen Record (opens in a new tab) local outlet .

Said again: September 14, 2026 ( Bergen Record (opens in a new tab) local outlet ).

Mayor Joseph Hankins stated the repeal removes data centers from the redevelopment plan entirely and reflects the township's commitment to ensuring future development aligns with community character, resources and priorities

Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

U.S. Rep. Chris Smith said AI data centers pose critical environmental risks and impose undue stresses on local resources including water and electricity that place financial burdens on ratepayers and residents

U.S. Representative Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Developer Ruben Torsky said he is not opposed to reasonable regulation of data centers and that his proposed facility at the former Greymark property is not an AI data center or AI computing facility

data center developer Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Councilman Jake Ephros called for protecting working families from utility bill increases due to data centers

Jersey City Councilman Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Mayor James Solomon said data centers employ almost nobody

Jersey City Mayor Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

Councilman Joel Brooks called for a statewide moratorium on data center construction

Jersey City Councilman Patch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Patch (opens in a new tab).

"Given that P.L.2025, c.98 initiates a study about the energy impacts of data centers, amending that existing law to incorporate the specific aspects of energy and water usage in this bill is a natural fit."
Philip D. Murphy, Governor of New Jersey Office of the Governor of New Jersey (opens in a new tab) primary source · [Archived Copy] (opens in a new tab)
Context & source notes

Provenance: Quoted; said in the source itself.

Primary source: Office of the Governor of New Jersey (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

"These changes are designed to streamline related efforts to evaluate the impacts of data centers on State and regional resources, and to create an initial assessment after which future reporting requirements may be considered based upon the information gathered."
Philip D. Murphy, Governor of New Jersey Office of the Governor of New Jersey (opens in a new tab) primary source · [Archived Copy] (opens in a new tab)
Context & source notes

Provenance: Quoted; said in the source itself.

Primary source: Office of the Governor of New Jersey (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

On the November 3, 2026 ballot in New Jersey: U.S. Senate (4), U.S. House, District 1 (2), U.S. House, District 2 (3), U.S. House, District 3 (4), U.S. House, District 4 (2), U.S. House, District 5 (3), U.S. House, District 6 (2), U.S. House, District 7 (3), U.S. House, District 8 (4), U.S. House, District 9 (3), U.S. House, District 10 (2), U.S. House, District 11 (3), U.S. House, District 12 (4); 3 of 39 candidates with a statement on data centers on the record. Every candidate.

Already running in New Jersey

10 sites are serving load, 3 of them in Middlesex County.

See the 10 running sites
  1. CyrusOne Somerset NYM1 Somerset, Somerset County Running · Operational since 2016 (10 years)
  2. CyrusOne Totowa NYM2 Totowa, Passaic County Running · Operational since 2015 (11 years)
  3. Digital Realty Clifton Clifton, Passaic County Running · Operational since 2012 (14 years)
  4. Digital Realty Piscataway Piscataway, Middlesex County Running · Operational since 2013 (13 years)
  5. Equinix NY1 Newark, Essex County Running · Operational since 2000 (26 years)
  6. Equinix NY11 Carteret, Middlesex County Running · Operational since 2014 (12 years)
  7. Equinix NY7 North Bergen, Hudson County Running · Operational since 2009 (17 years)
  8. Equinix Secaucus Secaucus, Hudson County Running · Operational since 2001 (25 years)
  9. QTS East Windsor East Windsor, Mercer County Running · Operational since 2014 (12 years)
  10. QTS Piscataway Piscataway, Middlesex County Running · Operational since 2016 (10 years)

Questions about New Jersey data centers

How many data center projects are on the record in New Jersey?

16 projects are on the record in New Jersey: 5 reported, 10 running, 1 cancelled and 8 not yet verified. Each is listed under Projects with its status history and sources. Resources: the questions people ask about data centers

answered from the rows above

Where in New Jersey are they?

Records are in 9 counties: Middlesex County (5), Hudson County (2), Passaic County (2), Somerset County (2), Cumberland County (1), Essex County (1), Mercer County (1), Monmouth County (1) and Sussex County (1). The county table lists every county with its count, zero included. Resources: the questions people ask about data centers

answered from the rows above

How much power is disclosed for data centers in New Jersey?

300 MW is disclosed across 1 of 16 records: Nebius AI Data Center (Vineland) (300 MW, third party estimate, source (opens in a new tab)). The other 15 records have not disclosed capacity. Resources: the questions people ask about data centers

answered from the rows above

How much water do data centers in New Jersey say they will use?

1 of 16 records states a water figure: Nebius AI Data Center (Vineland), 20,000,000 gallons a year, third party estimate, source (opens in a new tab). The other 15 records have not disclosed it. Resources: the questions people ask about data centers

answered from the rows above

Who is building data centers in New Jersey?

9 developers are named on the record: Equinix (4 records), Cologix (2 records), CyrusOne (2 records), Digital Realty (2 records), QTS Data Centers (2 records), Applied Digital, DataOne, Sabey Data Centers and T Mobile USA INC. Each name opens the record, where the developer's source is listed. Resources: the questions people ask about data centers

answered from the rows above

Which counties and cities in New Jersey have rules about data centers?

18 county and city rows are on the record, 2 of them rated: Bridgewater Township is rated case by case: The ordinance amends Chapter 126 of the township code and follows the township's September 30, 2025 Comprehensive Master Plan, August 25, 2026, source (opens in a new tab), Vineland is rated case by case: No permits issued nor any permit applications under review for power generators at DataOne, August 28, 2026, source (opens in a new tab) and Raritan has no rating yet: Raritan Borough council voted unanimously to introduce a nine month moratorium on data centers on October 6, source (opens in a new tab). The state's own row is rated case by case, with 42 dated acts listed under the scorecard. Resources: the questions people ask about data centers

answered from the rows above

What is proposed or being built near me in New Jersey, by county?

5 records are not yet running. Cumberland County: Nebius AI Data Center (Vineland) (reported); Middlesex County: Data Center (South Brunswick / Princeton area) (reported); Monmouth County: Bell Works Data Center (reported); Somerset County: Montgomery Township Former J&J Site Data Center (reported); and Sussex County: Andover Data Center (reported). A county name opens its page with the map and every record there. Resources: the questions people ask about data centers

answered from the rows above

What has the state of New Jersey itself decided?

6 state laws are on the record: S3379 (signed, August 27, 2026, source (opens in a new tab)), S4390 (signed, August 27, 2026, source (opens in a new tab)) and A796 (signed, July 7, 2026, source (opens in a new tab)) and 3 more under Laws. The state's own scorecard row carries 42 dated acts, the newest reported October 5, 2026; the laws page has what each law requires in the words of its text. Resources: the questions people ask about data centers

answered from the rows above

Disclosed figures

300 MW power, water from 1 record

summed only where a record disclosed the figure

FigureDisclosed totalDisclosedWithout a figureBasis
Power300 MW1151 third party estimate
Water, stated per day015
Water, stated per year20,000,000 gallons a year1151 third party estimate
Permanent jobs016
Tax each year016

A blank cell means no record in New Jersey disclosed the figure. Third party figures on the same metrics are listed apart below; a figure a project disclosed about itself is never mixed with them.

FigureDisclosed totalDisclosedWithout a figureBasis
Power300 MW1151 third party estimate
Water, stated per year20,000,000 gallons a year1151 third party estimate
Permanent jobs016
Tax each year016

A blank total means no record disclosed the figure; the count without one says how many.

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

The disclosed totals are in the table above.

No source on file states what any of the 16 tracked facilities in New Jersey are for. 8 sites not yet verified are named apart and are not in that number.

What each use disclosed

UseRecordsPowerWaterJobsTax each year
No stated use16300 MW20,000,000 gallons a year

A blank cell means no record with that use disclosed the figure.

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

No source on file states how any of the 16 tracked facilities in New Jersey are cooled. 8 sites not yet verified are named apart and are not in that number.

Sources read for New Jersey

19 sources

19 sources are read for New Jersey:

Newspapers
NJ.com
Public broadcaster
WBGO
Economic development
New Jersey Economic Development Authority
Search feeds
16 news searches
Every feed, with its kind and tier

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Only what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Data centers in New Jersey", https://datacenterrecord.org/states/nj, updated October 26, 2026. CSV · JSON · GeoJSON
Cite this page

Data Center Record, "Data center records in New Jersey", https://datacenterrecord.org/states/nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
State code
NJ
Rating of the state's own row
Case by case
Count by status
reported 5, running 10, cancelled 1, not yet verified 8
Located records
3 located, 13 at a centroid, 0 without coordinates

Researcher view · New Jersey · 16 data center sites, 0 buildings where disclosed, 19 rule rows, 50 bills · basis and source tier on every row · verified October 26, 2026