QTS Princeton East Windsor Data Center Campus (PJC1)

Street address 50 Millstone Road, East Windsor, NJ 08520, Mercer County verified address Exact, at the address [1] QTS Data Centers: All locations

Overview, regulatory gates and specifications

QTS Data Centers operates a 2 building, 32 MW hyperscale and enterprise data center campus at 50 Millstone Road in East Windsor, Mercer County, New Jersey, with an additional campus expansion under review by the East Windsor Planning Board. [2] QTS Data Centers lists QTS East Windsor at East Windsor, New Jersey on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
32 MW
the developer's figure

Equivalent to ~26,560 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 50 Millstone Road, East Windsor, NJ 08520.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
32 MW developer figure Equivalent to the continuous electricity demand of about 26,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.3 percent of New York City's summer peak demand in 2024.
[1] q.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] q.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
QTS Data Centers as stated by the source
Official project website
q.com (opens in a new tab) verified October 28, 2026
q.com (opens in a new tab)
Archived promotional websites
q.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. QTS Princeton East Windsor Data Center Campus (PJC1), capacity: 32 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 32 ÷ 10,245 = 0.0031 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Princeton East Windsor Data Center Campus (PJC1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 32 MW 32 MW the developer's figure [1] q.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [1] q.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: approved (content date)

    QTS Data Centers sought and received East Windsor Planning Board approval for an expansion of its existing East Windsor facility after a delayed vote and public hearing with resident concerns over noise, utilities, and tax benefits.

    [2] datacenterdynamics.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    QTS Data Centers lists QTS East Windsor at East Windsor, New Jersey on its own page of data center locations, read September 14, 2026.

    [1] q.com

Nearest data centers in New Jersey

Verified data center records in New Jersey within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
South Brunswick Route 1 Data Center Campus Proposal South Brunswick, Middlesex County 8 mi Proposed South Brunswick Route 1 Redevelopment 2 buildings
New Brunswick Jersey Avenue Data Center Proposal New Brunswick, Middlesex County 16 mi Stalled or cancelled 90 Jersey Avenue Redevelopment 1 building
CyrusOne Somerset Data Center (NYM1) Somerset, Somerset County 18 mi Running CyrusOne 6 MW
Iron Mountain New Jersey Data Center Campus (NJE-1) Edison, Middlesex County 20 mi Running Iron Mountain Data Centers 28 MW
Digital Realty Piscataway Data Center Campus (EWR11 and EWR12) Piscataway, Middlesex County 20 mi Running Digital Realty 36 MW
DataBank Piscataway Data Center (EWR2) Piscataway, Middlesex County 20 mi Running DataBank 10 MW

Blank cell: not disclosed by any source on file.

Common questions about QTS Princeton East Windsor Data Center Campus (PJC1)

Answered directly from the verified filings and local actions on this page.

Who is building QTS Princeton East Windsor Data Center Campus (PJC1)?

QTS Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Princeton East Windsor Data Center Campus (PJC1) say it needs?

Power: 32 MW (the developer's figure, q.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does QTS Princeton East Windsor Data Center Campus (PJC1) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. QTS Data Centers: All locations (opens in a new tab), QTS Data Centers, September 14, 2026

Reporting

  1. Decision on QTS' planned expansion of data center in East Windsor, New Jersey, postponed - Data Center Dynamics (opens in a new tab), Data Center Dynamics, April 29, 2026, news outlet
  2. New QTS Data Center Receives Green Light from East Windsor Planning Board - TAPinto (opens in a new tab), TAPinto, May 5, 2026, local outlet
  3. The View From Flat Creek Trail: Shaking Walls, Lost Stars, and Life Beside the QTS Data Center - TheCitizen.com (opens in a new tab), TheCitizen.com, June 4, 2026, news outlet
  4. No Data Center Decision: QTS Application to Expand East Windsor Location Continues - TAPinto (opens in a new tab), TAPinto, April 28, 2026, local outlet
  5. A Packed Planning Board Hearing Debated the Future of an East Windsor Data Center Expansion - TAPinto (opens in a new tab), TAPinto, March 10, 2026, local outlet

6 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Princeton East Windsor Data Center Campus (PJC1)", https://datacenterrecord.org/projects/qts-east-windsor-nj, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Princeton East Windsor Data Center Campus (PJC1)", https://datacenterrecord.org/projects/qts-east-windsor-nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
40.2685, -74.5412
How the location is known
Location from the site's street address.
Location source
https://q.com/data-centers/
Coordinate source
East Windsor Township Planning Board / QTS Princeton specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
32 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · QTS Princeton East Windsor Data Center Campus (PJC1) · 6 sources, 2 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON