Data Center Record.
Census GEOID: 34023 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 reporting source

● Running First recorded October 21, 2026 · 2 Buildings

Iron Mountain New Jersey Data Center Campus (NJE-1)

Street address 3003 Woodbridge Avenue, Edison, NJ 08837, Middlesex County verified address Exact, at the address [1] ironmountain.com

Overview, regulatory gates and specifications

Iron Mountain Data Centers operates its 2 building NJE1 data center campus at 3003 Woodbridge Avenue in Edison, Middlesex County, New Jersey, delivering 28 MW of critical power capacity. [1] Verified facility status from New Jersey state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
28 MW
the developer's figure

Equivalent to ~23,240 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 3003 Woodbridge Avenue, Edison, NJ 08837.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
28 MW developer figure Equivalent to the continuous electricity demand of about 23,200 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.3 percent of New York City's summer peak demand in 2024.
[1] ironmountain.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] ironmountain.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2015 (11 years)
Who leads it
Iron Mountain Data Centers as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Iron Mountain New Jersey Data Center Campus (NJE-1), capacity: 28 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 28 ÷ 10,245 = 0.0027 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Iron Mountain Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Iron Mountain New Jersey Data Center Campus (NJE-1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 28 MW 28 MW the developer's figure [1] ironmountain.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [1] ironmountain.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from New Jersey state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] ironmountain.com

Nearest data centers in New Jersey

Verified data center records in New Jersey within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Digital Fortress Piscataway Data Center (PNJ) Piscataway, Middlesex County 6 mi Running Digital Fortress 6 MW
New Brunswick Jersey Avenue Data Center Proposal New Brunswick, Middlesex County 6 mi Stalled or cancelled 90 Jersey Avenue Redevelopment 1 building
DataBank Piscataway Data Center (EWR2) Piscataway, Middlesex County 6 mi Running DataBank 10 MW
Centersquare Piscataway Data Center (PNJ1 / EWR) Piscataway, Middlesex County 6 mi Running Centersquare 10 MW
Digital Realty Piscataway Data Center Campus (EWR11 and EWR12) Piscataway, Middlesex County 7 mi Running Digital Realty 36 MW
Equinix NY11 Carteret Financial Exchange Data Center Carteret, Middlesex County 8 mi Running Equinix 18 MW

Blank cell: not disclosed by any source on file.

Common questions about Iron Mountain New Jersey Data Center Campus (NJE-1)

Answered directly from the verified filings and local actions on this page.

Who is building Iron Mountain New Jersey Data Center Campus (NJE-1)?

Iron Mountain Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Iron Mountain New Jersey Data Center Campus (NJE-1) say it needs?

Power: 28 MW (the developer's figure, ironmountain.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Iron Mountain New Jersey Data Center Campus (NJE-1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Iron Mountain New Jersey Data Center Campus (NJE-1) Official Disclosure (opens in a new tab), Iron Mountain Data Centers, news outlet

1 source on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Iron Mountain New Jersey Data Center Campus (NJE-1)", https://datacenterrecord.org/projects/iron-mountain-data-center-new-jersey-nje1-edison-nj, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Iron Mountain New Jersey Data Center Campus (NJE-1)", https://datacenterrecord.org/projects/iron-mountain-data-center-new-jersey-nje1-edison-nj. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
40.5112, -74.3485
How the location is known
Location from the site's street address.
Location source
https://www.ironmountain.com/data-centers/locations/new-jersey-data-center
Coordinate source
Middlesex County MOD-IV / Iron Mountain NJE-1 specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
28 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Iron Mountain New Jersey Data Center Campus (NJE-1) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON