Equinix NY1

Equinix lists a data center at Newark, New Jersey among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 2 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Equinix
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Equinix as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Essex County and Newark about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Newark Newark City Council voted in favor of a resolution supporting a 12 month moratorium on AI data center development or expansion patch.com
Newark Newark City Council voted on September 9 2026 to approve a resolution supporting a 12 month moratorium on data center development and expansion in the city patch.com
Newark Newark Municipal Council approved a resolution calling for a temporary moratorium on data center development newjerseyglobe.com

What happened

  1. (source date; the content gives no date of its own)

    Equinix has been located in Secaucus since 2001, for 25 years. [3]

  2. · Status: running (the day the page was read; it gives no date of its own)

    Equinix lists Equinix NY1 at Newark, New Jersey on its own page of data center locations, read September 14, 2026. [2]

The full Equinix NY1 timeline, in order

What was said

AI data centers cited as posing risks to overburdened communities through electricity and water consumption, air and noise pollution, and limited transparency
South Ward Environmental Alliance and Ironbound Community Corporation · September 21, 2026 · paraphrased · Patch local outlet
Anibal Ramos Jr North Ward Councilman sponsored resolution requiring closed loop chillers and water efficient cooling technology for data centers
Anibal Ramos Jr., North Ward Councilman · September 17, 2026 · paraphrased · Patch local outlet

Every statement about data centers in New Jersey, by speaker

1 more statement on this page

South Ward Environmental Alliance and Ironbound Community Corporation calling for one year moratorium on AI data center development in Newark

September 21, 2026, Patch · Patch local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Newark is not in the public record. The pin marks the center of Newark, not a building, and the outline is Essex County.

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in New Jersey
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Newark, Essex County, New Jersey
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Equinix NY1?

Equinix is the developer. No construction contractor is named on the record yet.

How much power and water does Equinix NY1 say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Equinix NY1 stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 15, 2026: Equinix has been located in Secaucus since 2001, for 25 years. [3]

What has Newark or Essex County decided about it?

Newark: Newark City Council voted in favor of a resolution supporting a 12 month moratorium on AI data center development or expansion (reported September 21, 2026, source); and Newark: Newark City Council voted on September 9 2026 to approve a resolution supporting a 12 month moratorium on data center development and expansion in the city (September 9, 2026, source). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Equinix: United States and Canada colocation data centers, Equinix, September 14, 2026
  2. Equinix: Equinix NY1, Equinix, September 14, 2026

Reporting

  1. Update On Fuel Spill Into Creek From North Jersey Data Center - Patch, Patch, September 15, 2026, local outlet

3 sources on file.

Cite this record

Data Center Record, "Equinix NY1", https://datacenterrecord.org/projects/equinix-ny1-newark-nj, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Equinix NY1", https://datacenterrecord.org/projects/equinix-ny1-newark-nj. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
equinix-ny1-newark-nj
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/nj/essex-county/newark
Coordinates
40.7244717, -74.1725407
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-09-17