Data Center Record.
Census GEOID: 13097 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary and 1 reporting sources

● Running First recorded September 14, 2026 · 2 Buildings

Aligned ATL-01

Street address 1551 North River Rd, Lithia Springs, GA 30122, Douglas County permit coordinates Exact, the point of the EPA's facility record [3] EPA ECHO detailed facility report: Aligned Data Centers ATL01

Overview, regulatory gates and specifications

Aligned Data Centers lists a data center at Lithia Springs, Georgia among the sites it operates. [1] Filings on the record specify disclosed capacity of 180 MW (the developer's figure), 2 planned or operational buildings. [2] Aligned Data Centers lists Aligned ATL 01 at Lithia Springs, Georgia on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Georgia EPD Synthetic Minor
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
180 MW
the developer's figure

Equivalent to ~149,400 U.S. homes (U.S. EIA 830 homes/MW baseline) · 8.7% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1551 North River Rd, Lithia Springs, GA 30122.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
180 MW developer figure Equivalent to the continuous electricity demand of about 149,400 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
[2] aligneddc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[2] aligneddc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2024 (2 years)
Who leads it
Aligned Data Centers as stated by the source
Permitted legal entity
Aligned Data Centers ATL01, LLC what a permit allows
[3] echo.epa.gov
State air permit registration
GA EPD AIRS 097-00098, GA EPD Permit 7374-097-0098-S-01-0, EPA FRS 110071667203 state air permit register
State permit status
Georgia EPD Synthetic Minor Air Quality Permit No. 7374-097-0098 (S 01-0) issued February 19, 2024 the state's permit register, as of February 19, 2024, last verified November 11, 2026
[4] air.gaepd.org
Official project website
aligneddc.com (opens in a new tab) verified October 28, 2026
aligneddc.com (opens in a new tab)
Archived promotional websites
aligneddc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Aligned ATL-01, capacity: 180 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 180 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Aligned Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Aligned ATL-01.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 180 MW 180 MW the developer's figure [2] aligneddc.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [2] aligneddc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Development Authority of Fulton County (DAFC) Proponents Development Authority of Fulton County Board and Applicant Counsel
Venue: Development Authority of Fulton County $45 Million Data Center Tax Break Hearing
"Approving tens of millions of dollars in Development Authority of Fulton County property tax abatements on top of state sales tax exemptions is necessary to attract hyperscale data center expansions to Metro Atlanta."
Column B · Subsequent Recorded Position
Atlanta City Council Ordinance 24 O-1453 (BeltLine and Transit Data Center Ban) and Georgia PSC 2024 IRP Update
Atlanta Ordinance 24 O-1453 · Georgia PSC Docket No. 55378 (Georgia Power 2023-2024 IRP Update)
Agency or Venue: Atlanta City Council and Georgia Public Service Commission
"Following public backlash over $45 million tax breaks for facilities employing few workers while Georgia Power cited data centers for 80 percent of its 6,600 megawatt load surge in PSC Docket No. 55378, the Atlanta City Council voted to ban new data centers along the Atlanta BeltLine and within half a mile of MARTA rail stations."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Aligned Data Centers lists Aligned ATL 01 at Lithia Springs, Georgia on its own page of data center locations, read September 14, 2026.

    [2] aligneddc.com

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Microsoft Douglasville Data Center Campus (FTY01 / FTY02) Douglasville, Douglas County Less than 1 mi Running Microsoft 3 buildings
Flexential Atlanta Douglasville (ATL5) Douglasville, Douglas County Less than 1 mi Running Flexential 22.5 MW
DC BLOX Atlanta West Campus (Douglasville) Douglasville, Douglas County Less than 1 mi Being built DC BLOX 2 buildings
Google Douglas County Data Center Lithia Springs, Douglas County Less than 1 mi Running Google 3 buildings
Switch The Keep Campus (Atlanta) Lithia Springs, Douglas County 1 mi Running Switch 4 buildings
Rock House Road Data Center Campus (DRI #4078) Lithia Springs, Douglas County 2 mi Proposed Taylor & Mathis 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Aligned ATL-01

Answered directly from the verified filings and local actions on this page.

Who is building Aligned ATL-01?

Aligned Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Aligned ATL-01 say it needs?

Power: 180 MW (the developer's figure, aligneddc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Aligned ATL-01 stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Aligned Data Centers: Data center locations (opens in a new tab), Aligned Data Centers, September 14, 2026
  2. Aligned Data Centers: Aligned ATL-01 (opens in a new tab), Aligned Data Centers, September 14, 2026
  3. EPA ECHO detailed facility report: Aligned Data Centers ATL01 (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Georgia EPD Air Quality Permit 7374-097-0098-S-01-0 (Aligned Data Centers ATL01) (opens in a new tab), Georgia Environmental Protection Division, February 19, 2024, news outlet

4 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Aligned ATL-01", https://datacenterrecord.org/projects/aligned-atl-01-lithia-springs-ga, last verified September 14, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Aligned ATL-01", https://datacenterrecord.org/projects/aligned-atl-01-lithia-springs-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.725277, -84.617166
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110071667203
Coordinate source
EPA ECHO Detailed Facility Report 110071667203
Location source number
[3]
Location last verified
October 4, 2026
EPA registry id
110071667203
How capacity was disclosed
the developer's figure
Capacity, if disclosed
180 MW, the developer's figure
Published
September 14, 2026
Last verified
September 14, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Aligned ATL-01 · 4 sources, 1 entry · basis and source tier on every row · verified September 14, 2026

Download CSV JSON