Data Center Record.
Census GEOID: 13121 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 9 reporting sources

● Running Reported November 8, 2023 · 4 Buildings

DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)

Street address 760 W Peachtree St NW, Atlanta, GA 30308, Fulton County verified address Exact, at the address databank.com (opens in a new tab)

Overview, regulatory gates and specifications

DataBank lists a data center at Atlanta, Georgia among the sites it operates. [2] Filings on the record specify 4 planned or operational buildings. [2] DataBank lists DataBank Atlanta data center at Atlanta, Georgia on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Georgia EPD Synthetic Minor
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 760 W Peachtree St NW, Atlanta, GA 30308.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
databank.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2021 (5 years)
Who leads it
DataBank as stated by the source
Permitted legal entity
Data Center Atlanta, LLC what a permit allows
State air permit registration
GA EPD AIRS 121-00941, GA EPD Permit 7374-121-0941-S-02-0, EPA FRS 110069993362 state air permit register
State permit status
Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0941 (S 02-0) issued April 19, 2018 the state's permit register, as of April 19, 2018, last verified November 11, 2026
[2] air.gaepd.org
Official project website
databank.com (opens in a new tab) verified October 28, 2026
databank.com (opens in a new tab)
Archived promotional websites
databank.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: DataBank
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

January 12, 2026 Roswell, GA Roswell City Council 180 Day Data Center Moratorium Vote Roswell City Council 3 clips

Roswell Mayor Mary Robichaux and the newly seated Roswell City Council voted on January 12, 2026 to enact a temporary moratorium on new data center applications so the city can update zoning rules governing grid capacity and water use.

  1. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Local impact. Tonight, the city of Roswell approved a moratorium on data centers and it landed his first job or cho explains why the move was made on the very night. The city's newly elected leaders were sworn in. I where that own to share. Roswell, as new mayor takes her oath alongside several of the city's newest council members are place gets you so much to make sure life good. It's bought each year."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Generation. Part of the effort is patients in considering any data center proposal to one of the resources that are needed to run these data centers. We're not saying that we won't ultimately maybe allow one of a man. On monday night, the city unanimously approved a 90 day moratorium to allow time to consider land use standards related to potential projects utility use and potential environmental issues affecting key resources such as the chattahoochee river that runs through the city."
  3. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Are a quarter ahead or a couple of years ahead. Derek would the lone resident to speak on this topic at the meeting. Lives in Roswell and expressed concerns. Noticing the statewide trend. George is one of the state's riding a wave of data center expansion. If everything continues to go, according to plan, can ross will make a lot of money on tax revenues from data center? Absolutely. But could we better use that land to serve people and Roswell for 30 years from now?"
June 23, 2025 South Fulton, GA South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting South Fulton City Council 3 clips

11Alive report on South Fulton City Council and community proceedings in South Fulton, GA: South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting (June 23, 2025).

  1. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "So Glot, what was the purpose of tonight's data center town hall meeting? Well, data center growth is a newer trend for this area and something that the councilwoman hosting tonight's event says the city is really learning about on the fly, so she wanted to give the chance for people who live here to learn more about it too and ask questions about what this could mean for them. The plan for this vacant land along Stax Road is part of a growing trend in the city of South Fulton."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "With the Ryzen data center to questions. My concern is dealing with the impact on our residents as it relates to the utilities. Does that cost , Get passed on to our residents , and concerns. My main concern. That's why City of South Fulton councilwoman Helen Z Willis is hosting a community town hall"
  3. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "with city and state leaders along with representatives from Georgia Power and Atlanta Watershed Management. I hope to ease some of their concerns. there's a lot of misinformation out there, so I hope that they leave you informed and less concerned. The city says it currently has 5 ongoing data center projects, two big concerns from residents the impacts of the data center's power and water usage. One presenter Monday night said a data center can require the same electricity as more than 3000 homes."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Development Authority of Fulton County (DAFC) Proponents Development Authority of Fulton County Board and Applicant Counsel
Venue: Development Authority of Fulton County $45 Million Data Center Tax Break Hearing
"Approving tens of millions of dollars in Development Authority of Fulton County property tax abatements on top of state sales tax exemptions is necessary to attract hyperscale data center expansions to Metro Atlanta."
Column B · Subsequent Recorded Position
Atlanta City Council Ordinance 24 O-1453 (BeltLine and Transit Data Center Ban) and Georgia PSC 2024 IRP Update
Atlanta Ordinance 24 O-1453 · Georgia PSC Docket No. 55378 (Georgia Power 2023-2024 IRP Update)
Agency or Venue: Atlanta City Council and Georgia Public Service Commission
"Following public backlash over $45 million tax breaks for facilities employing few workers while Georgia Power cited data centers for 80 percent of its 6,600 megawatt load surge in PSC Docket No. 55378, the Atlanta City Council voted to ban new data centers along the Atlanta BeltLine and within half a mile of MARTA rail stations."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Acquisition (source date; the content gives no date of its own)

    DataBank acquires nearly 100 acres near Atlanta for new data center campus

    [10] costar.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    DataBank lists DataBank Atlanta data center at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.

    [1] databank.com

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
H5 Data Centers Atlanta Atlanta, Fulton County Less than 1 mi Running H5 Data Centers 1 building
Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5) Atlanta, Fulton County 1 mi Running Equinix 5 buildings
Digital Realty Downtown Atlanta (ATL13 / ATL14) Atlanta, Fulton County 1 mi Running Digital Realty 2 buildings
Selig Drive SW Data Center (Data Center Fulton) Atlanta, Fulton County 2 mi Being built Data Center Fulton, LLC 1 building
QTS Atlanta Metro (ATL1) Atlanta, Fulton County 2 mi Running QTS Data Centers 2 buildings
1611 Ellsworth Data Center and Mixed Use Development (DRI #4506) Atlanta, Fulton County 3 mi Proposed Youngwoo & Associates, LLC 1 building

Blank cell: not disclosed by any source on file.

Common questions about DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)

Answered directly from the verified filings and local actions on this page.

Who is building DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)?

DataBank is the developer. No construction contractor is named on the record yet.

How much power and water does DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. DataBank: Data centers (opens in a new tab), DataBank, September 14, 2026

Reporting

  1. Georgia EPD Air Quality Permit 7374-121-0941-S-02-0 (Data Center Atlanta, LLC) (opens in a new tab), Georgia Environmental Protection Division, April 19, 2018, news outlet
  2. DataBank Announces Groundbreaking of ATL4 Data Center Near Atlanta - telecomtalk.info (opens in a new tab), telecomtalk.info, May 3, 2023, news outlet
  3. DataBank breaks ground on new data center in Atlanta, Georgia - Data Center Dynamics (opens in a new tab), Data Center Dynamics, May 2, 2023, news outlet
  4. DataBank acquires facility and land in Atlanta, plans 40MW data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, May 18, 2022, news outlet
  5. DataBank Raises $533 Million in Debt & Equity to Finance New Data Center Developments - PR Newswire (opens in a new tab), PR Newswire, November 28, 2023, press release
  6. DataBank acquires 100 acres in Atlanta, Georgia, for 120MW data center campus - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 1, 2023, news outlet
  7. DataBank to Develop 120 MW Atlanta Facility - CommercialSearch (opens in a new tab), CommercialSearch, November 6, 2023, news outlet
  8. DataBank Building Atlanta Data Center for Georga Tech Supercomputers - DataCenterKnowledge (opens in a new tab), DataCenterKnowledge, May 30, 2024, news outlet
  9. News | DataBank Acquires Nearly 100 Acres for New Data Center Campus Near Atlanta - CoStar (opens in a new tab), CoStar, November 8, 2023, news outlet

10 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)", https://datacenterrecord.org/projects/databank-atlanta-data-center-ga, last verified September 14, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)", https://datacenterrecord.org/projects/databank-atlanta-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.775499, -84.387735
How the location is known
Location from the site's street address.
Location source
https://www.databank.com/data-centers/atlanta/
Coordinate source
DataBank Atlanta (ATL1 / ATL2 / ATL3 / ATL4) campus specification
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
September 14, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows