● Being Built Announced January 3, 2024 · 1 Building · Data Center Fulton, LLC

Selig Drive SW Data Center (Data Center Fulton)

Street address 200 Selig Dr SW, Atlanta, GA 30336, Fulton County permit coordinates Exact, the point of the EPA's facility record [2] air.gaepd.org

Overview, regulatory gates and specifications

Data Center Fulton, LLC holds Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0973 (S 01 to 0) issued January 3, 2024 for a data center facility at 200 Selig Drive SW in Atlanta, Fulton County. [2] Filings on the record specify 1 planned or operational building. [2] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-121-0973 (S 01-0) issued. [2]

Verified Site & Permit Summary
Verified address
200 Selig Dr SW, Atlanta, GA 30336, Fulton County permit coordinates
Operator / developer
Data Center Fulton, LLC
Permit / registry ID
undefined: undefined [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 2,882 MW (wsbtv.com (opens in a new tab)); 1,803 MW (wsbtv.com (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[2] air.gaepd.org
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Data Center Fulton, LLC as stated by the source
[2] air.gaepd.org
Permitted legal entity
Data Center Fulton, LLC what a permit allows
[2] air.gaepd.org
State air permit registration
GA EPD AIRS 121-00973, GA EPD Permit 7374-121-0973-S-01-0, EPA FRS 110071544594 state air permit register
State permit status
Georgia EPD Air Quality Permit No. 7374-121-0973 (S 01-0) issued the state's permit register, as of January 3, 2024, last verified November 11, 2026
[2] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Data Center Fulton, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Selig Drive SW Data Center (Data Center Fulton).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building GA EPD Air Quality Permit [2] air.gaepd.org
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Fulton County and Atlanta about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Atlanta case by case Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks theatlantavoice.com (opens in a new tab)
Atlanta case by case Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. fox5atlanta.com (opens in a new tab)
Atlanta case by case The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. usatoday.com (opens in a new tab)
Atlanta case by case Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise wsbradio.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    Data Center Fulton, LLC holds Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0973 (S 01 to 0) issued January 3, 2024 for a data center facility at 200 Selig Drive SW in Atlanta, Fulton County.

    [2] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5) Atlanta, Fulton County Less than 1 mi Running Equinix 5 buildings
Digital Realty Downtown Atlanta (ATL13 / ATL14) Atlanta, Fulton County Less than 1 mi Running Digital Realty 2 buildings
H5 Data Centers Atlanta Atlanta, Fulton County 1 mi Running H5 Data Centers 1 building
DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4) Atlanta, Fulton County 2 mi Running DataBank 4 buildings
EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03) Atlanta, Fulton County 3 mi Running EdgeConneX 3 buildings
Centersquare Atlanta (ATL1) Atlanta, Fulton County 3 mi Running Centersquare 1 building

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 1 source
Show each source's words
  • 2,882 MW, wsbtv.com: Another 2,882 megawatts are under construction in Atlanta, the highest amount of data center capacity being built in any U.S. primary market.
  • 1,803 MW, wsbtv.com: Atlanta currently has about 1,803 megawatts of data center capacity.

Common questions about Selig Drive SW Data Center (Data Center Fulton)

Answered directly from the verified filings and local actions on this page.

Who is building Selig Drive SW Data Center (Data Center Fulton)?

Data Center Fulton, LLC is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

Who will use Selig Drive SW Data Center (Data Center Fulton)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Selig Drive SW Data Center (Data Center Fulton) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Selig Drive SW Data Center (Data Center Fulton) stand today?
What has Atlanta or Fulton County decided about it?

Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Selig Drive SW Data Center (Data Center Fulton)?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO Detailed Facility Report (110071544594) (opens in a new tab), U.S. Environmental Protection Agency, January 3, 2024

Reporting

  1. Georgia EPD Air Quality Permit 7374-121-0973-S-01-0 (Selig Drive SW Data Center (Data Center Fulton)) (opens in a new tab), Georgia Environmental Protection Division, January 3, 2024, news outlet

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Selig Drive SW Data Center (Data Center Fulton)", https://datacenterrecord.org/projects/data-center-fulton-selig-drive-atlanta-ga, last verified January 3, 2024. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Selig Drive SW Data Center (Data Center Fulton)", https://datacenterrecord.org/projects/data-center-fulton-selig-drive-atlanta-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.7496, -84.38087
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-28975
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110071544594
Location last verified
November 11, 2026
Rating of the county's rows
Case by case
Published
November 11, 2026
Last verified
January 3, 2024
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Selig Drive SW Data Center (Data Center Fulton) · 2 sources, 1 entry, 4 decisions nearby · basis and source tier on every row · verified January 3, 2024

Download CSV JSON