EdgeConneX Inc. lists EdgeConneX Atlanta (EDCATL01) at 1003 Donnelly Ave SW, Atlanta, GA on its interconnection and facility directory. [1] Filings on the record specify 3 planned or operational buildings. [1] Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1003 Donnelly Ave SW, Atlanta, GA 30310.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 3 buildings | 3 | operator page [1] edgeconnex.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Fulton County and Atlanta about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Atlanta | Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks | theatlantavoice.com (opens in a new tab) | |
| Atlanta | Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. | fox5atlanta.com (opens in a new tab) | |
| Atlanta | The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. | usatoday.com (opens in a new tab) | |
| Atlanta | Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise | wsbradio.com (opens in a new tab) |
Roswell Mayor Mary Robichaux and the newly seated Roswell City Council voted on January 12, 2026 to enact a temporary moratorium on new data center applications so the city can update zoning rules governing grid capacity and water use.
"Local impact. Tonight, the city of Roswell approved a moratorium on data centers and it landed his first job or cho explains why the move was made on the very night. The city's newly elected leaders were sworn in. I where that own to share. Roswell, as new mayor takes her oath alongside several of the city's newest council members are place gets you so much to make sure life good. It's bought each year."
"Generation. Part of the effort is patients in considering any data center proposal to one of the resources that are needed to run these data centers. We're not saying that we won't ultimately maybe allow one of a man. On monday night, the city unanimously approved a 90 day moratorium to allow time to consider land use standards related to potential projects utility use and potential environmental issues affecting key resources such as the chattahoochee river that runs through the city."
"Are a quarter ahead or a couple of years ahead. Derek would the lone resident to speak on this topic at the meeting. Lives in Roswell and expressed concerns. Noticing the statewide trend. George is one of the state's riding a wave of data center expansion. If everything continues to go, according to plan, can ross will make a lot of money on tax revenues from data center? Absolutely. But could we better use that land to serve people and Roswell for 30 years from now?"
Using this data in a report? Support the record.
11Alive report on South Fulton City Council and community proceedings in South Fulton, GA: South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting (June 23, 2025).
"So Glot, what was the purpose of tonight's data center town hall meeting? Well, data center growth is a newer trend for this area and something that the councilwoman hosting tonight's event says the city is really learning about on the fly, so she wanted to give the chance for people who live here to learn more about it too and ask questions about what this could mean for them. The plan for this vacant land along Stax Road is part of a growing trend in the city of South Fulton."
"With the Ryzen data center to questions. My concern is dealing with the impact on our residents as it relates to the utilities. Does that cost , Get passed on to our residents , and concerns. My main concern. That's why City of South Fulton councilwoman Helen Z Willis is hosting a community town hall"
"with city and state leaders along with representatives from Georgia Power and Atlanta Watershed Management. I hope to ease some of their concerns. there's a lot of misinformation out there, so I hope that they leave you informed and less concerned. The city says it currently has 5 ongoing data center projects, two big concerns from residents the impacts of the data center's power and water usage. One presenter Monday night said a data center can require the same electricity as more than 3000 homes."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 26, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Centersquare Atlanta (ATL1) Atlanta, Fulton County | Less than 1 mi | Running | Centersquare | 1 building |
| Digital Realty Downtown Atlanta (ATL13 / ATL14) Atlanta, Fulton County | 3 mi | Running | Digital Realty | 2 buildings |
| Selig Drive SW Data Center (Data Center Fulton) Atlanta, Fulton County | 3 mi | Being built | Data Center Fulton, LLC | 1 building |
| Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5) Atlanta, Fulton County | 3 mi | Running | Equinix | 5 buildings |
| H5 Data Centers Atlanta Atlanta, Fulton County | 3 mi | Running | H5 Data Centers | 1 building |
| QTS Atlanta Metro (ATL1) Atlanta, Fulton County | 3 mi | Running | QTS Data Centers | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
EdgeConneX is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03). Last verified October 26, 2026. https://datacenterrecord.org/projects/edgeconnex-atlanta-edcatl01-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03)
Data Center Record, "EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03)", https://datacenterrecord.org/projects/edgeconnex-atlanta-edcatl01-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.