Data Center Record.
Census GEOID: 13121 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 primary and 1 reporting sources

● Running First recorded September 14, 2026 · 2 Buildings

Digital Realty Downtown Atlanta (ATL13 / ATL14)

Street address 56 Marietta St NW, Atlanta, GA 30303, Fulton County verified address Exact, at the address [2] Digital Realty: Digital Realty ATL13

Overview, regulatory gates and specifications

Digital Realty lists 3 data centers at Atlanta, Georgia among the sites it operates. [1] Filings on the record specify 2 planned or operational buildings. [4] Digital Realty lists Digital Realty ATL13, Digital Realty ATL14, Digital Realty Atlanta at Atlanta, Georgia on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [4]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 56 Marietta St NW, Atlanta, GA 30303.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[4] digitalrealty.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2006 (20 years)
Who leads it
Digital Realty as stated by the source
Official project website
digitalrealty.com (opens in a new tab) verified October 28, 2026
digitalrealty.com (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Digital Realty
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Digital Realty Downtown Atlanta (ATL13 / ATL14).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [4] digitalrealty.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
January 12, 2026 Roswell, GA Roswell City Council 180 Day Data Center Moratorium Vote Roswell City Council 3 clips

Roswell Mayor Mary Robichaux and the newly seated Roswell City Council voted on January 12, 2026 to enact a temporary moratorium on new data center applications so the city can update zoning rules governing grid capacity and water use.

  1. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Local impact. Tonight, the city of Roswell approved a moratorium on data centers and it landed his first job or cho explains why the move was made on the very night. The city's newly elected leaders were sworn in. I where that own to share. Roswell, as new mayor takes her oath alongside several of the city's newest council members are place gets you so much to make sure life good. It's bought each year."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Generation. Part of the effort is patients in considering any data center proposal to one of the resources that are needed to run these data centers. We're not saying that we won't ultimately maybe allow one of a man. On monday night, the city unanimously approved a 90 day moratorium to allow time to consider land use standards related to potential projects utility use and potential environmental issues affecting key resources such as the chattahoochee river that runs through the city."
  3. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Are a quarter ahead or a couple of years ahead. Derek would the lone resident to speak on this topic at the meeting. Lives in Roswell and expressed concerns. Noticing the statewide trend. George is one of the state's riding a wave of data center expansion. If everything continues to go, according to plan, can ross will make a lot of money on tax revenues from data center? Absolutely. But could we better use that land to serve people and Roswell for 30 years from now?"
June 23, 2025 South Fulton, GA South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting South Fulton City Council 3 clips

11Alive report on South Fulton City Council and community proceedings in South Fulton, GA: South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting (June 23, 2025).

  1. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "So Glot, what was the purpose of tonight's data center town hall meeting? Well, data center growth is a newer trend for this area and something that the councilwoman hosting tonight's event says the city is really learning about on the fly, so she wanted to give the chance for people who live here to learn more about it too and ask questions about what this could mean for them. The plan for this vacant land along Stax Road is part of a growing trend in the city of South Fulton."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "With the Ryzen data center to questions. My concern is dealing with the impact on our residents as it relates to the utilities. Does that cost , Get passed on to our residents , and concerns. My main concern. That's why City of South Fulton councilwoman Helen Z Willis is hosting a community town hall"
  3. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "with city and state leaders along with representatives from Georgia Power and Atlanta Watershed Management. I hope to ease some of their concerns. there's a lot of misinformation out there, so I hope that they leave you informed and less concerned. The city says it currently has 5 ongoing data center projects, two big concerns from residents the impacts of the data center's power and water usage. One presenter Monday night said a data center can require the same electricity as more than 3000 homes."
2019 to 2024 hearings
April 25, 2023 Atlanta, GA Fulton County development board to consider $45 million tax break on data center project Development Authority of Fulton County 3 clips

Development Authority of Fulton County public hearing on a $45 million property tax break bond inducement for a hyperscale data center expansion in Atlanta (April 25, 2023).

  1. Atlanta Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "don't want their tax dollars to pay for it Carden Wyckoff 100 people submitted comments for today's Development Authority of Fulton County meeting objecting to a requested 45 million dollar tax break for the building of this quality technology services facility near the Atlanta BeltLine what city Georgia or anywhere in the country or anywhere in the world wouldn't like to"
  2. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "qts representative spoke at today's meeting once completed the project is expected to be 755 000 square feet and create close to 20 jobs but opponents such as Atlanta City council member Matt Westmoreland say those benefits don't warrant the 45 million dollar tax abatement the company is asking for instead he says that money should be spent on bringing in affordable housing or supporting small"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "one of those things or the city of Atlanta isn't the one giving the tax break we don't think it should be happening Howell neighborhood association President Arthur toll presented similar arguments at today's meeting pointing out the economic toll the tax break would have on the community 30318 which is our ZIP code is the seventh highest rate of unemployment in the state of Georgia and This is 40 acres that's going to employ 20 people it's not really much of a benefit it was"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Digital Realty lists Digital Realty ATL13, Digital Realty ATL14, Digital Realty Atlanta at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.

    [2] digitalrealty.com

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5) Atlanta, Fulton County Less than 1 mi Running Equinix 5 buildings
H5 Data Centers Atlanta Atlanta, Fulton County Less than 1 mi Running H5 Data Centers 1 building
Selig Drive SW Data Center (Data Center Fulton) Atlanta, Fulton County Less than 1 mi Being built Data Center Fulton, LLC 1 building
DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4) Atlanta, Fulton County 1 mi Running DataBank 4 buildings
QTS Atlanta Metro (ATL1) Atlanta, Fulton County 2 mi Running QTS Data Centers 2 buildings
EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03) Atlanta, Fulton County 3 mi Running EdgeConneX 3 buildings

Blank cell: not disclosed by any source on file.

Common questions about Digital Realty Downtown Atlanta (ATL13 / ATL14)

Answered directly from the verified filings and local actions on this page.

Who is building Digital Realty Downtown Atlanta (ATL13 / ATL14)?

Digital Realty is the developer. No construction contractor is named on the record yet.

How much power and water does Digital Realty Downtown Atlanta (ATL13 / ATL14) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Digital Realty Downtown Atlanta (ATL13 / ATL14) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Digital Realty: Americas data centers (opens in a new tab), Digital Realty, September 14, 2026
  2. Digital Realty: Digital Realty ATL13 (opens in a new tab), Digital Realty, September 14, 2026
  3. Digital Realty: Digital Realty ATL14 (opens in a new tab), Digital Realty, September 14, 2026
  4. Digital Realty: Digital Realty Atlanta (opens in a new tab), Digital Realty, September 14, 2026

Reporting

  1. Advocates claim proposed Adair Park data center plans mirror historical redlining - Rough Draft Atlanta (opens in a new tab), Rough Draft Atlanta, August 5, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Digital Realty Downtown Atlanta (ATL13 / ATL14)", https://datacenterrecord.org/projects/digital-realty-atlanta-ga, last verified September 14, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Digital Realty Downtown Atlanta (ATL13 / ATL14)", https://datacenterrecord.org/projects/digital-realty-atlanta-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.7568, -84.3917
How the location is known
Location from the site's street address.
Location source
https://www.digitalrealty.com/data-centers/americas/atlanta/atl13
Coordinate source
Digital Realty ATL13 (56 Marietta St NW) and ATL14 (250 Williams St NW) specification
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
September 14, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Digital Realty Downtown Atlanta (ATL13 / ATL14) · 5 sources, 1 entry · basis and source tier on every row · verified September 14, 2026

Download CSV JSON