● Running Announced October 26, 2026 · 1 Building · 365 Data Centers

365 Data Centers Alpharetta (GA1)

Street address 11650 Great Oaks Way, Alpharetta, GA 30022, Fulton County verified address Exact, at the address [1] 365datacenters.com

Overview, regulatory gates and specifications

365 Data Centers lists 365 Data Centers Alpharetta (GA1) at 11650 Great Oaks Way, Alpharetta, GA on its interconnection and facility directory. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 11650 Great Oaks Way, Alpharetta, GA 30022.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] 365datacenters.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2013 (13 years)
Who leads it
365 Data Centers as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: 365 Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for 365 Data Centers Alpharetta (GA1).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] 365datacenters.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Fulton County and Alpharetta about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Atlanta case by case Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks theatlantavoice.com (opens in a new tab)
Atlanta case by case Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. fox5atlanta.com (opens in a new tab)
Atlanta case by case The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. usatoday.com (opens in a new tab)
Atlanta case by case Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise wsbradio.com (opens in a new tab)
January 12, 2026 Roswell, GA Roswell City Council 180 Day Data Center Moratorium Vote Roswell City Council 3 clips

Roswell Mayor Mary Robichaux and the newly seated Roswell City Council voted on January 12, 2026 to enact a temporary moratorium on new data center applications so the city can update zoning rules governing grid capacity and water use.

  1. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Local impact. Tonight, the city of Roswell approved a moratorium on data centers and it landed his first job or cho explains why the move was made on the very night. The city's newly elected leaders were sworn in. I where that own to share. Roswell, as new mayor takes her oath alongside several of the city's newest council members are place gets you so much to make sure life good. It's bought each year."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Generation. Part of the effort is patients in considering any data center proposal to one of the resources that are needed to run these data centers. We're not saying that we won't ultimately maybe allow one of a man. On monday night, the city unanimously approved a 90 day moratorium to allow time to consider land use standards related to potential projects utility use and potential environmental issues affecting key resources such as the chattahoochee river that runs through the city."
  3. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Are a quarter ahead or a couple of years ahead. Derek would the lone resident to speak on this topic at the meeting. Lives in Roswell and expressed concerns. Noticing the statewide trend. George is one of the state's riding a wave of data center expansion. If everything continues to go, according to plan, can ross will make a lot of money on tax revenues from data center? Absolutely. But could we better use that land to serve people and Roswell for 30 years from now?"
June 23, 2025 South Fulton, GA South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting South Fulton City Council 3 clips

11Alive report on South Fulton City Council and community proceedings in South Fulton, GA: South Fulton residents ask questions, share concerns about rise in data centers at town hall meeting (June 23, 2025).

  1. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "So Glot, what was the purpose of tonight's data center town hall meeting? Well, data center growth is a newer trend for this area and something that the councilwoman hosting tonight's event says the city is really learning about on the fly, so she wanted to give the chance for people who live here to learn more about it too and ask questions about what this could mean for them. The plan for this vacant land along Stax Road is part of a growing trend in the city of South Fulton."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "With the Ryzen data center to questions. My concern is dealing with the impact on our residents as it relates to the utilities. Does that cost , Get passed on to our residents , and concerns. My main concern. That's why City of South Fulton councilwoman Helen Z Willis is hosting a community town hall"
  3. 11Alive Broadcast Report Broadcast Report transcribed from local broadcast report
    "with city and state leaders along with representatives from Georgia Power and Atlanta Watershed Management. I hope to ease some of their concerns. there's a lot of misinformation out there, so I hope that they leave you informed and less concerned. The city says it currently has 5 ongoing data center projects, two big concerns from residents the impacts of the data center's power and water usage. One presenter Monday night said a data center can require the same electricity as more than 3000 homes."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Development Authority of Fulton County (DAFC) Proponents Development Authority of Fulton County Board and Applicant Counsel
Venue: Development Authority of Fulton County $45 Million Data Center Tax Break Hearing
"Approving tens of millions of dollars in Development Authority of Fulton County property tax abatements on top of state sales tax exemptions is necessary to attract hyperscale data center expansions to Metro Atlanta."
Column B · Subsequent Recorded Position
Atlanta City Council Ordinance 24 O-1453 (BeltLine and Transit Data Center Ban) and Georgia PSC 2024 IRP Update
Atlanta Ordinance 24 O-1453 · Georgia PSC Docket No. 55378 (Georgia Power 2023-2024 IRP Update)
Agency or Venue: Atlanta City Council and Georgia Public Service Commission
"Following public backlash over $45 million tax breaks for facilities employing few workers while Georgia Power cited data centers for 80 percent of its 6,600 megawatt load surge in PSC Docket No. 55378, the Atlanta City Council voted to ban new data centers along the Atlanta BeltLine and within half a mile of MARTA rail stations."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 26, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.

    [1] 365datacenters.com

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Flexential Alpharetta (ATL4) Alpharetta, Fulton County Less than 1 mi Running Flexential 1 building
Alpharetta North Point Data Center (ATL1 NP) Alpharetta, Fulton County Less than 1 mi Running ATL1 NP Data Center 1 building
Westside Parkway Alpharetta Data Center Alpharetta, Fulton County 1 mi Running Westside Parkway Owner LLC 1 building
ADP Alpharetta Data Center (DC1) Alpharetta, Fulton County 2 mi Running Automatic Data Processing, Inc. 1 building
STACK Infrastructure ATL01 Alpharetta Alpharetta, Fulton County 2 mi Running STACK Infrastructure 1 building
Flexential Atlanta Norcross (ATL1 / ATL2) Norcross, Gwinnett County 9 mi Running Flexential 3.6 MW

Blank cell: not disclosed by any source on file.

Common questions about 365 Data Centers Alpharetta (GA1)

Answered directly from the verified filings and local actions on this page.

Who is building 365 Data Centers Alpharetta (GA1)?

365 Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does 365 Data Centers Alpharetta (GA1) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does 365 Data Centers Alpharetta (GA1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Alpharetta or Fulton County decided about it?

Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. 365 Data Centers: Alpharetta (GA1) Data Center Specification (opens in a new tab), 365 Data Centers, news outlet

1 source on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "365 Data Centers Alpharetta (GA1)", https://datacenterrecord.org/projects/365-data-centers-alpharetta-ga1-ga, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "365 Data Centers Alpharetta (GA1)", https://datacenterrecord.org/projects/365-data-centers-alpharetta-ga1-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
34.06343, -84.272727
How the location is known
Location from the site's street address.
Location source
https://www.365datacenters.com/locations/alpharetta/
Coordinate source
365 Data Centers Alpharetta (GA1) facility specification
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · 365 Data Centers Alpharetta (GA1) · 1 source, 1 entry, 4 decisions nearby · basis and source tier on every row · verified October 26, 2026