Meta Altoona Data Center Campus

Street address 100 Share Way NW, Altoona, IA 50009, Polk County verified address Exact, at the address [1] Meta: Our U.S. data center fleet

Overview, regulatory gates and specifications

Meta operates an 11 building, 5 million square foot hyperscale data center campus at 100 Share Way NW in Altoona, Polk County, Iowa. [1] Filings on the record specify disclosed capacity of 400 MW (the developer's figure). [1] Meta lists Meta Altoona Data Center at Altoona, Iowa on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
400 MW
the developer's figure

Equivalent to ~332,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 19% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
11 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 100 Share Way NW, Altoona, IA 50009.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
400 MW developer figure Equivalent to the continuous electricity demand of about 332,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 4 percent of New York City's summer peak demand in 2024.
[1] datacenters.atmeta.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
11 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Meta Altoona Data Center Campus, capacity: 400 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 400 ÷ 10,245 = 0.04 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Altoona Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 400 MW 400 MW the developer's figure [1] datacenters.atmeta.com
Site Footprint (Acres)
Data Hall Buildings 11 buildings 11 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

May 16, 2022 Altoona, IA Here's why Facebook choose Iowa for new data center Altoona City Council 3 clips

Altoona City Council approval of economic development property tax rebates and municipal water agreements for the Meta Altoona hyperscale data center campus in Polk County (May 16, 2022).

  1. KCCI Broadcast Report Broadcast Report transcribed from local broadcast report
    "Facebook location? 476,000 square feet... this giant building is one of four Facebook data centers, the others are in North Carolina, Oregon, and Sweden... Facebook will employ 75 workers here, most of which are security team members right now ...the building runs on 100 percent renewable energy...and is an incredible testament to green technology...usin g the heat from the endless rows of servers that administer to the over 1 billion Facebook users"
  2. KCCI Broadcast Report Broadcast Report transcribed from local broadcast report
    "billion Facebook users worldwide...and combining that heat with the cold outside to create room temperature... The state offered 18 million in tax credits and Facebook won't have to pay property taxes for 20 years....but officials with Facebook say other sites also offered financial incentives - there are many other reasons they chose Altoona and Iowa. 29:34-"you have to have a site that is obviously quite large, you have to have the ability to have energy supply, that is of the capacity that we need, so"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "you have to have the ability to have energy supply, that is of the capacity that we need, so there are a lot of thing that are mandatory, and then there are a lot of things we want to have and I would say some of those in the case of iowa are the work force, this was a shovel ready site, and we were able to take advantage of renewable energy that is here." This is just the first Facebook"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Altoona Data Center at Altoona, Iowa on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
LightEdge Altoona Data Center 1 (DSM1) Altoona, Polk County Less than 1 mi Running LightEdge Solutions 8 MW
LightEdge Altoona Data Center 2 (DSM2) Altoona, Polk County Less than 1 mi Running LightEdge Solutions 10 MW
Tract Altoona Data Center Park Altoona, Polk County 1 mi Proposed Tract 6 buildings
Cologix Des Moines Carrier Hotel (DSM1) Des Moines, Polk County 9 mi Running Cologix 5 MW
Aureon West Des Moines Data Center West Des Moines, Polk County 13 mi Running Aureon Network Services 4 MW
IP Pathways Urbandale Data Center (DSM1) Urbandale, Polk County 15 mi Running IP Pathways 4 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Altoona Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Meta Altoona Data Center Campus?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Altoona Data Center Campus say it needs?

Power: 400 MW (the developer's figure, datacenters.atmeta.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Meta Altoona Data Center Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026

1 source on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Altoona Data Center Campus", https://datacenterrecord.org/projects/meta-altoona-data-center-ia, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Altoona Data Center Campus", https://datacenterrecord.org/projects/meta-altoona-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.6645, -93.4862
How the location is known
Location from the site's street address.
Location source
https://datacenters.atmeta.com/
Coordinate source
Polk County Air Quality permit and Meta Altoona specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
400 MW, the developer's figure
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Meta Altoona Data Center Campus · 1 source, 1 entry · basis and source tier on every row · verified November 6, 2026