LightEdge Solutions operates the DSM1 commercial colocation data center at 1435 Northridge Circle in Altoona, Polk County, Iowa. [1] Filings on the record specify disclosed capacity of 8 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~6,640 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.4% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1435 Northridge Circle, Altoona, IA 50009.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for LightEdge Altoona Data Center 1 (DSM1).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 8 MW | 8 MW | the developer's figure [1] lightedge.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] lightedge.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Polk County and Altoona about data centers, on the record with their source. A rule about the area is not a decision about this record.
Altoona City Council approval of economic development property tax rebates and municipal water agreements for the Meta Altoona hyperscale data center campus in Polk County (May 16, 2022).
"Facebook location? 476,000 square feet... this giant building is one of four Facebook data centers, the others are in North Carolina, Oregon, and Sweden... Facebook will employ 75 workers here, most of which are security team members right now ...the building runs on 100 percent renewable energy...and is an incredible testament to green technology...usin g the heat from the endless rows of servers that administer to the over 1 billion Facebook users"
"billion Facebook users worldwide...and combining that heat with the cold outside to create room temperature... The state offered 18 million in tax credits and Facebook won't have to pay property taxes for 20 years....but officials with Facebook say other sites also offered financial incentives - there are many other reasons they chose Altoona and Iowa. 29:34-"you have to have a site that is obviously quite large, you have to have the ability to have energy supply, that is of the capacity that we need, so"
"you have to have the ability to have energy supply, that is of the capacity that we need, so there are a lot of thing that are mandatory, and then there are a lot of things we want to have and I would say some of those in the case of iowa are the work force, this was a shovel ready site, and we were able to take advantage of renewable energy that is here." This is just the first Facebook"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
Verified data center records in Iowa within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| LightEdge Altoona Data Center 2 (DSM2) Altoona, Polk County | Less than 1 mi | Running | LightEdge Solutions | 10 MW |
| Meta Altoona Data Center Campus Altoona, Polk County | Less than 1 mi | Running | Meta | 400 MW |
| Tract Altoona Data Center Park Altoona, Polk County | 2 mi | Proposed | Tract | 6 buildings |
| Cologix Des Moines Carrier Hotel (DSM1) Des Moines, Polk County | 9 mi | Running | Cologix | 5 MW |
| Aureon West Des Moines Data Center West Des Moines, Polk County | 13 mi | Running | Aureon Network Services | 4 MW |
| IP Pathways Urbandale Data Center (DSM1) Urbandale, Polk County | 15 mi | Running | IP Pathways | 4 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
LightEdge Solutions is the developer. No construction contractor is named on the record yet.
Power: 8 MW (the developer's figure, lightedge.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
No decision by Altoona or Polk County about data centers is on the record. The Polk County page and the Iowa scorecard list every rated row the day a person publishes one.
1 source on file.
This site is in the MRO West (MROW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. LightEdge Altoona Data Center 1 (DSM1). Last verified October 27, 2026. https://datacenterrecord.org/projects/lightedge-des-moines-1-dsm1-altoona-ia. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about LightEdge Altoona Data Center 1 (DSM1)
Data Center Record, "LightEdge Altoona Data Center 1 (DSM1)", https://datacenterrecord.org/projects/lightedge-des-moines-1-dsm1-altoona-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.