Data Center Record.
Census GEOID: 19153 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 1 Building · LightEdge Solutions

LightEdge Altoona Data Center 2 (DSM2)

Street address 1401 Northridge Circle, Altoona, IA 50009, Polk County verified address Exact, at the address [1] lightedge.com

Overview, regulatory gates and specifications

LightEdge Solutions operates the DSM2 commercial colocation data center at 1401 Northridge Circle in Altoona, Polk County, Iowa. [1] Filings on the record specify disclosed capacity of 10 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
10 MW
the developer's figure

Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1401 Northridge Circle, Altoona, IA 50009.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
10 MW developer figure Equivalent to the continuous electricity demand of about 8,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.098 percent) of New York City's summer peak demand in 2024.
[1] lightedge.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] lightedge.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
LightEdge Solutions as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. LightEdge Altoona Data Center 2 (DSM2), capacity: 10 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 10 ÷ 10,245 = 0.00098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: LightEdge Solutions
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for LightEdge Altoona Data Center 2 (DSM2).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 10 MW 10 MW the developer's figure [1] lightedge.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] lightedge.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] lightedge.com

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
LightEdge Altoona Data Center 1 (DSM1) Altoona, Polk County Less than 1 mi Running LightEdge Solutions 8 MW
Meta Altoona Data Center Campus Altoona, Polk County Less than 1 mi Running Meta 400 MW
Tract Altoona Data Center Park Altoona, Polk County 2 mi Proposed Tract 6 buildings
Cologix Des Moines Carrier Hotel (DSM1) Des Moines, Polk County 9 mi Running Cologix 5 MW
Aureon West Des Moines Data Center West Des Moines, Polk County 13 mi Running Aureon Network Services 4 MW
IP Pathways Urbandale Data Center (DSM1) Urbandale, Polk County 14 mi Running IP Pathways 4 MW

Blank cell: not disclosed by any source on file.

Common questions about LightEdge Altoona Data Center 2 (DSM2)

Answered directly from the verified filings and local actions on this page.

Who is building LightEdge Altoona Data Center 2 (DSM2)?

LightEdge Solutions is the developer. No construction contractor is named on the record yet.

How much power and water does LightEdge Altoona Data Center 2 (DSM2) say it needs?

Power: 10 MW (the developer's figure, lightedge.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does LightEdge Altoona Data Center 2 (DSM2) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Altoona or Polk County decided about it?

No decision by Altoona or Polk County about data centers is on the record. The Polk County page and the Iowa scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. LightEdge Altoona Data Center 2 (DSM2) Official Disclosure (opens in a new tab), LightEdge Solutions, news outlet

1 source on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "LightEdge Altoona Data Center 2 (DSM2)", https://datacenterrecord.org/projects/lightedge-des-moines-2-dsm2-altoona-ia, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "LightEdge Altoona Data Center 2 (DSM2)", https://datacenterrecord.org/projects/lightedge-des-moines-2-dsm2-altoona-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.6578, -93.4902
How the location is known
Location from the site's street address.
Location source
https://www.lightedge.com/data-center-locations/des-moines-data-center/
Coordinate source
LightEdge DSM2 Altoona specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
10 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · LightEdge Altoona Data Center 2 (DSM2) · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON