Reported Built from one source

ValorC3 Boise Data Center

ValorC3 secured a credit facility to fund a 10 MW data center in Boise, Idaho. It is reported, as reported September 10, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
92 acres
third party estimate [2]
Power it would draw
14 MW
not disclosed [3]
Water
Not disclosed
Who leads it
ValorC3
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 14 MW not disclosed [3] godatacenters.com October 6, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it ValorC3 as stated by the source October 6, 2026
Who is constructing it Not disclosed
How much land 92 acres third party estimate [2] idahonews.com October 6, 2026
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: rumored (source date; the content gives no date of its own)

    ValorC3 Boise data center built in 2020 using hybrid cooling [3]

The full ValorC3 Boise Data Center timeline, in order

3 corrections to this record

Every correction, with its reason
  1. · the summary of a record items row

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word The old and new text.

  2. · the site acres of a projects row

    The site read 924 acres. The source said approximately 92 acres (4 million square feet), and the approval ran the two numbers together. Corrected to the 92 acres the source gives. The old and new text.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

Boise Mayor Lauren McLean stated opposition to proposed data center on federal land south of Boise, calling sale of public lands shortsighted and calling for statewide framework protecting natural resources.
Lauren McLean, Boise Mayor · September 23, 2026 · paraphrased · KBOI local outlet

Every statement about data centers in Idaho, by speaker

The site

Where in Boise County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 3 other published records in Idaho
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Boise, Boise County, Idaho
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is ValorC3 Boise Data Center?

The record has 2 measures of its size: 14 MW (not disclosed, source) and 92 acres (third party estimate, source). Each figure names who gave it and links to the source.

Who is building ValorC3 Boise Data Center?

ValorC3 is the developer. No construction contractor is named on the record yet.

How much power and water does ValorC3 Boise Data Center say it needs?

Power: 14 MW (not disclosed, source). Water: not disclosed by any source on file.

Where does ValorC3 Boise Data Center stand today?

It is reported, as reported September 10, 2026. The newest entry, reported September 10, 2026: ValorC3 Boise data center built in 2020 using hybrid cooling [3].

What has Boise or Boise County decided about it?

No decision by Boise or Boise County about data centers is on the record. The Boise County page and the Idaho scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. ValorC3 secures credit facility to fund 10MW data center in Boise, Idaho - Data Center Dynamics, Data Center Dynamics, April 30, 2026, trade press
  2. Boise mayor: "Sell offs of public lands to build mega data centers is shortsighted" - KBOI, KBOI, September 23, 2026, local outlet
  3. ValorC3 Boise Data Center Data Center, Boise, Idaho, godatacenters.com, September 10, 2026, local outlet
  4. ValorC3 Data Centers Announces 10MW Data Center in Boise, Idaho, valorc3.com, May 5, 2025, local outlet

4 sources on file.

Cite this record

Data Center Record, "ValorC3 Boise Data Center", https://datacenterrecord.org/projects/valorc3-boise-data-center-id, last verified October 6, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "ValorC3 Boise Data Center", https://datacenterrecord.org/projects/valorc3-boise-data-center-id. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
valorc3-boise-data-center-id
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/id/boise-county/boise
Coordinates
43.82861, -115.83222
Location precision
county
Location source
County seat (Idaho City), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
third_party_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
14 MW, not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-10-06