Data Center Record.
Census GEOID: 16001 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 reporting sources

● Proposed Campus First recorded September 5, 2026

Kuna Data Centers (two projects)

Location Kuna, Ada County, Idaho county centroid County level, the county seat

Overview, regulatory gates and specifications

Two large data centers are planned for Kuna, Idaho, with questions raised about their water usage. [1]

1. Land & Parcel
Location tracked
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Kuna Data Centers (two projects).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 21, 2026 Kuna, ID First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna Ada County Board of Commissioners 3 clips

KTVB report on Ada County Board of Commissioners and community proceedings in Kuna, ID: First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna (September 21, 2026).

  1. KTVB Broadcast Report Broadcast Report transcribed from local broadcast report
    "And while the Bureau of Land Management will be evaluating the impacts of this project, some Idahoans worry about the environmental cost in the desert a few miles outside of Boise. Across from a bird reserve sits 3700 acres of open space where a Nevada based company wants to build a massive data center, , the first on public land in , Idaho. We're anticipating somewhere in the realm of a 4 million square foot facility."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "BLM also says Raya Data, a subsidiary of Arabia Power, also plans for a natural gas plant to power the data center. We're thinking that would be about 450 megawatts that that has potential to produce, but that's more as a redundancy or a contingency in during. Peak loading or when they need additional power. , Jared , Blades, a BLM field manager, says through its resource management planning process, the BLM identifies open land for energy and infrastructure,"
  3. KTVB Broadcast Report Broadcast Report transcribed from local broadcast report
    "the computing power to be able to do that, Hamilton says. Supporters argue data centers create jobs and support long term technology advancements without having to rely on foreign countries and their infrastructure. We just need to make sure that we go into this with our eyes open. And we make sure that when it's that if it's done, it's done right. The Idaho chapter of the Sierra Club, a national environmental advocacy group, just found out about the project a few days ago. To use"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Idaho

Verified data center records in Idaho within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
ValorC3 Boise Data Center Boise, Ada County ~1 mi Proposed ValorC3
Meta Kuna Data Center Kuna, Ada County ~12 mi Running Meta 2 buildings

Blank cell: not disclosed by any source on file.

Common questions about Kuna Data Centers (two projects)

Answered directly from the verified filings and local actions on this page.

Who is building Kuna Data Centers (two projects)?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Kuna Data Centers (two projects) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Kuna Data Centers (two projects) stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Meta Kuna Idaho Data Center in Final Construction Phase Ahead of Operational Launch (opens in a new tab), constructionreviewonline.com, May 27, 2026, news outlet
  2. You Asked: Two large data centers are coming to Kuna. How much water will they use? - BoiseDev (opens in a new tab), BoiseDev, April 28, 2026, news outlet

2 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Kuna Data Centers (two projects)", https://datacenterrecord.org/projects/kuna-data-centers-two-projects-id, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Kuna Data Centers (two projects)", https://datacenterrecord.org/projects/kuna-data-centers-two-projects-id. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
43.61361, -116.23778
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Boise), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Kuna Data Centers (two projects) · 2 sources, 0 entries · basis and source tier on every row · verified September 17, 2026