Meta's Kuna data center, built for AI workloads, is now operational in Idaho. [4] Filings on the record specify 2 planned or operational buildings. [1] Groundbreaking was in 2022 [4]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 2050 E Kuna Mora Rd, Kuna, ID 83634.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Lisa Grow says the pace and scale of Idaho's growth is unprecedented and Idaho Power must adapt and innovate to keep up with growth statewide and manage resources to keep costs down.(September 25, 2026) idahobusinessreview.com (opens in a new tab)
Meta aims to be net water positive by 2030(September 19, 2026) [4]
Scott Stillings, critical operations manager, said the same water used to cool the facility today will be used for the next 10 years(September 4, 2026) [9]
Brad Davis, Meta Director of Global Economic Development, said the closed loop cooling system runs without extra cooling water for much of the year and needs refill every 7 to 10 years(September 4, 2026) [9]
View all 8 statements on the record in Idaho →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Kuna Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | 2 | Site filing [1] datacenters.atmeta.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
KTVB report on Ada County Board of Commissioners and community proceedings in Kuna, ID: First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna (September 21, 2026).
"And while the Bureau of Land Management will be evaluating the impacts of this project, some Idahoans worry about the environmental cost in the desert a few miles outside of Boise. Across from a bird reserve sits 3700 acres of open space where a Nevada based company wants to build a massive data center, , the first on public land in , Idaho. We're anticipating somewhere in the realm of a 4 million square foot facility."
"BLM also says Raya Data, a subsidiary of Arabia Power, also plans for a natural gas plant to power the data center. We're thinking that would be about 450 megawatts that that has potential to produce, but that's more as a redundancy or a contingency in during. Peak loading or when they need additional power. , Jared , Blades, a BLM field manager, says through its resource management planning process, the BLM identifies open land for energy and infrastructure,"
"the computing power to be able to do that, Hamilton says. Supporters argue data centers create jobs and support long term technology advancements without having to rely on foreign countries and their infrastructure. We just need to make sure that we go into this with our eyes open. And we make sure that when it's that if it's done, it's done right. The Idaho chapter of the Sierra Club, a national environmental advocacy group, just found out about the project a few days ago. To use"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Groundbreaking was in 2022
(source date; the content gives no date of its own)
Meta's Kuna data center grand opening held September 3, 2026
(source date; the content gives no date of its own)
Meta's data center in Kuna, Idaho held grand opening event with community members, stakeholders, and policy experts
(source date; the content gives no date of its own)
Meta's data center in Kuna, Idaho held grand opening on September 3, 2026.
(source date; the content gives no date of its own)
Data center broke ground in 2022
(source date; the content gives no date of its own)
Meta Kuna Data Center is online and fully operational
(source date; the content gives no date of its own)
Meta formally turned on Kuna data center with closed loop cooling system
(source date; the content gives no date of its own)
This is Meta's first data center in Idaho
(source date; the content gives no date of its own)
This is Meta's 28th American data center
(source date; the content gives no date of its own)
The largest building on the Kuna campus is 350,000 square feet
(source date; the content gives no date of its own)
Meta paid $100 million to build transmission infrastructure for the data center
(source date; the content gives no date of its own)
Meta backed three solar projects expected to add 645 megawatts to offset the data center's power consumption
(source date; the content gives no date of its own)
The Kuna data center uses a closed loop cooling system that requires about 200,000 gallons of water
(source date; the content gives no date of its own)
The Kuna data center is 750,000 square feet
(source date; the content gives no date of its own)
The Kuna data center cost $1.2 billion
· running (source date; the content gives no date of its own)
Meta's Kuna data center formally opened on September 4, 2026
(source date; the content gives no date of its own)
Meta is building a data center in Idaho for $800 million
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: kezj.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: kezj.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives govtech.com. The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Idaho within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| ValorC3 Boise Data Center Boise, Ada County | ~11 mi | Proposed | ValorC3 | |
| Kuna Data Centers (two projects) Kuna, Ada County | ~12 mi | Proposed |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running, as reported February 17, 2022. The newest entry, reported September 19, 2026: Groundbreaking was in 2022 [4].
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
11 sources on file.
This site is in the Northwest Power Pool (NWPP) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Meta Kuna Data Center. Last verified November 6, 2026. https://datacenterrecord.org/projects/meta-kuna-data-center-id. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Meta Kuna Data Center