Census GEOID: 16001 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 9 reporting sources

● Running Reported February 17, 2022 · 2 Buildings

Meta Kuna Data Center

Street address 2050 E Kuna Mora Rd, Kuna, ID 83634, Ada County verified address Exact, at the address [2] County seat (Boise), Wikidata, placed at county level

Overview, regulatory gates and specifications

Meta's Kuna data center, built for AI workloads, is now operational in Idaho. [4] Filings on the record specify 2 planned or operational buildings. [1] Groundbreaking was in 2022 [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
Disclosed building count

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2050 E Kuna Mora Rd, Kuna, ID 83634.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 645 MW (GovTech (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2022 (4 years)
Who leads it
Meta as stated by the source
[1] datacenters.atmeta.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Lisa Grow

Idaho Power President and CEO

DID Recorded statement at Idaho Business Review (September 25, 2026)
SAID Lisa Grow says the pace and scale of Idaho's growth is unprecedented and Idaho Power must adapt and innovate to keep up with growth statewide and manage resources to keep costs down. (September 25, 2026) idahobusinessreview.com (opens in a new tab)

Meta

Public Record Speaker

DID Recorded statement at Idaho Press (September 19, 2026) [4]
SAID Meta aims to be net water positive by 2030 (September 19, 2026) [4]

Scott Stillings

critical operations manager

DID Recorded statement at Coeur d'Alene Press (September 4, 2026) [9]
SAID Scott Stillings, critical operations manager, said the same water used to cool the facility today will be used for the next 10 years (September 4, 2026) [9]

Brad Davis

Meta Director of Global Economic Development

DID Recorded statement at Coeur d'Alene Press (September 4, 2026) [9]
SAID Brad Davis, Meta Director of Global Economic Development, said the closed loop cooling system runs without extra cooling water for much of the year and needs refill every 7 to 10 years (September 4, 2026) [9]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

View all 8 statements on the record in Idaho →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Kuna Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 Site filing [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 21, 2026 Kuna, ID First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna Ada County Board of Commissioners 3 clips

KTVB report on Ada County Board of Commissioners and community proceedings in Kuna, ID: First data center in Idaho proposed on public lands. It would be four times larger than Meta's Kuna (September 21, 2026).

  1. KTVB Broadcast Report Broadcast Report transcribed from local broadcast report
    "And while the Bureau of Land Management will be evaluating the impacts of this project, some Idahoans worry about the environmental cost in the desert a few miles outside of Boise. Across from a bird reserve sits 3700 acres of open space where a Nevada based company wants to build a massive data center, , the first on public land in , Idaho. We're anticipating somewhere in the realm of a 4 million square foot facility."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "BLM also says Raya Data, a subsidiary of Arabia Power, also plans for a natural gas plant to power the data center. We're thinking that would be about 450 megawatts that that has potential to produce, but that's more as a redundancy or a contingency in during. Peak loading or when they need additional power. , Jared , Blades, a BLM field manager, says through its resource management planning process, the BLM identifies open land for energy and infrastructure,"
  3. KTVB Broadcast Report Broadcast Report transcribed from local broadcast report
    "the computing power to be able to do that, Hamilton says. Supporters argue data centers create jobs and support long term technology advancements without having to rely on foreign countries and their infrastructure. We just need to make sure that we go into this with our eyes open. And we make sure that when it's that if it's done, it's done right. The Idaho chapter of the Sierra Club, a national environmental advocacy group, just found out about the project a few days ago. To use"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Groundbreaking was in 2022

    [4] idahopress.com

  2. (source date; the content gives no date of its own)

    Meta's Kuna data center grand opening held September 3, 2026

    [4] idahopress.com

  3. (source date; the content gives no date of its own)

    Meta's data center in Kuna, Idaho held grand opening event with community members, stakeholders, and policy experts

    [5] blackchronicle.com

  4. (source date; the content gives no date of its own)

    Meta's data center in Kuna, Idaho held grand opening on September 3, 2026.

    [6] bigcountrynewsconnection.com

  5. (source date; the content gives no date of its own)

    Data center broke ground in 2022

    [7] kezj.com

  6. (source date; the content gives no date of its own)

    Meta Kuna Data Center is online and fully operational

    [7] kezj.com

  7. (source date; the content gives no date of its own)

    Meta formally turned on Kuna data center with closed loop cooling system

    [8] govtech.com

  8. (source date; the content gives no date of its own)

    This is Meta's first data center in Idaho

    [9] cdapress.com

9 earlier entries
  1. (source date; the content gives no date of its own)

    This is Meta's 28th American data center

    [9] cdapress.com

  2. (source date; the content gives no date of its own)

    The largest building on the Kuna campus is 350,000 square feet

    [9] cdapress.com

  3. (source date; the content gives no date of its own)

    Meta paid $100 million to build transmission infrastructure for the data center

    [9] cdapress.com

  4. (source date; the content gives no date of its own)

    Meta backed three solar projects expected to add 645 megawatts to offset the data center's power consumption

    [9] cdapress.com

  5. (source date; the content gives no date of its own)

    The Kuna data center uses a closed loop cooling system that requires about 200,000 gallons of water

    [9] cdapress.com

  6. (source date; the content gives no date of its own)

    The Kuna data center is 750,000 square feet

    [9] cdapress.com

  7. (source date; the content gives no date of its own)

    The Kuna data center cost $1.2 billion

    [9] cdapress.com

  8. · running (source date; the content gives no date of its own)

    Meta's Kuna data center formally opened on September 4, 2026

    [9] cdapress.com

  9. (source date; the content gives no date of its own)

    Meta is building a data center in Idaho for $800 million

    [3] datacenterfrontier.com

Every event in order

17 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: kezj.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: kezj.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  14. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cdapress.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  15. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives govtech.com. The link did not change.

See all 17 corrections for this record (2 more) →

Every correction on the record is on the corrections page.

Nearest data centers in Idaho

Verified data center records in Idaho within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
ValorC3 Boise Data Center Boise, Ada County ~11 mi Proposed ValorC3
Kuna Data Centers (two projects) Kuna, Ada County ~12 mi Proposed

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
645 MW Reported

GovTech, Sep 4, 2026

Show each source's words
  • 645 MW, GovTech: Meta backing three solar projects expected to add 645 megawatts to grid to offset data center power consumption

Common questions about Meta Kuna Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Kuna Data Center?

Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Meta Kuna Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Meta Kuna Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Kuna Data Center stand today?

It is running, as reported February 17, 2022. The newest entry, reported September 19, 2026: Groundbreaking was in 2022 [4].

What is still unknown about Meta Kuna Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. US EPA ECHO and Idaho Department of Environmental Quality Permit & Parcel Record (2050 E Kuna Mora Rd, Kuna, ID 83634) (opens in a new tab), U.S. Environmental Protection Agency and Idaho Department of Environmental Quality, November 6, 2026

Reporting

  1. Meta Is Building a Giant $800 Million Data Center in Idaho - datacenterfrontier.com (opens in a new tab), datacenterfrontier.com, February 17, 2022, trade press
  2. Guest commentary: Idaho town sees major tech investment with new data center - Idaho Press (opens in a new tab), Idaho Press, September 19, 2026, local outlet
  3. Op Ed: Idaho town sees major tech investment with new data center - The Black Chronicle (opens in a new tab), The Black Chronicle, September 18, 2026, local outlet
  4. Op Ed: Idaho town sees major tech investment with new data center - The Center Square (opens in a new tab), The Center Square, September 18, 2026, news outlet
  5. ‘We Are Online': Meta Announces The Kuna Data Center Is Now Operating - 95.7 KEZJ (opens in a new tab), 95.7 KEZJ, September 8, 2026, local outlet
  6. Meta Turns on $1.2B Data Center, Promising Water Efficiency - GovTech (opens in a new tab), GovTech, September 4, 2026, national outlet
  7. Meta turns on its $1.2B Idaho data center with promise of water efficiency - Coeur d'Alene Press (opens in a new tab), Coeur d'Alene Press, September 4, 2026, news outlet
  8. ‘We Are Online': Meta Announces The Kuna Data Center Is Now Operating - 1035kissfmboise.com (opens in a new tab), 1035kissfmboise.com, September 4, 2026, news outlet
  9. Inside Meta’s new Kuna data center built for AI - Idaho News 6 (opens in a new tab), Idaho News 6, September 3, 2026, local outlet

11 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Kuna Data Center", https://datacenterrecord.org/projects/meta-kuna-data-center-id, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Kuna Data Center", https://datacenterrecord.org/projects/meta-kuna-data-center-id. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
43.4755, -116.3685
How the location is known
Location from the site's street address.
Location source
County seat (Boise), Wikidata, placed at county level
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Kuna Data Center · 11 sources, 17 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON