ValorC3 Boise Data Center, in order

What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.

1 event, September 10, 2026 to September 10, 2026. Also on the record, under the month each belongs to: 1 statement. The facts, newest first: the record; the place: Idaho.

A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.

Stages

  1. reported

Now: reported. A stage is the record's status after the entry that set it (the definitions).

2026 1 event

  1. (source date; the content gives no date of its own)

    reported

    ValorC3 Boise data center built in 2020 using hybrid cooling [3]

  2. Also in September 2026: 1 statement
    1. (said in the source itself)

      Statement · Lauren McLean, Boise Mayor

      Boise Mayor Lauren McLean stated opposition to proposed data center on federal land south of Boise, calling sale of public lands shortsighted and calling for statewide framework protecting natural resources. KBOI local outlet

On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.

For researchers
Slug
valorc3-boise-data-center-id
Status value
rumored
Events on the timeline
1
Under the months
1
Stage changes
1
Decisions
0
Statements
1
Figures
0
Entries and decisions under the months
0