Google is constructing a hyperscale data center campus along Interstate 70 in New Florence, Montgomery County, Missouri. [10] Filings on the record specify 3 planned or operational buildings. [1] Google lists Google New Florence data center at New Florence, Missouri on its own page of data center locations, read September 14, 2026. [1]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Katie Ottenweller, Google energy market development, stated Google will pay for 100% of power costs to serve data center operations(September 16, 2026) kbia.org (opens in a new tab)
Geoff Marke, Missouri Office of Public Counsel chief economist, stated public counsel recommends community support be required for AI data center companies(September 16, 2026) kbia.org (opens in a new tab)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google New Florence Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 3 buildings | agency filing [1] datacenters.google | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: being built (source date; the content gives no date of its own)
Google announced 15 billion USD investment in May 2026 for hyperscale data center campus in New Florence, Missouri including 500 MW additional power capacity.
(content date)
Google committed $15 billion to a new AI hyperscale campus in Missouri, as noted in a 2026 North America Data Center Construction Market Report.
(content date)
Montgomery County Commission unanimously approved tax incentive package for Google data center
· Status: approved (content date)
Google announced $15 billion investment in data center in New Florence, Montgomery County, Missouri
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Google lists Google New Florence data center at New Florence, Missouri on its own page of data center locations, read September 14, 2026.
Held unplaced under the record's rules (October 13, 2026): the entry's words are about Alberta, and this record is in Missouri. Kept off the record, never deleted; it can be restored.
The same project on two records: the $15 billion Google data center at New Florence, Montgomery County, Missouri (history entry 583 of the retired record says so). Merged into the New Florence record on the editor's word, September 23, 2026; its sources and history moved with it, its name is kept as an alias, and its address redirects. merged google-missouri-ai-hyperscale-campus-mo into google-new-florence-data-center-mo: 3 sources moved, 0 duplicate sources dropped, "Google Missouri AI Hyperscale Campus" kept as an alias
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: komu.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: komu.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Missouri within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Montgomery County Data Center Proposal New Florence, Montgomery County | Less than 1 mi | Proposed | Amazon Web Services | 4 buildings |
| TierPoint St. Louis Millpark Data Center (Maryland Heights) Maryland Heights, St. Louis County | 58 mi | Running | TierPoint | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Google is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, as reported August 28, 2026. The newest entry, reported August 28, 2026: Google announced 15 billion USD investment in May 2026 for hyperscale data center campus in New Florence, Missouri including 500 MW additional power capacity. [12]
Official operator or facility campus page verified in 50 state website discovery pass.
12 sources on file.
This site is in the SERC Midwest (SRMW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Google New Florence Data Center. Last verified October 27, 2026. https://datacenterrecord.org/projects/google-new-florence-data-center-mo. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Google New Florence Data Center