● Proposed Campus Reported June 23, 2026 · 4 Buildings

Amazon Montgomery County Data Center Proposal

Street address Interstate 70 Corridor, New Florence, MO 63363, Montgomery County verified address Exact, at the address [1] finance.yahoo.com

Overview, regulatory gates and specifications

Amazon Web Services filed Chapter 100 industrial development proposals for a 4 building data center campus in Montgomery County, Missouri. [3] Amazon data center in Montgomery County broke ground in June [3]

Verified Site & Permit Summary
Verified address
Interstate 70 Corridor, New Florence, MO 63363, Montgomery County verified address
Operator / developer
Amazon Web Services
Permit / registry ID
ABC17NEWS on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] finance.yahoo.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Amazon Web Services as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Joe Nicola

State Sen. (R-Grain Valley)

DID Recorded statement at ABC17NEWS (September 17, 2026) [3]
SAID State Sen. Joe Nicola plans to file legislation for the upcoming session regulating AI and data centers (September 17, 2026) [3]

Colin Wellenkamp

State Rep. (R-St. Charles)

DID Recorded statement at ABC17NEWS (September 17, 2026) [3]
SAID State Rep. Colin Wellenkamp announced plans to lead legislation regulating AI data centers and placing guardrails on companies (September 17, 2026) [3]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services · Parent: Amazon
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Montgomery County Data Center Proposal.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings agency filing [1] finance.yahoo.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Amazon data center in Montgomery County broke ground in June

    [3] abc17news.com

  2. · Status: proposed (source date; the content gives no date of its own)

    Amazon held a question and answer session about a data center campus in Montgomery County

    [4] komu.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Site acreage

    The site read 800,000 acres. The source's figure was 800,000 square feet, a floor area, and the approval wrote it as acres. Returned to not disclosed, as it was before.

Every correction on the record is on the corrections page.

Nearest data centers in Missouri

Verified data center records in Missouri within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google New Florence Data Center New Florence, Montgomery County Less than 1 mi Being built Google 3 buildings
TierPoint St. Louis Millpark Data Center (Maryland Heights) Maryland Heights, St. Louis County 57 mi Running TierPoint 6 MW

Blank cell: not disclosed by any source on file.

Common questions about Amazon Montgomery County Data Center Proposal

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Montgomery County Data Center Proposal?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

How much power and water does Amazon Montgomery County Data Center Proposal say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Montgomery County Data Center Proposal stand today?

It is proposed, as reported June 23, 2026. The newest entry, reported September 17, 2026: Amazon data center in Montgomery County broke ground in June [3].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Amazon Unveils Multibillion-Dollar Missouri Data Center Investment - Yahoo Finance (opens in a new tab), Yahoo Finance, June 16, 2026, national outlet
  2. Amazon to Invest $10 Billion in Montgomery County Data Center Campus - The Missouri Times - (opens in a new tab), The Missouri Times -, June 16, 2026, local outlet
  3. Hundreds of Missourians rally for pause of data center development, man arrested - ABC17NEWS (opens in a new tab), ABC17NEWS, September 17, 2026, local outlet
  4. Amazon holds Q&A in Montgomery County about incoming data center - KOMU 8 (opens in a new tab), KOMU 8, June 23, 2026, local outlet
  5. Amazon Selects Missouri for $10 Billion Data Center Campus - PR Newswire (opens in a new tab), PR Newswire, June 15, 2026, press release

5 sources on file.

Regional grid context

This site is in the SERC Midwest (SRMW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Montgomery County Data Center Proposal", https://datacenterrecord.org/projects/amazon-montgomery-county-data-center-mo, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Montgomery County Data Center Proposal", https://datacenterrecord.org/projects/amazon-montgomery-county-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
38.9125, -91.4385
How the location is known
Location from the site's street address.
Location source
https://ded.mo.gov/
Coordinate source
Montgomery County Chapter 100 filing
Location last verified
September 16, 2026
Published
September 8, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Montgomery County Data Center Proposal · 5 sources, 2 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON