Data Center Record.
Census GEOID: 06001 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Running First recorded October 3, 2026 · 1 Building

Amazon Web Services Hayward Data Center (SFO11)

Street address 26415 Corporate Avenue, Hayward, CA 94545, Alameda County verified address Exact, at the address [1] EPA ECHO detailed facility report: Amazon Data Services, INC, SFO11

Overview, regulatory gates and specifications

Amazon Web Services operates its SFO11 Northern California cloud region data center at 26415 Corporate Avenue in Hayward, Alameda County, California, with 24 MW of BAAQMD permitted backup generator and critical power capacity. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
24 MW
the developer's figure

Equivalent to ~19,920 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
permit filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 26415 Corporate Avenue, Hayward, CA 94545.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
24 MW developer figure Equivalent to the continuous electricity demand of about 19,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[1] echo.epa.gov
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[1] echo.epa.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Amazon Web Services as stated by the source
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amazon Web Services Hayward Data Center (SFO11), capacity: 24 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 24 ÷ 10,245 = 0.0023 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services · Parent: Amazon
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Web Services Hayward Data Center (SFO11).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 24 MW 24 MW the developer's figure [1] echo.epa.gov
Site Footprint (Acres)
Data Hall Buildings 1 building 1 permit filing [1] echo.epa.gov
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

October 6, 2026 Oakland, CA Oakland City Council 45 Day Data Center Moratorium Vote Oakland City Council 3 clips

On October 6, 2026, the Oakland City Council approved an urgency 45 day moratorium freezing new data center construction permits while staff drafts environmental, grid load, and backup emission rules.

  1. KTVU FOX 2 San Francisco Broadcast Report Broadcast Report transcribed from local broadcast report
    "city tonight to impose a temporary freeze on new data center construction. Good evening, everyone. I'm Mike Mibach. And I'm Claudine Wong. And [snorts] it is not just Oakland. Leaders in San Francisco and Los Angeles also stepping back tonight to evaluate the footprint of developing these facilities in their communities. And we begin in Oakland with KTVU's Zach Sos after attending tonight's vote. Zach. And tonight we heard from residents both"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "for and against the moratorium. Those against the moratorium talking about the economic benefits that would come with data centers. Those for the moratorium talking about the environmental impacts that could come as well. We demand people's moratorium on data centers in the city of Oakland. Protesters rallying outside Oakland City Hall Tuesday as the council considered whether or not to implement a 45 day"
  3. KTVU FOX 2 San Francisco Broadcast Report Broadcast Report transcribed from local broadcast report
    "land and energy use, as well as impacts on water and air quality, at the heart of the debate. Well, my concern about it being in Oakland is that we have limited water from the Mokelumne River in the Sierra Nevada. If we We're already taking up to 60 to 70% of that river out of the river for human use. If we increase water use here, that will take more and"
September 15, 2026 Hayward, CA Hayward City Council Regular Meeting Hayward City Council 2 clips

Hayward Mayor Mark Salinas and Council Members Syrop and Andrews introduced Item 21, a City Council Referral directing municipal staff to return with ordinance options prohibiting or strictly limiting data center development in Hayward.

  1. Mark Salinas, Mayor, City of Hayward Elected Official transcribed from the official recording
    "certainly a draw. So thank you for that. if there are no other oral reports, I will then move on to, council referrals, which is item number 21, city council referral, prohibition data center development referral from Mayor Selenas, Council Member Cyrup, and Council Member"
  2. Hayward Development Services Staff Board & Planning Staff transcribed from the official recording
    "happy to see you all here. I'm going to provide a brief presentation related to the city council referral outlining actions to limit or further regulate data centers data center development in Hayward. So on August 12th, citing significant community outcry related to the approval of the stack data center and then concerns about health and environmental risks related to"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] echo.epa.gov

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Digital Realty Fremont Data Center (SJC22) Fremont, Alameda County 6 mi Running Digital Realty 12 MW
T5 Data Centers Silicon Valley Newark Facility Newark, Alameda County 10 mi Running T5 Data Centers 14 MW
Equinix SV8 Palo Alto Internet Exchange Data Center Palo Alto, Santa Clara County 13 mi Running Equinix 4 MW
Hurricane Electric Fremont Carrier Hotel Campus (FMT1 and FMT2) Fremont, Alameda County 14 mi Running Hurricane Electric 24 MW
Digital Realty Oakland Data Center Campus (OAK10) Oakland, Alameda County 15 mi Running Digital Realty 12 MW
Equinix SV4 Sunnyvale Data Center Sunnyvale, Santa Clara County 16 mi Running Equinix 10 MW

Blank cell: not disclosed by any source on file.

Common questions about Amazon Web Services Hayward Data Center (SFO11)

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Web Services Hayward Data Center (SFO11)?

Amazon Web Services is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Hayward Data Center (SFO11) say it needs?

Power: 24 MW (the developer's figure, echo.epa.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amazon Web Services Hayward Data Center (SFO11) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Amazon Data Services, INC, SFO11 (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Hayward Data Center (SFO11)", https://datacenterrecord.org/projects/amazon-data-services-inc-sfo11-hayward-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Hayward Data Center (SFO11)", https://datacenterrecord.org/projects/amazon-data-services-inc-sfo11-hayward-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
37.6245, -122.1185
How the location is known
Location from the site's street address.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110070158222
Coordinate source
EPA FRS 110070158222 / BAAQMD Generator Permit
Location source number
[1]
Location last verified
October 3, 2026
EPA registry id
110070158222
How capacity was disclosed
the developer's figure
Capacity, if disclosed
24 MW, the developer's figure
Published
October 3, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Amazon Web Services Hayward Data Center (SFO11) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON