Equinix SV8

Equinix lists a data center at Palo Alto, California among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 2 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Equinix
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Equinix as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Santa Clara County and Palo Alto about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
San Jose Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce mk.co.kr
Santa Clara County Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis mk.co.kr
Gilroy The moratorium could potentially be extended for up to two years. mercurynews.com
Gilroy Gilroy City Council approved a temporary moratorium on new data center applications effective immediately for at least 45 days. mercurynews.com
Morgan Hill Morgan Hill City Council adopted a temporary moratorium on data centers and battery storage facilities while staff develops possibly permanent guidelines gilroydispatch.com
Gilroy The moratorium would not affect the Amazon data center already approved and under construction on Camino Arroyo gilroydispatch.com
5 earlier decisions on the county's rows
DateWhoDecisionSource
Gilroy Approved interim urgency ordinances remain in place for 45 days unless renewed by the council, then can be renewed for an additional 10 months and 15 days, and again for another 12 months if needed gilroydispatch.com
Gilroy The moratorium would allow the city to review and update design and development standards that would apply to data centers and other industrial developments gilroydispatch.com
Gilroy Gilroy City Council will consider adopting a temporary moratorium on new data centers at its Sept. 14 meeting gilroydispatch.com
San Jose San Jose residents push for data center moratorium sanjosespotlight.com
San Jose San Jose is considering data center development amid resident environmental concerns kqed.org

What happened

  1. · Status: running (the day the page was read; it gives no date of its own)

    Equinix lists Equinix SV8 at Palo Alto, California on its own page of data center locations, read September 14, 2026. [2]

The full Equinix SV8 timeline, in order

The site

Where in Palo Alto is not in the public record. The pin marks the center of Palo Alto, not a building, and the outline is Santa Clara County.

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 29 other published records in California
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Palo Alto, Santa Clara County, California
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Equinix SV8?

Equinix is the developer. No construction contractor is named on the record yet.

How much power and water does Equinix SV8 say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Equinix SV8 stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: Equinix lists Equinix SV8 at Palo Alto, California on its own page of data center locations, read September 14, 2026. [2]

What has Palo Alto or Santa Clara County decided about it?

San Jose: Santa Clara City is pushing for a plan to require large customers such as data centers to reduce power use when power is scarce (reported September 17, 2026, source); and Santa Clara County: Santa Clara County Sustainability Committee discussed moratorium suspending permits for new data centers for a certain period, strengthening disclosure of resource use, and gap analysis (reported September 17, 2026, source). 11 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Equinix: United States and Canada colocation data centers, Equinix, September 14, 2026
  2. Equinix: Equinix SV8, Equinix, September 14, 2026

2 sources on file.

Cite this record

Data Center Record, "Equinix SV8", https://datacenterrecord.org/projects/equinix-sv8-palo-alto-ca, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Equinix SV8", https://datacenterrecord.org/projects/equinix-sv8-palo-alto-ca. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
equinix-sv8-palo-alto-ca
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/ca/santa-clara-county/palo-alto
Coordinates
37.3952288, -122.1429189
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-09-17