Data Center Record.
Census GEOID: 47157 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 10 reporting sources

● Running Recorded July 31, 2026 · 2 Buildings In court filed September 18, 2026

xAI Colossus Memphis Supercluster Data Center Campus

Street address 3231 Paul R. Lowry Road and 5420 Tulane Road, Memphis, TN 38109, Shelby County verified address Exact, at the address [2] wsmv.com

Overview, regulatory gates and specifications

xAI operates its 500 MW Colossus AI supercomputer data center campus at 3231 Paul R. Lowry Road and 5420 Tulane Road in Memphis, Shelby County, Tennessee. [2] Filings on the record specify 2 planned or operational buildings. [2] Operations at Colossus II came online in January 2026. [6]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
500 MW
the developer's figure

Equivalent to ~415,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 24% of Hoover Dam nameplate capacity (2,080 MW).

Electric utility: gas turbines.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
2 buildings
permit filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 3231 Paul R. Lowry Road and 5420 Tulane Road, Memphis, TN 38109.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
500 MW developer figure Equivalent to the continuous electricity demand of about 415,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 5 percent of New York City's summer peak demand in 2024.
[2] wsmv.com
Water usage
Not disclosed Reported by others: 1 million gal/day (multiple outlets (opens in a new tab)). Their figure, not the record's.
Land area
Not disclosed
Buildings
2 buildings permitted
[2] wsmv.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
xAI as stated by the source
Where its power comes from
gas turbines as stated by the source
[6] independent.co.uk
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. xAI Colossus Memphis Supercluster Data Center Campus, capacity: 500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 500 ÷ 10,245 = 0.05 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Keshaun Pearson

co-founder of Memphis Community Against Pollution

DID Recorded statement at WSMV (September 11, 2026) [2]
SAID Memphis community reports cancer rate 4.1 times the national average near xAI data center (September 11, 2026) [2]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: xAI
UTILITIES
Electric utility: gas turbines

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for xAI Colossus Memphis Supercluster Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 500 MW 500 MW the developer's figure [2] wsmv.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 permit filing [2] wsmv.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

October 8, 2026 Memphis, TN Memphis City Council Planning and Zoning Committee Data Center Legislation Hearing Memphis City Council 3 clips

The Memphis City Council Planning and Zoning Committee met on October 8, 2026 to debate municipal data center zoning legislation, setbacks, and utility oversight following the rapid expansion of xAI's Colossus supercomputer campus and natural gas turbines in Southwest Memphis.

  1. Memphis City Council Planning and Zoning Chair Elected Official transcribed from the official recording
    "any discussion over data center legislation. I'm going to read the focus item for this meeting, but just to clarify, the Memphis City Council session from Tuesday is still in recess and due some things that we were brought up regarding the legislation. Here we are. So the focus item, this is all available to the public. We can provide you copies, but the intent of the meeting today and we're planning to go until 4:00 I believe, right? 4:00."
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "the existing zoning framework with the division of planning development. Of course, attorney Wade is here as well. We're all looking for clarity. and that is why we held the items, but that is why we're here today. So, I'm actually going to ask Councilwoman White to get us started. I know she had some questions from the meeting, and I believe we're going to start off just kind of looking into Rhonda's, ordinance, but one more thing, as we"
  3. Memphis City Council Member Elected Official transcribed from the official recording
    "JB Councilman Smiley's ordinance. His let me give you an example. His has a full moratorum 18 months, right? Councilman Warden's ordinance had no moratorium. Council woman Logan's ordinance had no moratorium and then my ordinance actually had an indefinite moratorum. So, as we go through and start talking about these things, we're trying to consolidate all of them, find"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Greater Memphis Chamber & xAI Project Representatives Developer & Economic Development Representatives
Venue: Greater Memphis Chamber & xAI Public Statements on Southwest Memphis Turbines
"Represented that portable methane gas turbines deployed at the Southwest Memphis Colossus AI supercomputer campus were temporary backup and bridging units exempt from preconstruction air permitting while awaiting utility substation upgrades."
Column B · Primary Government Record
Shelby County Health Department Air Permit Record & Memphis City Council Data Center Legislation Hearing
SCHD Air Pollution Control Permit Application · Memphis City Council Planning & Zoning Committee (Oct 8, 2026)
Agency or Venue: Shelby County Health Department & Memphis City Council
"Air permit filings and environmental monitoring documented up to 35 natural gas turbines installed at the Southwest Memphis site with potential nitrogen oxide emissions exceeding major stationary source thresholds in an ozone nonattainment area, prompting the Memphis City Council Planning and Zoning Committee on October 8, 2026 to take up municipal data center siting and utility oversight legislation."
Memphis City Council (Official)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    SpaceXAI agreed to timeline for removal of turbines with Mississippi Department of Environmental Quality, all turbines to be removed by July 2027.

    [6] independent.co.uk

  2. (source date; the content gives no date of its own)

    Operations at Colossus II came online in January 2026.

    [6] independent.co.uk

  3. (source date; the content gives no date of its own)

    Colossus I opened in 2024.

    [6] independent.co.uk

  4. (source date; the content gives no date of its own)

    Lawsuit filed in August 2026 seeks $30 million in damages, $20 million of which is punitive.

    [6] independent.co.uk

  5. (source date; the content gives no date of its own)

    Vicent died in Florida in February, months after the fall.

    [6] independent.co.uk

  6. (source date; the content gives no date of its own)

    Worker Alexis Vicent fell from a mezzanine at Colossus II in August 2025.

    [6] independent.co.uk

  7. (source date; the content gives no date of its own)

    Residents filed a lawsuit challenging the noise pollution from the data center

    [9] ctpublic.org

  8. (source date; the content gives no date of its own)

    Elon Musk announced the xAI campus could expand to 10 times its current capacity

    [9] ctpublic.org

4 earlier entries
  1. (source date; the content gives no date of its own)

    xAI promised to replace the gas turbines in one year with quieter permanent ones as of July 2026

    [9] ctpublic.org

  2. (source date; the content gives no date of its own)

    xAI's hyperscale data center in Memphis opened in 2024

    [2] wsmv.com

  3. · running (source date; the content gives no date of its own)

    TVA Board approved over 100 megawatts of firm power for SpaceXAI Memphis operations.

    [7] yahoo.com

  4. · being built (content date)

    SpaceXAI is expanding data center operations in Memphis, with Elon Musk confirming a fourth facility and the company adding another center in Whitehaven while removing gas turbines deemed illegal.

    [2] wsmv.com

Every event in order

8 corrections to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    Tier after resolution (September 21, 2026). The source on file is radionwtn.com, the publisher's own page. The item reached the record through Google News: "data center" Tennessee, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

  8. · Source tier

    Tier after resolution (September 21, 2026). The source on file is radionwtn.com, the publisher's own page. The item reached the record through Google News: "data center" Tennessee, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in Tennessee

Verified data center records in Tennessee within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
5C Data Centers Memphis AI Factory Campus (MEM01) Memphis, Shelby County 13 mi Being built 5C Data Centers 84 MW
EdgeConneX Memphis Data Center (EDCMEM01) Memphis, Shelby County 15 mi Running EdgeConneX 6 MW
Expedient Memphis Data Center Memphis, Shelby County 21 mi Running Expedient 6 MW
DataBank Memphis Cordova Data Center (MEM1) Memphis, Shelby County 22 mi Running DataBank 4 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Water a day

1 figure, 1 source
1 million gal/day Reported

multiple outlets (opens in a new tab)

Show each source's words
  • 1 million gal/day, multiple outlets: water draw, single site

Common questions about xAI Colossus Memphis Supercluster Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building xAI Colossus Memphis Supercluster Data Center Campus?

xAI is the developer. No construction contractor is named on the record yet.

Who will use xAI Colossus Memphis Supercluster Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does xAI Colossus Memphis Supercluster Data Center Campus say it needs?

Power: 500 MW (the developer's figure, wsmv.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does xAI Colossus Memphis Supercluster Data Center Campus stand today?
What is still unknown about xAI Colossus Memphis Supercluster Data Center Campus?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Musk confirms fourth SpaceXAI data center in Memphis, company starts removing 'illegal' gas turbines - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 31, 2026, trade press
  2. NAACP, Stand Up Nashville hold data center town hall with experts from across the country - WSMV (opens in a new tab), WSMV, September 11, 2026, local outlet
  3. Elon Musk's Memphis AI empire is the epicenter of the data center backlash - CNBC (opens in a new tab), CNBC, July 16, 2026, national outlet
  4. Memphis AI data center fuels pollution fight in Black neighborhood - France 24 (opens in a new tab), France 24, August 11, 2026, international outlet
  5. Memphis weighs data center moratorium in city Musk’s xAI calls ‘home’ - eenews.net (opens in a new tab), eenews.net, August 20, 2026, news outlet
  6. Elon Musk’s data center sued for $30 million by family of worker killed at site - The Independent (opens in a new tab), The Independent, September 18, 2026, international outlet
  7. TVA vote impacts data centers as Memphis residents raise environmental concerns - localmemphis.com (opens in a new tab), localmemphis.com, August 20, 2026, national outlet
  8. Congressional Candidate Molder Supports Memphis Data Center Moratorium - Radio NWTN (opens in a new tab), Radio NWTN, August 18, 2026, news outlet
  9. Residents file lawsuit challenging noise pollution from Elon Musk's data center (opens in a new tab), Connecticut Public, September 17, 2026, local outlet
  10. SpaceXAI adds another data center in Memphis; Whitehaven residents react - WREG.com (opens in a new tab), WREG.com, July 31, 2026, local outlet

10 sources on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "xAI Colossus Memphis Supercluster Data Center Campus", https://datacenterrecord.org/projects/spacexai-memphis-data-centers-tn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "xAI Colossus Memphis Supercluster Data Center Campus", https://datacenterrecord.org/projects/spacexai-memphis-data-centers-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
In court, Built from one source
Coordinates
35.05928, -90.15255
How the location is known
Location from the site's street address.
Location source
https://www.shelbytnhealth.com/
Coordinate source
Shelby County Assessor / Shelby County Health Department Air Permits
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
500 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · xAI Colossus Memphis Supercluster Data Center Campus · 10 sources, 12 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON