Data Center Record.

Being built Built from one source

5C Data Centers Memphis (MEM01)

Memphis, Shelby County, TNDeveloper: 5C Data CentersCensus GEOID 47157

Stage
Being built
Power
84 MW
the developer's figure
Undisclosed in public filings
Land, Buildings, Water

5C Data Centers is expanding its MEM01 facility at 4300 Getwell Road in the former Fred's corporate headquarters and distribution complex (1.1 million square foot site) from 20 MW to 84 MW using on site Bloom Energy solid oxide fuel cells and liquid cooled NVIDIA GB200 and GB300 NVL72 infrastructure under a $575 million Phase 4 alteration permit. It is being built; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 7 other published records in Tennessee
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Power it would draw
84 MW the developer's figure About 1 percent of New York City's summer peak demand in 2024.
[1] datacenterfrontier.com
Who leads it
5C Data Centers as stated by the source
[1] datacenterfrontier.com
Who is constructing it
Walker General Contractors as stated by the source
[1] datacenterfrontier.com
Where its power comes from
Bloom Energy solid oxide fuel cells as stated by the source
[1] datacenterfrontier.com
How it is cooled
Closed loop liquid as stated by the source
[1] datacenterfrontier.com
Undisclosed in public filings
Land, Buildings, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. 5C Data Centers Memphis (MEM01), capacity: 84 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 84 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

What it is for, as a source states it: AI, type not stated.

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 84 MW the developer's figure [1] datacenterfrontier.com (opens in a new tab) October 20, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it 5C Data Centers as stated by the source [1] datacenterfrontier.com (opens in a new tab) October 20, 2026
Who is constructing it Walker General Contractors as stated by the source [1] datacenterfrontier.com (opens in a new tab) October 20, 2026
How much land
Buildings
Where its power comes from Bloom Energy solid oxide fuel cells as stated by the source [1] datacenterfrontier.com (opens in a new tab) October 20, 2026
Grid connection
How it is cooled Closed loop liquid as stated by the source [1] datacenterfrontier.com (opens in a new tab) October 20, 2026
Cooling fluid

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Shelby County and Memphis about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Memphis restrictive Memphis city council voted against a data center moratorium proposal. wvlt.tv (opens in a new tab)
Memphis restrictive Memphis Mayor Paul Young issued an executive order to establish a 90 day study period on impacts of data center development cbsnews.com (opens in a new tab)
Memphis restrictive Memphis city council rejected a one year data center moratorium on Tuesday and passed a substitute ordinance halting construction for 135 days cbsnews.com (opens in a new tab)
Memphis restrictive U.S. District Court issued a temporary restraining order enjoining the Memphis City Council from enforcing bans against community activists attending public council meetings ahead of the data center vote. dailymemphian.com (opens in a new tab)
Memphis restrictive Memphis City Council postponed final action on competing data center regulatory measures, including Ordinance 5986 (large scale data center standards prohibiting evaporative cooling and protecting the Memphis Sand Aquifer) and Ordinance 5985 (digital infrastructure development districts). cbsnews.com (opens in a new tab)
Memphis restrictive Memphis City Council voted down a proposed 12 month temporary moratorium on data center permits (Agenda Item 19) sponsored by Councilmembers JB Smiley Jr., Jerri Green, Swearengen Washington, and Michalyn Easter Thomas. cbsnews.com (opens in a new tab)
9 earlier decisions on the county's rows
DateWhoDecisionSource
Memphis restrictive Memphis City Council passed a substitute ordinance halting data center permits and construction for 135 days while the city develops comprehensive zoning and environmental regulations. cbsnews.com (opens in a new tab)
Millington restrictive Millington Board of Mayor and Aldermen unanimously approved Resolution 44-2026 enacting a six month moratorium on data center and industrial computing facilities through April 12, 2027. dailymemphian.com (opens in a new tab)
Memphis restrictive Mayor Paul Young signed an executive order launching a 90 day data center policy review with appointed experts on land use, air quality, Memphis Sand Aquifer protection, utility costs, and noise without a permitting pause. dailymemphian.com (opens in a new tab)
Memphis restrictive Memphis City Council voted 7-5 to postpone a vote on a proposed data center moratorium businessinsider.com (opens in a new tab)
Memphis restrictive Memphis imposed data center moratorium while SpaceXAI continues expansion in Mississippi less than a mile away dailymemphian.com (opens in a new tab)
Memphis restrictive Three Memphis City Council members J.B. Smiley Jr., Yolanda Cooper Sutton, and Jana Swearengen Washington proposing 12 month moratorium on data center development thecentersquare.com (opens in a new tab)
Memphis restrictive xAI required government officials to sign NDAs during development of the Colossus facility near Memphis, Tennessee newsweek.com (opens in a new tab)
Memphis restrictive Memphis City Council ordinance for temporary moratorium on data center permits passed first reading on August 18. yahoo.com (opens in a new tab)
Memphis restrictive Memphis City Council proposed a temporary moratorium on new data center development radionwtn.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site's address.

The site map is at the top of the page.

Where
4300 Getwell Rd, Memphis, TN 38118, Memphis, Shelby County, Tennessee [1] datacenterfrontier.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of 5C Data Centers Memphis (MEM01)
LAT 35.03920 / LON -89.92840 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is 5C Data Centers Memphis (MEM01)?

The record has one measure of its size: 84 MW (the developer's figure, datacenterfrontier.com (opens in a new tab)). Its acreage is not disclosed.

Who is building 5C Data Centers Memphis (MEM01)?

5C Data Centers is the developer, datacenterfrontier.com (opens in a new tab), and Walker General Contractors is the construction contractor, datacenterfrontier.com (opens in a new tab). Both names come from the sources linked beside them.

Who will use 5C Data Centers Memphis (MEM01)?

No tenant is named, and its stated use is AI, type not stated. No promise to the community is on the record.

How much power and water does 5C Data Centers Memphis (MEM01) say it needs?

Power: 84 MW (the developer's figure, datacenterfrontier.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does 5C Data Centers Memphis (MEM01) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Memphis or Shelby County decided about it?

Memphis (rated restrictive): Memphis city council voted against a data center moratorium proposal (October 21, 2026, wvlt.tv (opens in a new tab)); and Memphis: Memphis Mayor Paul Young issued an executive order to establish a 90 day study period on impacts of data center development (reported October 21, 2026, cbsnews.com (opens in a new tab)). 15 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about 5C Data Centers Memphis (MEM01)?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, how much land, buildings, grid connection, cooling fluid. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Beyond Colossus: 5C Advances Memphis AI Factory Expansion (opens in a new tab), Data Center Frontier, October 19, 2026, trade press

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "5C Data Centers Memphis (MEM01)", https://datacenterrecord.org/projects/5c-data-centers-mem01-memphis-tn, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "5C Data Centers Memphis (MEM01)", https://datacenterrecord.org/projects/5c-data-centers-mem01-memphis-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
35.0392, -89.9284
How the location is known
Location from the site's street address.
Location source
developer filing and commercial building permit
Location last verified
October 20, 2026
Uses
AI, type not stated
Cooling
Closed loop liquid
How capacity was disclosed
the developer's figure
Capacity, if disclosed
84 MW, the developer's figure
Rating of the county's rows
Restrictive
Published
October 19, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Coordinate source, Location source number, EPA registry id, Tenancy, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · 5C Data Centers Memphis (MEM01) · 1 source, 0 entries, 15 decisions nearby · basis and source tier on every row · verified October 20, 2026

Download CSV JSON