      "slug": "5c-data-centers-mem01-memphis-tn",
      "name": "5C Data Centers Memphis (MEM01)",
      "summary": "5C Data Centers is expanding its MEM01 facility at 4300 Getwell Road in the former Fred's corporate headquarters and distribution complex (1.1 million square foot site) from 20 MW to 84 MW using on site Bloom Energy solid oxide fuel cells and liquid cooled NVIDIA GB200 and GB300 NVL72 infrastructure under a $575 million Phase 4 alteration permit.",
      "state": "TN",
      "city": "Memphis",
      "county": "Shelby County",
      "status": "under_construction",
      "developer": "5C Data Centers",
      "capacity_mw": 84,
      "latitude": 35.0392,
      "longitude": -89.9284,
      "location_precision": "address",
      "location_source": "developer filing and commercial building permit",
      "location_verified_at": "2026-10-20",
      "coordinate_source": null,
      "location_last_verified": "2026-10-20",
      "site_address": "4300 Getwell Rd, Memphis, TN 38118",
      "site_address_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "published": "2026-10-19",
      "last_verified": "2026-10-20",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "contractor": "Walker General Contractors",
      "contractor_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Bloom Energy solid oxide fuel cells",
      "power_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/5c-data-centers-mem01-memphis-tn",
      "sources": [
        {
          "title": "Beyond Colossus: 5C Advances  Memphis AI Factory Expansion",
          "url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
          "publisher": "Data Center Frontier",
          "date": "2026-10-19",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "ai_unspecified",
          "share_percent": null,
          "source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion"
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ]
}