Census GEOID: 47157 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 reporting source

● Running First recorded October 21, 2026 · 1 Building

EdgeConneX Memphis Data Center (EDCMEM01)

Street address 4005 South Mendenhall Road, Memphis, TN 38115, Shelby County verified address Exact, at the address [1] edgeconnex.com

Overview, regulatory gates and specifications

EdgeConneX operates its MEM01 edge colocation data center at 4005 South Mendenhall Road in Memphis, Shelby County, Tennessee. [1] Filings on the record specify disclosed capacity of 6 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Tennessee state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
6 MW
the developer's figure

Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4005 South Mendenhall Road, Memphis, TN 38115.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
6 MW developer figure Equivalent to the continuous electricity demand of about 4,980 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.059 percent) of New York City's summer peak demand in 2024.
[1] edgeconnex.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] edgeconnex.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
EdgeConneX as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. EdgeConneX Memphis Data Center (EDCMEM01), capacity: 6 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 6 ÷ 10,245 = 0.00059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: EdgeConneX
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Memphis Data Center (EDCMEM01).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 6 MW 6 MW the developer's figure [1] edgeconnex.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] edgeconnex.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

October 8, 2026 Memphis, TN Memphis City Council Planning and Zoning Committee Data Center Legislation Hearing Memphis City Council 3 clips

The Memphis City Council Planning and Zoning Committee met on October 8, 2026 to debate municipal data center zoning legislation, setbacks, and utility oversight following the rapid expansion of xAI's Colossus supercomputer campus and natural gas turbines in Southwest Memphis.

  1. Memphis City Council Planning and Zoning Chair Elected Official transcribed from the official recording
    "any discussion over data center legislation. I'm going to read the focus item for this meeting, but just to clarify, the Memphis City Council session from Tuesday is still in recess and due some things that we were brought up regarding the legislation. Here we are. So the focus item, this is all available to the public. We can provide you copies, but the intent of the meeting today and we're planning to go until 4:00 I believe, right? 4:00."
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "the existing zoning framework with the division of planning development. Of course, attorney Wade is here as well. We're all looking for clarity. and that is why we held the items, but that is why we're here today. So, I'm actually going to ask Councilwoman White to get us started. I know she had some questions from the meeting, and I believe we're going to start off just kind of looking into Rhonda's, ordinance, but one more thing, as we"
  3. Memphis City Council Member Elected Official transcribed from the official recording
    "JB Councilman Smiley's ordinance. His let me give you an example. His has a full moratorum 18 months, right? Councilman Warden's ordinance had no moratorium. Council woman Logan's ordinance had no moratorium and then my ordinance actually had an indefinite moratorum. So, as we go through and start talking about these things, we're trying to consolidate all of them, find"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Greater Memphis Chamber & xAI Project Representatives Developer & Economic Development Representatives
Venue: Greater Memphis Chamber & xAI Public Statements on Southwest Memphis Turbines
"Represented that portable methane gas turbines deployed at the Southwest Memphis Colossus AI supercomputer campus were temporary backup and bridging units exempt from preconstruction air permitting while awaiting utility substation upgrades."
Column B · Primary Government Record
Shelby County Health Department Air Permit Record & Memphis City Council Data Center Legislation Hearing
SCHD Air Pollution Control Permit Application · Memphis City Council Planning & Zoning Committee (Oct 8, 2026)
Agency or Venue: Shelby County Health Department & Memphis City Council
"Air permit filings and environmental monitoring documented up to 35 natural gas turbines installed at the Southwest Memphis site with potential nitrogen oxide emissions exceeding major stationary source thresholds in an ozone nonattainment area, prompting the Memphis City Council Planning and Zoning Committee on October 8, 2026 to take up municipal data center siting and utility oversight legislation."
Memphis City Council (Official)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Tennessee state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] edgeconnex.com

Nearest data centers in Tennessee

Verified data center records in Tennessee within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
5C Data Centers Memphis AI Factory Campus (MEM01) Memphis, Shelby County 2 mi Being built 5C Data Centers 84 MW
Expedient Memphis Data Center Memphis, Shelby County 6 mi Running Expedient 6 MW
DataBank Memphis Cordova Data Center (MEM1) Memphis, Shelby County 12 mi Running DataBank 4 MW
xAI Colossus Memphis Supercluster Data Center Campus Memphis, Shelby County 15 mi Running xAI 500 MW

Blank cell: not disclosed by any source on file.

Common questions about EdgeConneX Memphis Data Center (EDCMEM01)

Answered directly from the verified filings and local actions on this page.

Who is building EdgeConneX Memphis Data Center (EDCMEM01)?

EdgeConneX is the developer. No construction contractor is named on the record yet.

How much power and water does EdgeConneX Memphis Data Center (EDCMEM01) say it needs?

Power: 6 MW (the developer's figure, edgeconnex.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does EdgeConneX Memphis Data Center (EDCMEM01) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. EdgeConneX Memphis Data Center (EDCMEM01) Official Disclosure (opens in a new tab), EdgeConneX, news outlet

1 source on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "EdgeConneX Memphis Data Center (EDCMEM01)", https://datacenterrecord.org/projects/edgeconnex-memphis-edcmem01-tn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "EdgeConneX Memphis Data Center (EDCMEM01)", https://datacenterrecord.org/projects/edgeconnex-memphis-edcmem01-tn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
35.038995, -89.88623
How the location is known
Location from the site's street address.
Location source
https://www.edgeconnex.com/locations/americas/memphis-tn/
Coordinate source
Shelby County Assessor / EdgeConneX
How capacity was disclosed
the developer's figure
Capacity, if disclosed
6 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · EdgeConneX Memphis Data Center (EDCMEM01) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON