Data Center Record.
Census GEOID: 55101 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 reporting sources

● Proposed Campus Reported July 2, 2026 · 2 Buildings In court filed July 2, 2026

Microsoft Sturtevant Data Center

Street address County Highway H and Braun Road, Sturtevant, WI 53177, Racine County verified address Exact, at the address local.microsoft.com (opens in a new tab)

Overview, regulatory gates and specifications

Microsoft received municipal development approval for a data center campus along County Highway H and Braun Road in Sturtevant, Racine County, Wisconsin. [1] Filings on the record specify 2 planned or operational buildings. [1] Microsoft purchased 70 acres in Sturtevant, Racine County for $70 million and is considering building a data center adjacent to its operational Mount Pleasant facility. [1]

Verified Site & Permit Summary
Verified address
County Highway H and Braun Road, Sturtevant, WI 53177, Racine County verified address
Operator / developer
Microsoft
Permit / registry ID
www.jsonline.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
local.microsoft.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Microsoft as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Microsoft
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft Sturtevant Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: proposed (content date)

    Microsoft purchased 70 acres in Sturtevant, Racine County for $70 million and is considering building a data center adjacent to its operational Mount Pleasant facility.

    dailyreporter.com (opens in a new tab) local outlet

  2. · In court (source date; the content gives no date of its own)

    Residents filed lawsuit against Microsoft over noise from Mount Pleasant data center

    [3] wisn.com

  3. · Status: running (content date)

    Sturtevant residents filed a class action lawsuit against Microsoft over noise from a data center facility.

    local.microsoft.com (opens in a new tab) news outlet

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Wisconsin

Verified data center records in Wisconsin within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Microsoft Mount Pleasant Data Center Campus Mount Pleasant, Racine County 2 mi Running Microsoft 315 MW
Microsoft Caledonia Data Center Proposal Caledonia, Racine County 10 mi Stalled or cancelled Microsoft 2 buildings
CyberLynk Milwaukee Data Center (MKE1) Franklin, Milwaukee County 12 mi Running Wisconsin CyberLynk Network 2 MW
TierPoint Milwaukee Data Center Milwaukee, Milwaukee County 22 mi Running TierPoint 5 MW
324 East Wisconsin Carrier Hotel (Wells Building Milwaukee) Milwaukee, Milwaukee County 24 mi Running Wells Interconnection 5 MW
DataBank Milwaukee Data Center (formerly CoSentry) Milwaukee, Milwaukee County 24 mi Running DataBank 6 MW

Blank cell: not disclosed by any source on file.

Common questions about Microsoft Sturtevant Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Microsoft Sturtevant Data Center?

Microsoft is the developer. No construction contractor is named on the record yet.

How much power and water does Microsoft Sturtevant Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Microsoft Sturtevant Data Center stand today?

It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, October 20, 2026: Microsoft purchased 70 acres in Sturtevant, Racine County for $70 million and is considering building a data center adjacent to its operational Mount Pleasant facility.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Microsoft sued by Sturtevant residents for noise from data center (opens in a new tab), www.jsonline.com, July 2, 2026, local outlet
  2. Sturtevant residents file class action suit over Microsoft data center noise - wisconsinexaminer.com (opens in a new tab), wisconsinexaminer.com, July 2, 2026, local outlet
  3. Residents sue Microsoft over noise from Mount Pleasant data center (opens in a new tab), www.wisn.com, July 2, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the MRO East (MROE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft Sturtevant Data Center", https://datacenterrecord.org/projects/microsoft-sturtevant-data-center-wi, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft Sturtevant Data Center", https://datacenterrecord.org/projects/microsoft-sturtevant-data-center-wi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
In court, Built from one source
Coordinates
42.6952, -87.9015
How the location is known
Location from the site's street address.
Location source
https://local.microsoft.com/wisconsin/
Coordinate source
Village of Sturtevant development agreement parcel
Location last verified
September 16, 2026
Published
September 4, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Microsoft Sturtevant Data Center · 3 sources, 3 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON