Data Center Record.

Waiting on permits Built from one source

Stafford County data center complex

Stafford County Planning Commission backed a new 590,000 square foot data center complex. It is waiting on permits, since August 27, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 5 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Stafford County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Stafford County Stafford County Planning Commission voted 5-0 to recommend Board of Supervisors deny Potomac Creek Campus data center due to cemetery concerns fredericksburgfreepress.com
Stafford County The Stafford Technology Campus rezoned 524 acres on both sides of Eskimo Hill Road from agricultural to light industrial. youtube.com
Stafford County In 2024, the Stafford County Board of Supervisors approved the Stafford Technology Campus, the largest data center project in county history. youtube.com
Stafford County The US Army Corps of Engineers Norfolk District received permit application NAO-2025-01543 for Project Sisson on 2025-10-20. nao.usace.army.mil

What happened

  1. (content date)

    Stafford County Planning Commission backed a new 590,000 square foot data center complex. [4]

  2. (source date; the content gives no date of its own)

    Potomac Creek Campus proposed 975,000 square feet of data center space on 99 acres south of Eskimo Hill Road [5]

  3. · Status: permitting (source date; the content gives no date of its own)

    Stack topped out its first building at a 1 gigawatt data center campus in Stafford County, Virginia. [2]

  4. · Status: proposed (source date; the content gives no date of its own)

    A data center was proposed for 850 acres of land in Stafford County, Virginia. [3]

The full Stafford County data center complex timeline, in order

10 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: fredericksburgfreepress.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change. The day's label corrections.

  7. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives datacenterdynamics.com. The link did not change. The day's label corrections.

  8. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: wjla.com is a news outlet (tiered by kind, the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  9. · the source url of a status history row

    The source was a news.google.com wrapper url, which names no publisher and does not last. Resolved to the publisher's own page by the monitor's resolver on 2026-09-20 (docs/batch-va-record-fixes-0920.md, item 3). The outlet and the date on the row are unchanged. The old and new text.

  10. · the summary of a projects row

    Hyphenated compound split to meet the writing rule (DECISIONS section 12); the words are unchanged. The old and new text.

Every correction on the record is on the corrections page.

What was said

Willie Shelton Jr., planning commissioner, expressed concern about desecration of cemetery and opposition to placing data center on graveyard
Willie Shelton Jr., Hartwood District Planning Commissioner · May 29, 2026 · paraphrased · www.fredericksburgfreepress.com local outlet
Protect Stafford is a grassroots coalition working to ensure data center development in Stafford County is responsible, community informed, and sustainable.
Erin Sanzero, President of Protect Stafford · February 26, 2026 · paraphrased · YouTube video

Every statement about data centers in Virginia, by speaker

4 more statements on this page

Nancy Kotting, cultural resources specialist

Cemetery on Potomac Creek Campus site includes four known Seddon family burials and indications of 12 or more unmarked burials believed to be enslaved individuals

May 29, 2026, www.fredericksburgfreepress.com · www.fredericksburgfreepress.com local outlet · the record (Paraphrased; said in the source itself)

unnamed narrator

Data centers promise to generate millions of dollars in tax revenue for local governments.

February 26, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

unnamed narrator

Data center opponents raise concerns regarding noise and water overuse for cooling.

February 26, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

unnamed narrator

Virginia is home to the largest concentration of data centers in the world.

February 26, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

The site

Where in Stafford County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 35 other published records in Virginia
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Stafford County, Virginia
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Stafford County data center complex?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Stafford County data center complex say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Stafford County data center complex stand today?

It is waiting on permits, since August 27, 2026. The newest entry, August 27, 2026: Stafford County Planning Commission backed a new 590,000 square foot data center complex. [4]

What has Stafford County decided about it?

Stafford County: Stafford County Planning Commission voted 5-0 to recommend Board of Supervisors deny Potomac Creek Campus data center due to cemetery concerns (reported May 29, 2026, source); and Stafford County: The Stafford Technology Campus rezoned 524 acres on both sides of Eskimo Hill Road from agricultural to light industrial. (reported February 26, 2026, source). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Peterson Co. files for 16-building data center campus in Stafford County, Virginia, Data Center Dynamics, October 21, 2025, trade press
  2. Stack tops out first building at 1GW data center campus in Stafford County, Virginia, Data Center Dynamics, May 26, 2026, trade press
  3. Data center proposed for 850 acres of land in Stafford County, Virginia, Data Center Dynamics, July 29, 2025, trade press
  4. Stafford County Planning Commission backs new 590K-square-foot data center complex - WJLA, WJLA, August 27, 2026, local outlet
  5. Stafford County Planning Commission recommends denial of data center after cemetery concerns, www.fredericksburgfreepress.com, May 29, 2026, local outlet

5 sources on file.

Cite this record

Data Center Record, "Stafford County data center complex", https://datacenterrecord.org/projects/stafford-county-data-center-complex-va, last verified September 20, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Stafford County data center complex", https://datacenterrecord.org/projects/stafford-county-data-center-complex-va. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
stafford-county-data-center-complex-va
Status value
permitting
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/va/stafford-county
Coordinates
38.4153, -77.4156
Location precision
county
Location source
County seat (Stafford), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-20