Data Center Record.
Census GEOID: 12105 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Running First recorded September 14, 2026 · 1 Building

Cologix Lakeland Data Center (LAK1)

Street address 2850 Interstate Drive, Lakeland, FL 33805, Polk County verified address Exact, at the address cologix.com (opens in a new tab)

Overview, regulatory gates and specifications

Cologix operates its LAK1 Central Florida colocation and disaster recovery data center at 2850 Interstate Drive in Lakeland, Polk County, Florida. [1] Filings on the record specify disclosed capacity of 6 MW (the developer's figure), 1 planned or operational building. [1] Cologix lists Cologix LAK1 at Lakeland, Florida on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
6 MW
the developer's figure

Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2850 Interstate Drive, Lakeland, FL 33805.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
6 MW developer figure Equivalent to the continuous electricity demand of about 4,980 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.059 percent) of New York City's summer peak demand in 2024.
cologix.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
cologix.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
Cologix as stated by the source
Official project website
cologix.com (opens in a new tab) verified October 28, 2026
cologix.com (opens in a new tab)
Archived promotional websites
cologix.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Cologix Lakeland Data Center (LAK1), capacity: 6 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 6 ÷ 10,245 = 0.00059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Cologix
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Cologix Lakeland Data Center (LAK1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 6 MW 6 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

February 3, 2026 Fort Meade, FL The Commissioner's Report: Ft. Meade Data Center Polk County Board of County Commissioners 3 clips

Official recording of Polk County Board of County Commissioners in Fort Meade, FL: The Commissioner's Report: Ft. Meade Data Center (February 3, 2026).

  1. Wahneta City Council Officials and Speakers Elected Official transcribed from the official recording
    "And there might even be one coming to Polk County. Joining me today is County Commissioner Bill Braswell, alongside Doug Furstenberg, a principal at Stonebridge. Welcome to the show. Great to be here. Thanks. Thanks for having me. Absolutely. Mr. Furstenberg, there's a lot of talk about data centers. We hear about it all over the national news, especially up in the DC area where you're coming from. But there's not a lot of understanding amongst the public about what these buildings are and what they do. Can you explain that to our viewers? Sure."
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "a data center of 50MW was a really big deal. The campus we're looking at in the city of Fort Meade in Polk County is 1.2GW, a large one, but not the largest by far. So the dynamics around data centers have really changed. And what they do continues to evolve every single day as the technology advances. It's like a giant processor and hard drive all in one. Yeah, when we talked about it. Bring it down to my turn. Well, for those of us who are old,"
  3. Wahneta City Council Member Elected Official transcribed from the official recording
    "We just evolved. And now you go into these data centers. There are large halls. They have tons of racks, lots of blinking lights and a tremendous amount of cooling because all of that computing and power generates heat. And we've got to keep the processors cool to be able to do their work. Absolutely. And we'll talk about cooling a little bit later on. But first, I think this is a good opportunity for you to introduce yourself. What's your role, when it comes to this new data center?"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Cologix lists Cologix LAK1 at Lakeland, Florida on its own page of data center locations, read September 14, 2026.

    [1] cologix.com

Nearest data centers in Florida

Verified data center records in Florida within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Flexential Tampa North Data Center (TPA03) Tampa, Hillsborough County 24 mi Running Flexential 10 MW
Centersquare Tampa Data Center (TPA1) Tampa, Hillsborough County 25 mi Running Centersquare 6 MW
H5 Data Centers Tampa Franklin Exchange Carrier Hotel Tampa, Hillsborough County 31 mi Running H5 Data Centers 6 MW
Flexential Tampa West Data Center Campus (TPA01 and TPA02) Tampa, Hillsborough County 35 mi Running Flexential 12 MW
CoreSite Orlando Data Center Campus (OR1) Orlando, Orange County 41 mi Running CoreSite 14 MW
HostDime Orlando Tier IV Global Data Center Orlando, Orange County 51 mi Running HostDime 10 MW

Blank cell: not disclosed by any source on file.

Common questions about Cologix Lakeland Data Center (LAK1)

Answered directly from the verified filings and local actions on this page.

Who is building Cologix Lakeland Data Center (LAK1)?

Cologix is the developer. No construction contractor is named on the record yet.

How much power and water does Cologix Lakeland Data Center (LAK1) say it needs?

Power: 6 MW (the developer's figure, cologix.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Cologix Lakeland Data Center (LAK1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Cologix: Data centers (opens in a new tab), Cologix, September 14, 2026

1 source on file.

Regional grid context

This site is in the FRCC All (FRCC) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Cologix Lakeland Data Center (LAK1)", https://datacenterrecord.org/projects/cologix-lak1-lakeland-fl, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Cologix Lakeland Data Center (LAK1)", https://datacenterrecord.org/projects/cologix-lak1-lakeland-fl. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
28.079624, -81.975179
How the location is known
Location from the site's street address.
Location source
https://www.cologix.com/data-centers/lakeland/
Coordinate source
Polk County Property Appraiser / Cologix
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
6 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Cologix Lakeland Data Center (LAK1) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON