Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 1 primary and local source
HostDime operates its seven story, 95,000 square foot, 10 MW Tier IV flagship data center and corporate headquarters at 1 Innovative Place along Interstate 4 in the Orlando metropolitan area, Orange County, Florida. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Florida state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1 Innovative Place, Eatonville, FL 32751.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for HostDime Orlando Tier IV Global Data Center.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 10 MW | 10 MW | the developer's figure [1] hostdime.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] hostdime.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Orange County and Orlando about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Orange County | Orange County commissioners voted in support of temporary moratorium on large data centers used for AI | wusf.org (opens in a new tab) | |
| Orange County | Orange County commissioners will discuss temporarily banning hyperscale AI data center construction at Tuesday meeting | orlandoweekly.com (opens in a new tab) | |
| Orange County | Orange County Commission is scheduled to discuss a possible moratorium on data centers | orlandosentinel.com (opens in a new tab) |
WESH 2 News report on Orange County Legislative Delegation and community proceedings in Orlando, FL: Florida's new AI data center law takes effect amid ongoing concerns across party lines (July 3, 2026).
"There’s agreement across party lines in florida. I think that there is no law that can go strong enough against data centers. The new data center law, signed by governor ron desantis that went into effect wednesday, isn’t perfect. Ultimately, this was about having no data center regulations, or at least some protections for consumers. Under this new law, big tech companies have to foot the bill for these centers are the engines of the AI boom ratepayers and consumers like you and me will not have to"
"Front the cost of any of these data centers, which have really impacted energy bills for consumers in other states. Orange County democrat carlos guillermo smith voted yes, along with 31 other state senators after, in his opinion, the florida house weakened the bill. He says lawmakers in future sessions need to address transparency around the proliferation of data centers. Earlier versions of this bill would have prohibited local governments from signing non disclosure agreements with data center companies, which was a transparency measure that"
"Expanding data center will impact their communities. Power, water and noise levels. This one developed and operated by host. Time isn’t for artificial intelligence, but rather it supports data storage and servers in lake county, commissioners there have already moved to create a one year moratorium. While more research is done on how data centers could impact electricity and water usage. We have beautiful rural areas, and we have these awesome small downtowns."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Florida state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
Verified data center records in Florida within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Eatonville Wymore Road AI Data Center Proposal Eatonville, Orange County | Less than 1 mi | Proposed | Eatonville AI Data Center Developer | 1 building |
| CoreSite Orlando Data Center Campus (OR1) Orlando, Orange County | 13 mi | Running | CoreSite | 14 MW |
| Cologix Lakeland Data Center (LAK1) Lakeland, Polk County | 51 mi | Running | Cologix | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
HostDime is the developer. No construction contractor is named on the record yet.
Power: 10 MW (the developer's figure, hostdime.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Orange County: Orange County commissioners voted in support of temporary moratorium on large data centers used for AI (reported September 16, 2026, wusf.org (opens in a new tab)); and Orange County: Orange County commissioners will discuss temporarily banning hyperscale AI data center construction at Tuesday meeting (reported September 14, 2026, orlandoweekly.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the FRCC All (FRCC) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. HostDime Orlando Tier IV Global Data Center. Last verified October 27, 2026. https://datacenterrecord.org/projects/hostdime-orlando-tier-iv-data-center-fl. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about HostDime Orlando Tier IV Global Data Center
Data Center Record, "HostDime Orlando Tier IV Global Data Center", https://datacenterrecord.org/projects/hostdime-orlando-tier-iv-data-center-fl. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.