Data centers in Connecticut

Connecticut has 3 data center sites, 0 buildings where disclosed on the record: 2 running and 1 proposed. The largest proposal is Beacon Falls Data Center in New Haven County, 44 acres (third party estimate); it is reported, as reported August 17, 2026.

No statewide rule on the record. 2 cities have a pause or a ban on new data centers.

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

Projects and campuses on the record

Facility and countyStageOperatorPower (MW)Latest entry
Beacon Falls Data Center Beacon Falls, New Haven CountyProposedO&G Industries32Prior public process in 2022 involved a 32 MW facility proposal; current 2026 commercial marketing is for 100 MW AI capable, grid connected facility with up to 30 years of 100% sales and use tax abatements facebook.com (opens in a new tab) social media reported August 17, 2026
CyrusOne Norwalk NYM5 Norwalk, Western Connecticut Planning Region CountyRunningCyrusOne
TierPoint Waterbury Data Center Waterbury, Naugatuck Valley Planning Region CountyRunningTierPoint

A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record. All 3 Connecticut projects.

Every Connecticut record 3 records · sort by any column · blank cell: not disclosed

RecordPlaceStageOperatorMWBasisLocatedTierVerified
CyrusOne Norwalk NYM5Norwalk, Western Connecticut Planning RegionRunningCyrusOnecentroid22026-09-17
TierPoint Waterbury Data CenterWaterbury, Naugatuck Valley Planning RegionRunningTierPointcentroid22026-09-17
Beacon Falls Data CenterBeacon Falls, New HavenProposedO&G Industries32centroid12026-09-25

Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.

Every Connecticut county (9)

No county in Connecticut has a record yet. A county gets its own page with the first published record.

CountyCensus GEOIDProjects
Capitol Planning Region091100
Greater Bridgeport Planning Region091200
Lower Connecticut River Valley Planning Region091300
Naugatuck Valley Planning Region091400
Northeastern Connecticut Planning Region091500
Northwest Hills Planning Region091600
South Central Connecticut Planning Region091700
Southeastern Connecticut Planning Region091800
Western Connecticut Planning Region091900

A county without a record is listed, not linked.

The rules in Connecticut 4 rows · rating rests only on a binding act in force

What the state and its counties and cities have decided. Each row is rated by what it has decided, open, case by case, restrictive or closed, never by whether that is good or bad.

BodyLevelRatingIn force untilLatest actActsVerified
Connecticutstatenot ratedGroton, West Haven, and Morris Connecticut instituted moratoriums on data center construction. today.uconn.edu (opens in a new tab) news outlet Reported Sep 105 acts on this row
Every act on the Connecticut row
  1. moratorium

    Groton, West Haven, and Morris Connecticut instituted moratoriums on data center construction

    today.uconn.edu (opens in a new tab) news outlet

  2. event

    Connecticut passed a bill requiring AI companion services to disclose when users are dealing with AI

    ctinsider.com (opens in a new tab) local outlet

  3. event

    Connecticut passed Senate Bill 5 on AI safety this year, led by Sen. James Maroney.

    ctmirror.org (opens in a new tab) local outlet

  4. event

    State lawmakers considered but did not pass a bill this year that would have eliminated Connecticut's data center tax incentives

    hartfordbusiness.com (opens in a new tab) local outlet

  5. event

    Connecticut opened tax incentives to new data centers in 2021 but has since pulled back after getting few takers

    wshu.org (opens in a new tab) local outlet

Last verified September 23, 2026.

52026-09-23
West Havencityrestrictive until June 10, 20272027-06-10West Haven approved a one year moratorium on new data centers. nhregister.com (opens in a new tab) news outlet Jun 10, 20262 acts on this row
Every act on the West Haven row
  1. moratorium adopted

    West Haven passed a 1 year moratorium on data centers

    ctpublic.org (opens in a new tab) local outlet

  2. moratorium adopted

    West Haven approved a one year moratorium on new data centers

    nhregister.com (opens in a new tab) news outlet

Last verified September 23, 2026.

22026-09-23
Trumbullcityclosed until September 11, 20282028-09-11Trumbull passes a 2 year moratorium on new data centers. ctpublic.org (opens in a new tab) local outlet Sep 11, 20261 act on this row
Every act on the Trumbull row
  1. moratorium adopted

    Trumbull passes a 2 year moratorium on new data centers

    ctpublic.org (opens in a new tab) local outlet

Last verified September 23, 2026.

12026-09-23
New Havencitynot ratedNew Haven took a pause on potential data center development. nbcconnecticut.com (opens in a new tab) local outlet Reported Jul 71 act on this row
Every act on the New Haven row
  1. moratorium

    New Haven took a pause on potential data center development

    nbcconnecticut.com (opens in a new tab) local outlet

Last verified July 7, 2026.

12026-07-07

Reported: the source's date; the item names no day of its own. A rating rests only on a binding act in force; "not rated" means no person has set one. A blank cell means the record holds nothing for it.

Connecticut laws and the full scorecard

Bills and laws in Connecticut

none signed into law yet, 5 bills tracked

5 bills tracked in the Connecticut legislature, none signed into law yet, grouped by where each stands. A row opens its own page; the Connecticut laws page has what each law requires.

No official summary on file for 1 of these 5 measures; each row links to the legislature's page for the text.

Moving 1

In committee 4

5 bills tracked, 0 signed · LegiScan, CC BY 4.0

NumberSessionStatusDateTitle
H.B. 5469 2026 General Assembly In committee 2026-04-07 An Act Concerning Colocated Electric Suppliers And Large Electric Load Customers.
S.B. 245 2026 General Assembly In committee 2026-03-17 An Act Eliminating Certain Tax Incentives For Data Centers.
S.B. 1292 2025 General Assembly In committee 2025-04-07 An Act Requiring A Study Concerning Energy Efficiency Requirements For Artificial Intelligence Data Centers.
H.B. 5076 2025 General Assembly In committee 2025-01-10 An Act Concerning Energy And Water Efficiency Requirements For Artificial Intelligence Data Centers.
H.B. 6514 2021 General Assembly Passed both chambers 2021-03-25 An Act Concerning Incentives For Qualified Data Centers To Locate In The State.

5 bills tracked in Connecticut; 2026 General Assembly, legislature adjourned; last checked October 26, 2026. The last check found: 2 bills matched the watch terms as of October 26, 2026. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.

How this state's members voted

H.R. 9340, Ratepayer Protection Act: U.S. House of Representatives, roll call 312, September 16, 2026. On Motion to Suspend the Rules and Pass, as Amended. Passed, 417 to 3. Connecticut's members: 5 yea, 0 nay. How each member voted

MemberPartyPosition
CourtneyDYea
DeLauroDYea
HayesDYea
HimesDYea
Larson (CT)DYea

A blank party cell means the clerk's roll gives none.

H.R. 9340, Ratepayer Protection Act: U.S. Senate, roll call 254, September 30, 2026. On Cloture on the Motion to Proceed H.R. 9340. Cloture on the Motion to Proceed Rejected, 57 to 43. Connecticut's members: 0 yea, 2 nay. How each member voted

MemberPartyPosition
Blumenthal (D-CT)DNay
Murphy (D-CT)DNay

A blank party cell means the clerk's roll gives none.

Positions as the clerk records them. How bills and votes are recorded.

What was said

Fazio is critical of Lamont's efforts in pushing for past legislation that allowed data centers to get tax breaks, saying no well connected companies should get special tax benefits at the expense of middle class families.
Ryan Fazio, State Senator · October 15, 2026 · paraphrased · Connecticut Public (opens in a new tab) local outlet
Robyn Sullivan, CEO and President of Cloudsmart Inc, said the data center has been creating its own power with Tecogen's InVerde for a few months and has cut electric bills substantially
Robyn Sullivan, CEO and President of Cloudsmart Inc · October 14, 2026 · paraphrased · Stock Titan (opens in a new tab) national outlet

Every Connecticut statement, by speaker (31)

28 more on this page, one per speaker and claim; 31 statements in all
"It could be a very large AI data center from a square footage point of view. It's currently small. We're okay with it remaining small, maybe, with the right regulatory environment. We don't want it to be bigger and we don't want more"
Richard White, Co-leader, Trumbull AI Data Center Watch group Media interview Connecticut Public (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Media interview.

Primary source: Connecticut Public (opens in a new tab).

Abinand Rangesh, CEO of Tecogen, said the InVerde installation at Cloudsmart demonstrates the product's suitability for data center environments and is needed to convert Tecogen's data center pipeline into orders

Stock Titan (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Stock Titan (opens in a new tab).

Sen. Chris Murphy criticized the Ratepayer Protection Act as containing no new mandatory rules restricting data centers

U.S. Senator (D-Connecticut) Yahoo (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Yahoo (opens in a new tab).

Data centers bring thousands of construction jobs and millions of dollars in property taxes without requiring new roads and schools, since most centers only employ a few dozen people

Dan Diorio, Data Center Coalition connecticut.news12.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: connecticut.news12.com (opens in a new tab).

Shinsuke Tanaka, assistant professor of agricultural and resource economics at UConn, an expert on health and environmental economics, discusses how data center issues impact human and environmental health.

assistant professor of agricultural and resource economics, University of Connecticut Hartford Courant (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Hartford Courant (opens in a new tab).

Bob Duff calls for no new data centers in Connecticut or on the New England grid until strict laws on AI and data centers are enacted.

Connecticut legislator ctmirror.org (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ctmirror.org (opens in a new tab).

Shinsuke Tanaka stated that downwind pollution from power plants led to higher COVID-19 mortality rates

assistant professor of agricultural and resource economics today.uconn.edu (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: today.uconn.edu (opens in a new tab).

"This is going to be a small data center that probably will use more electricity than the previous one did. That puts added pressure on our grid, especially during peak times."
Kenneth Gillingham, Professor of Environmental and Energy Economics, Yale School of the Environment Trumbull Town Hall CT Mirror (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Trumbull Town Hall.

Primary source: CT Mirror (opens in a new tab).

"I told the applicant directly: no increase in electrical draw beyond existing site capacity, no increase in noise, no increase in water use, no expansion of the building's footprint. They have agreed to all four."
Vicki Tesoro, First Selectman, Trumbull Trumbull Town Hall CT Mirror (opens in a new tab) local outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Trumbull Town Hall.

Primary source: CT Mirror (opens in a new tab).

Lamont said proposals in which a developer offers to supply its own water and electrical power can be reviewed on a case by case basis

Governor WSHU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WSHU (opens in a new tab).

Governor Ned Lamont said he is open to building IT infrastructure in Connecticut, but there is no place for massive data centers in the state

WSHU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WSHU (opens in a new tab).

Lamont stated a major data center would demand a large amount of electricity, which could raise electric rates for residents

Governor WSHU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WSHU (opens in a new tab).

Gordon emphasizes the need for added infrastructure for new transmission lines, roads, or other improvements when data centers come to a town

Connecticut State Senator Hartford Courant (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Hartford Courant (opens in a new tab).

Fazio called for repeal of a tax break for data centers and for guardrails on the industry, including a requirement that data centers bring their own power

ranking Republican, Connecticut Energy and Technology Committee Hartford Courant (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Hartford Courant (opens in a new tab).

Ryan Fazio, ranking Republican on the legislature Energy and Technology Committee, said he was not calling for a blanket ban or moratorium on data centers

ranking Republican, Connecticut Energy and Technology Committee Hartford Courant (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Hartford Courant (opens in a new tab).

President Donald Trump said if he were a mayor or governor with a chance to land a big data center he would absolutely want it because the jobs and taxes paid are enormous

CTPost (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: CTPost (opens in a new tab).

On the November 3, 2026 ballot in Connecticut: Governor (2), U.S. House, District 1 (3), U.S. House, District 2 (2), U.S. House, District 3 (3), U.S. House, District 4 (3), U.S. House, District 5 (2); 2 of 15 candidates with a statement on data centers on the record. Every candidate.

Already running in Connecticut

2 sites are serving load, 1 of them in Western Connecticut Planning Region County.

See the 2 running sites
  1. CyrusOne Norwalk NYM5 Norwalk, Western Connecticut Planning Region County Running · Operational since 2014 (12 years)
  2. TierPoint Waterbury Data Center Waterbury, Naugatuck Valley Planning Region County Running

Questions about Connecticut data centers

How many data center projects are on the record in Connecticut?

3 projects are on the record in Connecticut: 1 reported and 2 running. Each is listed under Projects with its status history and sources. Resources: the questions people ask about data centers

answered from the rows above

Where in Connecticut are they?

The county is not disclosed for the 3 records on file. Resources: the questions people ask about data centers

answered from the rows above

How much power is disclosed for data centers in Connecticut?

Not disclosed. None of the 3 records on file for Connecticut states a power figure. Resources: the questions people ask about data centers

answered from the rows above

How much water do data centers in Connecticut say they will use?

Not disclosed. None of the 3 records on file for Connecticut states a water figure. Resources: the questions people ask about data centers

answered from the rows above

Who is building data centers in Connecticut?

3 developers are named on the record: CyrusOne, O&G Industries and TierPoint. Each name opens the record, where the developer's source is listed. Resources: the questions people ask about data centers

answered from the rows above

Which counties and cities in Connecticut have rules about data centers?

3 county and city rows are on the record, 2 of them rated: West Haven is rated restrictive: West Haven approved a one year moratorium on new data centers, June 10, 2026, source (opens in a new tab), Trumbull is rated closed: Trumbull passes a 2 year moratorium on new data centers, September 11, 2026, source (opens in a new tab) and New Haven has no rating yet: New Haven took a pause on potential data center development (reported July 7, 2026, source (opens in a new tab)). Every row and its dated events are on the scorecard. Resources: the questions people ask about data centers

answered from the rows above

What is proposed or being built near me in Connecticut, by county?

1 record is not yet running. New Haven County: Beacon Falls Data Center (reported). A county name opens its page with the map and every record there. Resources: the questions people ask about data centers

answered from the rows above

What has the state of Connecticut itself decided?

No bill on data centers has been signed into law in Connecticut yet. 5 bills are tracked under Laws: 1 moving and 4 in committee. The state's own scorecard row carries 5 dated acts, the newest reported September 10, 2026. Resources: the questions people ask about data centers

answered from the rows above

Disclosed figures

nothing disclosed by 3 records

summed only where a record disclosed the figure

FigureDisclosed totalDisclosedWithout a figureBasis
Power03
Water, stated per day03
Water, stated per year03
Permanent jobs03
Tax each year03

A blank cell means no record in Connecticut disclosed the figure. Third party figures on the same metrics are listed apart below; a figure a project disclosed about itself is never mixed with them.

FigureDisclosed totalDisclosedWithout a figureBasis
Power03
Water, stated per day03
Water, stated per year03
Permanent jobs03
Tax each year03

A blank total means no record disclosed the figure; the count without one says how many.

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

The disclosed totals are in the table above.

No source on file states what any of the 3 tracked facilities in Connecticut are for.

What each use disclosed

UseRecordsPowerWaterJobsTax each year
No stated use3

A blank cell means no record with that use disclosed the figure.

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

No source on file states how any of the 3 tracked facilities in Connecticut are cooled.

Sources read for Connecticut

9 sources

9 sources are read for Connecticut:

Public broadcaster
Connecticut Public
Utility commission dockets
Connecticut Public Utilities Regulatory Authority
Economic development
Connecticut Department of Economic and Community Development
Search feeds
6 news searches
Every feed, with its kind and tier

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Only what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Data centers in Connecticut", https://datacenterrecord.org/states/ct, updated October 22, 2026. CSV · JSON · GeoJSON
Cite this page

Data Center Record, "Data center records in Connecticut", https://datacenterrecord.org/states/ct. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
State code
CT
Rating of the state's own row
None, no statewide rule
Count by status
reported 1, running 2
Located records
0 located, 3 at a centroid, 0 without coordinates

Researcher view · Connecticut · 3 data center sites, 0 buildings where disclosed, 4 rule rows, 5 bills · basis and source tier on every row · verified October 22, 2026