Data Center Record.
Census GEOID: 28033 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 reporting sources

● Proposed Campus First recorded September 5, 2026

SpaceXAI Southaven Data Center (Fifth Location)

Location Southaven, DeSoto County, Mississippi county centroid County level, the county seat

Overview, regulatory gates and specifications

Southaven approved a new SpaceXAI data center, described as the fifth location in the area, and separately the operator shut off 11 temporary turbines that had been powering the Southaven facility. [1]

1. Land & Parcel
Location tracked
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
SpaceXAI as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: SpaceXAI
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for SpaceXAI Southaven Data Center (Fifth Location).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

January 20, 2026 Southaven, MS Residents react as construction moves forward on xAI's Southaven data center Southaven Board of Aldermen 3 clips

ABC24 Memphis report on Southaven Board of Aldermen and community proceedings in Southaven, MS: Residents react as construction moves forward on xAI's Southaven data center (January 20, 2026).

  1. ABC24 Memphis Broadcast Report Broadcast Report transcribed from local broadcast report
    "He spoke with residents who say they are already feeling the impact. Robert Tipton Jr. tells me he lives about 6 miles away from the XAI facility here in South Haven. He tells me he's worried about the potential health risk to children and seniors could increase if the community doesn't speak out. Records show XAI South Haven facility recently filed an application for 41 natural gas turbines. According to the Mississippi Department of Environmental Quality,"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "While the EPA does not approve or operate the plant, it does enforce Federal Clean Air Act standards and can intervene if violations occur, Shannon Sanzma, a South Haven. The resident says she has observed what she believes , to be at least 18 turbines operating since , August. There's at least 18 turbines that started running in August, and although I was also assured they would not run 24/7, many are running 16 to 24 hours a day. Sam Sma, who works in healthcare,"
  3. ABC24 Memphis Broadcast Report Broadcast Report transcribed from local broadcast report
    "Sam Sma, who works in healthcare, spoke at a South Haven City council meeting earlier this month. She says she's concerned about potential long term impact on young residents. These turbines are operating within 2 miles of more than 10 different schools with children whose lungs are still developing. South Haven Mayor Darren Musselwhite says he would not support any project that puts residents' lives in jeopardy. I would not be an advocate for anything that was going to jeopardize the health of the people. The mayor claims the project is a significant economic benefit to the county."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

8 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Mississippi

Verified data center records in Mississippi within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
xAI Southaven turbine site Southaven, DeSoto County Less than 1 mi Proposed SpaceX

Blank cell: not disclosed by any source on file.

Common questions about SpaceXAI Southaven Data Center (Fifth Location)

Answered directly from the verified filings and local actions on this page.

Who is building SpaceXAI Southaven Data Center (Fifth Location)?

SpaceXAI is the developer. No construction contractor is named on the record yet.

How much power and water does SpaceXAI Southaven Data Center (Fifth Location) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does SpaceXAI Southaven Data Center (Fifth Location) stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Southaven approves new SpaceXAI data center, fifth location in area - Action News 5 (opens in a new tab), Action News 5, September 2, 2026, local outlet
  2. SpaceXAI shuts off 11 temporary turbines powering Southaven data center - SuperTalk Mississippi Media (opens in a new tab), SuperTalk Mississippi Media, August 31, 2026, local outlet
  3. Southaven approves new SpaceXAI data center, fifth location in area (opens in a new tab), www.wlox.com, September 3, 2026, local outlet
  4. Southaven approves new SpaceXAI data center, fifth location in area - Action News 5 (opens in a new tab), Action News 5, September 2, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the SERC Mississippi Valley (SRMV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "SpaceXAI Southaven Data Center (Fifth Location)", https://datacenterrecord.org/projects/spacexai-southaven-data-center-fifth-location-ms, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "SpaceXAI Southaven Data Center (Fifth Location)", https://datacenterrecord.org/projects/spacexai-southaven-data-center-fifth-location-ms. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
34.8308, -89.9936
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Hernando), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · SpaceXAI Southaven Data Center (Fifth Location) · 4 sources, 0 entries · basis and source tier on every row · verified September 17, 2026