Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 1 primary and 6 reporting sources
TierPoint operates a commercial colocation data center at 1111 Olive Street in downtown St. Louis, Missouri. [2] Filings on the record specify disclosed capacity of 10 MW (the developer's figure), 1 planned or operational building. [2] TierPoint lists TierPoint St. Louis - Olive Data Center, TierPoint St. Louis - Locust Data Center at St. Louis, Missouri on its own page of data center locations, read September 14, 2026. [1]
Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1111 Olive Street, St. Louis, MO 63101.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for TierPoint St. Louis Downtown Data Center (Olive).
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 10 MW | 10 MW | the developer's figure |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
On August 28, 2026, the St. Louis Board of Aldermen voted unanimously to advance Board Bill 49, establishing the city's first comprehensive zoning, conditional use, water disclosure, and noise regulations for data centers.
"It establishes size classifications for data centers. Restrictions on where they can be built. Noise, regulations and water use its guidelines. The measure also requires new data centers with loads exceeding 5 megawatts to give 100% of their electricity from renewable energy sources. The bill is sponsored by first ward alderwoman and schweitzer. This is all about"
"Lot of concerns about the proliferation of data centers and the amount of energy that they use and will continue to use and the effect. On our on our climate, on environment, on our ability to exist in this world. So I think it's really important that we in the local level act to protect the people we represent. Even if that means fighting against some pretty powerful interests."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: running (source date; the content gives no date of its own)
TierPoint completed a new data center in St. Louis, Missouri
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
TierPoint lists TierPoint St. Louis - Olive Data Center, TierPoint St. Louis - Locust Data Center at St. Louis, Missouri on its own page of data center locations, read September 14, 2026.
Verified data center records in Missouri within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| H5 Data Centers St. Louis St. Louis, St. Louis city | Less than 1 mi | Running | H5 Data Centers | 8 MW |
| Netrality and Digital Realty 210 North Tucker Carrier Hotel St. Louis, St. Louis city | Less than 1 mi | Running | Netrality Data Centers / Digital Realty | 22 MW |
| 710 North Tucker Carrier Hotel (Globe Building St. Louis) St. Louis, St. Louis city | Less than 1 mi | Running | Hostirian | 10 MW |
| Netrality St. Louis 900 Walnut Carrier Hotel St. Louis, St. Louis city | Less than 1 mi | Running | Netrality Data Centers | 12 MW |
| TierPoint St. Louis Downtown (2300 Locust Street) St. Louis, St. Louis city | Less than 1 mi | Running | TierPoint | 1 building |
| St. Louis Midtown Chouteau Data Center Proposal St. Louis, St. Louis city | 2 mi | Proposed | Midtown Technology Partners | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
TierPoint is the developer. No construction contractor is named on the record yet.
Power: 10 MW (the developer's figure, tierpoint.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running, as reported August 5, 2022. The newest entry, reported August 5, 2022: TierPoint completed a new data center in St. Louis, Missouri [7].
Official operator or facility campus page verified in 50 state website discovery pass.
7 sources on file.
This site is in the SERC Midwest (SRMW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. TierPoint St. Louis Downtown Data Center (Olive). Last verified October 27, 2026. https://datacenterrecord.org/projects/tierpoint-st-louis-mo. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about TierPoint St. Louis Downtown Data Center (Olive)
Data Center Record, "TierPoint St. Louis Downtown Data Center (Olive)", https://datacenterrecord.org/projects/tierpoint-st-louis-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.