Running Missouri Department of Natural Resources Stationary Emergency Generator and Commercial Facility Record (710 North Tucker Boulevard, St. Louis, MO 63101)
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What St. Louis has decided
No facility record and no county act is on the record for St. Louis yet. The Missouri state rule applies: case by case.
Missouri state rule · case by case Missouri enacted legislation in 2025 requiring regulators to establish rates for large load customers, including data centers, to reflect those customers' costs. (September 12, 2026) · Verified . stl.news (opens in a new tab)local outlet
August 28, 2026St. Louis, MOSt. Louis Board of Aldermen Board Bill 49 Data Center Regulations VoteSt. Louis Board of Aldermen2 clips
On August 28, 2026, the St. Louis Board of Aldermen voted unanimously to advance Board Bill 49, establishing the city's first comprehensive zoning, conditional use, water disclosure, and noise regulations for data centers.
FOX 2 St. Louis Broadcast ReportBroadcast Reporttranscribed from local broadcast report
"It establishes size classifications for data centers. Restrictions on where they can be built. Noise, regulations and water use its guidelines. The measure also requires new data centers with loads exceeding 5 megawatts to give 100% of their electricity from renewable energy sources. The bill is sponsored by first ward alderwoman and schweitzer. This is all about"
Resident public commentResident Public Commenttranscribed from local broadcast report
"Lot of concerns about the proliferation of data centers and the amount of energy that they use and will continue to use and the effect. On our on our climate, on environment, on our ability to exist in this world. So I think it's really important that we in the local level act to protect the people we represent. Even if that means fighting against some pretty powerful interests."
Data center noise increases cortisol, cardiovascular risk, decreases cognitive functioning especially in children, and can delay healing in hospital settings
David Lambiaso, partner in TerraWatt, filed a suit against the city's Board of Adjustment over renewable energy requirements and community benefits agreement approval conditions.
David Lambiaso, TerraWatt partner · September 17, 2026 · paraphrased · STLPR (opens in a new tab)local outlet
Steve Smith, City Foundry STL developer, proposed keeping the planned data center while preserving the Armory as an entertainment venue instead of converting it to corporate offices
193 miles awayGreene County: 1 data center on the record.
222 miles awayJackson County: 8 data centers on the record.
Distances run between the centers the Census Bureau gives each place. Every Missouri county.
Disclosed figures
62 MW power
Power, water, jobs and tax, summed only where a data center disclosed the figure; what each facility is for; how each is cooled. Nothing here is estimated.
Power, water, jobs and tax
Figure
Disclosed total
Disclosed
Without a figure
Basis
Power
62 MW
5
3
5 the developer's figure
Water, stated per day
0
8
Water, stated per year
0
8
Permanent jobs
0
8
Tax each year
0
8
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
Use
Records
Power
Water
Jobs
Tax each year
No stated use
8
62 MW
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 8 tracked facilities in St. Louis are for.
How the facilities are cooled
No source on file states how any of the 8 tracked facilities in St. Louis are cooled.
FiguresOnly what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
LicenseData CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this pageData Center Record, "Data centers in St. Louis, St. Louis city, Missouri", https://datacenterrecord.org/states/mo/st-louis-city/st-louis, updated November 6, 2026.CSV · JSON
Data Center Record, "Data center records in St. Louis, St. Louis city, Missouri", https://datacenterrecord.org/states/mo/st-louis-city/st-louis. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
Researcher view · St. Louis, St. Louis city, Missouri · 8 records, 0 rule rows · Census GEOID 2965000 · basis and source tier on every row · verified November 6, 2026