Data Center Record.

Reported Built from one source

St. Louis Armory Data Center

A data center near the Armory in St. Louis was allowed to move forward by the St. Louis board under new rules in July 2026. It is reported, as reported September 17, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    The project is planned at an 11 acre site in the old Famous Barr warehouse. [1]

  2. (source date; the content gives no date of its own)

    The city's renewable energy requirements require the data center to use 2.4 megawatts of renewable energy. [1]

  3. (source date; the content gives no date of its own)

    The developer filed suit against the city this week; the company plans to build a data center as part of a planned technology district. [1]

  4. · Status: rumored (source date; the content gives no date of its own)

    TerraWatt plans to build a 120 megawatt data center in the old Famous Barr warehouse on Market Street as part of a planned technology district. [1]

The full St. Louis Armory Data Center timeline, in order

6 corrections to this record

Every correction, with its reason
  1. · the status of a projects row

    The stage was set by timeline entries that were returned to draft on 2026-09-17 (they had been published onto the record while it was still a draft skeleton). With no published entry behind it the record reads rumored until one is approved. The old and new text.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  5. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  6. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

Every correction on the record is on the corrections page.

What was said

David Lambiaso, partner in TerraWatt, filed a suit against the city's Board of Adjustment over renewable energy requirements and community benefits agreement approval conditions.
David Lambiaso, TerraWatt partner · September 17, 2026 · paraphrased · STLPR local outlet
Steve Smith, City Foundry STL developer, proposed keeping the planned data center while preserving the Armory as an entertainment venue instead of converting it to corporate offices
Steve Smith, City Foundry STL developer · September 15, 2026 · paraphrased · www.facebook.com local outlet

Every statement about data centers in Missouri, by speaker

The site

Where in St. Louis is not in the public record. The pin marks the center of St. Louis, not a building, and the outline is St. Louis city.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 17 other published records in Missouri
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
St. Louis, St. Louis city, Missouri
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building St. Louis Armory Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does St. Louis Armory Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does St. Louis Armory Data Center stand today?

It is reported, as reported September 17, 2026. The newest entry, reported September 17, 2026: The project is planned at an 11 acre site in the old Famous Barr warehouse. [1]

What has St. Louis or St. Louis city decided about it?

No decision by St. Louis or St. Louis city about data centers is on the record. The St. Louis city page and the Missouri scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Developer behind controversial data center near Armory sues St. Louis - STLPR, STLPR, September 17, 2026, local outlet
  2. Armory Data Center Deal Advances in St. Louis - stl.news, stl.news, September 15, 2026, local outlet
  3. St. Louis board allows data center near Armory to move forward with new rules - STLPR, STLPR, July 30, 2026, local outlet
  4. St. Louis could get $8.3 million from Armory data center by spring - STLtoday.com, STLtoday.com, September 14, 2026, local outlet

4 sources on file.

Cite this record

Data Center Record, "St. Louis Armory Data Center", https://datacenterrecord.org/projects/st-louis-armory-data-center-mo, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "St. Louis Armory Data Center", https://datacenterrecord.org/projects/st-louis-armory-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
st-louis-armory-data-center-mo
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/mo/st-louis-city/st-louis
Coordinates
38.6357896, -90.2451124
Location precision
city
Location source
City centroid (St. Louis), U.S. Census Bureau TIGERweb, public domain, placed at city level
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 17, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17