A data center near the Armory in St. Louis was allowed to move forward by the St. Louis board under new rules in July 2026. It is reported, as reported September 17, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Not disclosed
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Not disclosed | |||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Who is behind itA land record, a zoning application or a company's own announcement.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
(source date; the content gives no date of its own)
The project is planned at an 11 acre site in the old Famous Barr warehouse. [1]
-
(source date; the content gives no date of its own)
The city's renewable energy requirements require the data center to use 2.4 megawatts of renewable energy. [1]
-
(source date; the content gives no date of its own)
The developer filed suit against the city this week; the company plans to build a data center as part of a planned technology district. [1]
-
· Status: rumored (source date; the content gives no date of its own)
TerraWatt plans to build a 120 megawatt data center in the old Famous Barr warehouse on Market Street as part of a planned technology district. [1]
The full St. Louis Armory Data Center timeline, in order
6 corrections to this record
Every correction, with its reason
-
· the status of a projects row
The stage was set by timeline entries that were returned to draft on 2026-09-17 (they had been published onto the record while it was still a draft skeleton). With no published entry behind it the record reads rumored until one is approved. The old and new text.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
-
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
-
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
Every correction on the record is on the corrections page.
What was said
David Lambiaso, partner in TerraWatt, filed a suit against the city's Board of Adjustment over renewable energy requirements and community benefits agreement approval conditions.
Steve Smith, City Foundry STL developer, proposed keeping the planned data center while preserving the Armory as an entertainment venue instead of converting it to corporate offices
The site
Where in St. Louis is not in the public record. The pin marks the center of St. Louis, not a building, and the outline is St. Louis city.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 17 other published records in Missouri
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- St. Louis, St. Louis city, Missouri
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Questions about this project
4 questions answered from the record
Who is building St. Louis Armory Data Center?
-
Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.
How much power and water does St. Louis Armory Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does St. Louis Armory Data Center stand today?
-
It is reported, as reported September 17, 2026. The newest entry, reported September 17, 2026: The project is planned at an 11 acre site in the old Famous Barr warehouse. [1]
What has St. Louis or St. Louis city decided about it?
-
No decision by St. Louis or St. Louis city about data centers is on the record. The St. Louis city page and the Missouri scorecard list every rated row the day a person publishes one.
Sources
Reporting
- Developer behind controversial data center near Armory sues St. Louis - STLPR, STLPR, September 17, 2026, local outlet
- Armory Data Center Deal Advances in St. Louis - stl.news, stl.news, September 15, 2026, local outlet
- St. Louis board allows data center near Armory to move forward with new rules - STLPR, STLPR, July 30, 2026, local outlet
- St. Louis could get $8.3 million from Armory data center by spring - STLtoday.com, STLtoday.com, September 14, 2026, local outlet
4 sources on file.
Cite this record
Data Center Record, "St. Louis Armory Data Center", https://datacenterrecord.org/projects/st-louis-armory-data-center-mo, last verified September 17, 2026.
Cite this page
Data Center Record, "St. Louis Armory Data Center", https://datacenterrecord.org/projects/st-louis-armory-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- st-louis-armory-data-center-mo
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/mo/st-louis-city/st-louis
- Coordinates
- 38.6357896, -90.2451124
- Location precision
- city
- Location source
- City centroid (St. Louis), U.S. Census Bureau TIGERweb, public domain, placed at city level
- Coordinate source
- tigerweb city centroid
- Location source number
- Not disclosed
- Location last verified
- September 17, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-05
- Last verified
- 2026-09-17