Data Center Record.
Census GEOID: 29510 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 8 reporting sources

● Proposed Campus Recorded August 29, 2026 · 2 Buildings

St. Louis Midtown Chouteau Data Center Proposal

Street address Chouteau Avenue and South Grand Boulevard, St. Louis, MO 63103, St. Louis city verified address Exact, at the address [1] stlpr.org

Overview, regulatory gates and specifications

A 2 building data center campus was proposed along the Chouteau Avenue industrial corridor in Midtown St. Louis, Missouri. [1] Armory data center in Midtown is approved before new St. Louis regulations and is regulated by conditional use permit with different sound policies [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
50% renewable energy within 5 years
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Electric utility territory: 50% renewable energy within 5 years.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Chouteau Avenue and South Grand Boulevard, St. Louis, MO 63103.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] stlpr.org
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Midtown Technology Partners as stated by the source
Where its power comes from
50% renewable energy within 5 years as stated by the source
[2] independent.co.uk
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Kasey Fowler-Finn

St. Louis University professor

DID Recorded statement at St Louis Public Radio (September 24, 2026) [3]
SAID Data center noise increases cortisol, cardiovascular risk, decreases cognitive functioning especially in children, and can delay healing in hospital settings (September 24, 2026) [3]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Midtown Technology Partners
UTILITIES
Electric utility: 50% renewable energy within 5 years

View all 5 statements on the record in Missouri →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for St. Louis Midtown Chouteau Data Center Proposal.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings agency filing [1] stlpr.org
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 28, 2026 St. Louis, MO St. Louis Board of Aldermen Board Bill 49 Data Center Regulations Vote St. Louis Board of Aldermen 2 clips

On August 28, 2026, the St. Louis Board of Aldermen voted unanimously to advance Board Bill 49, establishing the city's first comprehensive zoning, conditional use, water disclosure, and noise regulations for data centers.

  1. FOX 2 St. Louis Broadcast Report Broadcast Report transcribed from local broadcast report
    "It establishes size classifications for data centers. Restrictions on where they can be built. Noise, regulations and water use its guidelines. The measure also requires new data centers with loads exceeding 5 megawatts to give 100% of their electricity from renewable energy sources. The bill is sponsored by first ward alderwoman and schweitzer. This is all about"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Lot of concerns about the proliferation of data centers and the amount of energy that they use and will continue to use and the effect. On our on our climate, on environment, on our ability to exist in this world. So I think it's really important that we in the local level act to protect the people we represent. Even if that means fighting against some pretty powerful interests."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Armory data center in Midtown is approved before new St. Louis regulations and is regulated by conditional use permit with different sound policies

    [3] stlpr.org

  2. (source date; the content gives no date of its own)

    Permit upheld by Board of Adjustment in July

    [2] independent.co.uk

  3. · Status: proposed Filing (source date; the content gives no date of its own)

    Developer David Lambiaso filed suit against the city's Board of Adjustment challenging two conditions imposed on the data center construction

    [1] stlpr.org

  4. (source date; the content gives no date of its own)

    Renewable energy must power 50% of facility in first five years, 100% within 10 years

    [4] stlpr.org

  5. (source date; the content gives no date of its own)

    Construction expected to begin August 2027 and be completed by late 2029

    [4] stlpr.org

  6. · Status: approved (source date; the content gives no date of its own)

    Land Clearance for Redevelopment Authority approved community benefit plan for TerraWatt data center at 3728 Market Street

    [4] stlpr.org

  7. · Status: proposed (content date)

    A proposed Midtown data center in St. Louis prompted residents and organizations to file a lawsuit against the project.

    [1] stlpr.org

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Missouri

Verified data center records in Missouri within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
St. Louis Armory Data Center Proposal St. Louis, St. Louis city Less than 1 mi Proposed Midtown Redevelopment 1 building
TierPoint St. Louis Downtown (2300 Locust Street) St. Louis, St. Louis city 1 mi Running TierPoint 1 building
H5 Data Centers St. Louis St. Louis, St. Louis city 2 mi Running H5 Data Centers 8 MW
Netrality and Digital Realty 210 North Tucker Carrier Hotel St. Louis, St. Louis city 2 mi Running Netrality Data Centers / Digital Realty 22 MW
TierPoint St. Louis Downtown Data Center (Olive) St. Louis, St. Louis city 2 mi Running TierPoint 10 MW
Netrality St. Louis 900 Walnut Carrier Hotel St. Louis, St. Louis city 2 mi Running Netrality Data Centers 12 MW

Blank cell: not disclosed by any source on file.

Common questions about St. Louis Midtown Chouteau Data Center Proposal

Answered directly from the verified filings and local actions on this page.

Who is building St. Louis Midtown Chouteau Data Center Proposal?

Midtown Technology Partners is the developer. No construction contractor is named on the record yet.

How much power and water does St. Louis Midtown Chouteau Data Center Proposal say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does St. Louis Midtown Chouteau Data Center Proposal stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Developer behind controversial data center near Armory sues St. Louis (opens in a new tab), St Louis Public Radio, September 17, 2026, local outlet
  2. Data center developer sues city after requiring company to supply renewable energy on site - The Independent (opens in a new tab), The Independent, September 17, 2026, international outlet
  3. How data center noise is different from regular noise pollution, according to a St. Louis scientist (opens in a new tab), St Louis Public Radio, September 24, 2026, local outlet
  4. St. Louis OKs plan for Midtown data center estimated to generate $445M in tax revenue over 10 years (opens in a new tab), St Louis Public Radio, September 15, 2026, local outlet
  5. Data centers across the region move forward (opens in a new tab), St Louis Post-Dispatch, September 16, 2026, local outlet
  6. Midtown data center wins key approval from St. Louis Board of Public Service (opens in a new tab), www.stlmag.com, April 21, 2026, news outlet
  7. 'Pay to play'? Donation adds new controversy to Ferguson data center vote (opens in a new tab), St Louis Post-Dispatch, September 22, 2026, local outlet
  8. Residents, organizations file lawsuit against proposed Midtown data center - KMOV (opens in a new tab), KMOV, August 29, 2026, news outlet

8 sources on file.

Regional grid context

This site is in the SERC Midwest (SRMW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "St. Louis Midtown Chouteau Data Center Proposal", https://datacenterrecord.org/projects/st-louis-midtown-data-center-mo, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "St. Louis Midtown Chouteau Data Center Proposal", https://datacenterrecord.org/projects/st-louis-midtown-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
38.6245, -90.2342
How the location is known
Location from the site's street address.
Location source
https://www.stlouis-mo.gov/
Coordinate source
City of St. Louis Board of Aldermen filing parcel
Location last verified
September 17, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed