Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 1 primary and 11 reporting sources
Amazon operates multiple data centers in Canton, Madison County, and is involved in a tax valuation dispute with the county while also planning a $25 billion expansion in Mississippi creating 2,000 jobs. [2] Filings on the record specify 4 planned or operational buildings. [8] Amazon Web Services is constructing its hyperscale data center campuses in Canton, Madison County, Mississippi. [2]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1001 Highway 22 West, Madison County Mega Site, Canton, MS 39046.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Data centers pay 100% of their own grid connection and usage costs plus create additional benefits like tax revenues, jobs, and bill assistance contributions(August 27, 2026) [4]
Drew Marsh, Entergy chair and CEO, said large customers like data centers help pick up grid maintenance costs existing customers would otherwise bear alone(August 27, 2026) [4]
Amazon press release about Ridgeland and Canton projects states commitment to building data centers responsibly in Mississippi(April 17, 2026) facebook.com (opens in a new tab)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Canton Data Centers.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 4 buildings | Site filing [8] aboutamazon.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: being built (content date)
Amazon Web Services is constructing its hyperscale data center campuses in Canton, Madison County, Mississippi.
(source date; the content gives no date of its own)
Amazon established a workforce partnership for its Mississippi data centers
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Tier after resolution (September 21, 2026). The source on file is clarionledger.com, the publisher's own page. The item reached the record through Google News: "data center" Mississippi, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.
Tier after resolution (September 21, 2026). The source on file is clarionledger.com, the publisher's own page. The item reached the record through Google News: "data center" Mississippi, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.
Every correction on the record is on the corrections page.
Verified data center records in Mississippi within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Ridgeland Data Center Ridgeland, Madison County | ~3 mi | Proposed | ||
| Jackson Lake Hico Data Center Jackson, Hinds County | ~22 mi | Proposed | ||
| Amazon Clinton Data Center Clinton, Hinds County | 24 mi | Running | Amazon | 2 buildings |
Blank cell: not disclosed by any source on file.
DeSoto County News, Aug 25, 2026 (opens in a new tab); The Clarion-Ledger, Sep 3, 2026
Answered directly from the verified filings and local actions on this page.
Amazon is the developer, aboutamazon.com (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, since September 3, 2026. The newest entry, September 3, 2026: Amazon Web Services is constructing its hyperscale data center campuses in Canton, Madison County, Mississippi. [2]
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official developer campus overview or project specification page.
12 sources on file.
This site is in the SERC Mississippi Valley (SRMV) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Amazon Canton Data Centers. Last verified November 6, 2026. https://datacenterrecord.org/projects/amazon-canton-data-centers-ms. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Amazon Canton Data Centers
Data Center Record, "Amazon Canton Data Centers", https://datacenterrecord.org/projects/amazon-canton-data-centers-ms. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.